{"id":115893,"date":"2017-11-29T13:41:53","date_gmt":"2017-11-29T16:41:53","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=115893"},"modified":"2017-11-29T14:33:27","modified_gmt":"2017-11-29T17:33:27","slug":"iniciaron-las-obras-de-la-segunda-etapa-del-perrupato","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/iniciaron-las-obras-de-la-segunda-etapa-del-perrupato\/","title":{"rendered":"Iniciaron las obras de la segunda etapa del Perrupato"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_91942\" class=\"m_2294764050204797266yiv9399947046MsoNormal\"><i id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_91941\">Las tareas incluyen la construcci&oacute;n de los consultorios externos, un buffet, una farmacia y un espacio para mam&aacute;s de beb&eacute;s prematuros. Con $42 millones de inversi&oacute;n, se sumar&aacute;n 1.300 m2.<\/i><\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_91943\" class=\"m_2294764050204797266yiv9399947046MsoNormal\"><i>&nbsp;<\/i><\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_91944\" class=\"m_2294764050204797266yiv9399947046MsoNormal\">El Ministerio de Econom&iacute;a, Infraestructura y Energ&iacute;a inici&oacute; los movimientos de suelo de la segunda etapa de ampliaci&oacute;n del Hospital Perrupato. El centro asistencial de San Mart&iacute;n ya hab&iacute;a sido intervenido cuando sum&oacute; la construcci&oacute;n de 1.530 metros cuadrados nuevos y la remodelaci&oacute;n de otros 220, donde se concentran hoy los servicios de oncolog&iacute;a, esterilizaci&oacute;n, lavadero, rehabilitaci&oacute;n y diagn&oacute;stico por im&aacute;genes.<\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_92257\" class=\"m_2294764050204797266yiv9399947046MsoNormal\"><\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_91947\" class=\"m_2294764050204797266yiv9399947046MsoNormal\">Con una inversi&oacute;n de $42 millones, la misma empresa que ejecut&oacute; la primera ampliaci&oacute;n hoy se encarga de la construcci&oacute;n de los consultorios externos, confiter&iacute;a, farmacia y un nuevo espacio para albergar a las mam&aacute;s de beb&eacute;s prematuros.<\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_92258\" class=\"m_2294764050204797266yiv9399947046MsoNormal\"><\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_92105\" class=\"m_2294764050204797266yiv9399947046MsoNormal\">El Hospital Perrupato atiende aproximadamente 17.000 consultas mensuales, por lo que desde su inauguraci&oacute;n, en 1991, ha crecido y cambiado los requerimientos de los pacientes. Gracias a las obras realizadas por el Gobierno de Mendoza, se est&aacute; convirtiendo este espacio sanitario en un hospital moderno y acorde con las demandas de salud actuales.<\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_92108\" class=\"m_2294764050204797266yiv9399947046MsoNormal\"><\/div>\n<div id=\"m_2294764050204797266yui_3_16_0_ym19_1_1511956511244_91949\" class=\"m_2294764050204797266yiv9399947046MsoNormal\">Esta segunda etapa representa una adicci&oacute;n en m&aacute;s de 1.300 metros cuadrados a la superficie original del edificio, situaci&oacute;n que colaborar&aacute; para descomprimir a&uacute;n m&aacute;s la gran demanda de pacientes.<\/div>\n<div><\/div>\n<div><img loading=\"lazy\" class=\"alignnone wp-image-115894 img-responsive center-block\" src=\"https:\/\/www.mendoza.gov.ar\/prensa\/wp-content\/uploads\/sites\/5\/2017\/11\/Hospital-Perrupato-250x141.jpg\" alt=\"\" width=\"650\" height=\"366\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/11\/Hospital-Perrupato-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/11\/Hospital-Perrupato-768x433.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/11\/Hospital-Perrupato-700x395.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/11\/Hospital-Perrupato-120x68.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/11\/Hospital-Perrupato.jpg 800w\" sizes=\"(max-width: 650px) 100vw, 650px\"><\/div>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Las tareas incluyen la construcci&oacute;n de los consultorios externos, un buffet, una farmacia y un espacio para mam&aacute;s de beb&eacute;s prematuros. Con $42 millones de inversi&oacute;n, se sumar&aacute;n 1.300 m2. &nbsp; El Ministerio de Econom&iacute;a, Infraestructura y Energ&iacute;a inici&oacute; los movimientos de suelo de la segunda etapa de ampliaci&oacute;n del Hospital Perrupato. El centro asistencial&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/iniciaron-las-obras-de-la-segunda-etapa-del-perrupato\/\"><\/a>","protected":false},"author":77,"featured_media":115894,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/115893"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/77"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=115893"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/115893\/revisions"}],"predecessor-version":[{"id":115940,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/115893\/revisions\/115940"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/115894"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=115893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=115893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=115893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}