{"id":117915,"date":"2017-12-17T07:11:02","date_gmt":"2017-12-17T10:11:02","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=117915"},"modified":"2017-12-16T09:58:54","modified_gmt":"2017-12-16T12:58:54","slug":"la-ampliacion-del-hospital-schestakow-se-licitara-en-el-primer-trimestre-de-2018","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/la-ampliacion-del-hospital-schestakow-se-licitara-en-el-primer-trimestre-de-2018\/","title":{"rendered":"La ampliaci\u00f3n del Hospital Schestakow se licitar\u00e1 en el primer trimestre de 2018"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p><em>Con el anteproyecto terminado y el proceso de elaboraci&oacute;n de la documentaci&oacute;n t&eacute;cnica avanzado, la obra ser&aacute; concursada y podr&aacute; ejecutarse el pr&oacute;ximo a&ntilde;o.<\/em><\/p>\n<p>La Direcci&oacute;n de Proyectos y Arquitectura del Ministerio de Econom&iacute;a, Infraestructura y Energ&iacute;a culmin&oacute; la elaboraci&oacute;n del anteproyecto para la primera etapa de ampliaci&oacute;n y refuncionalizaci&oacute;n del Hospital Schestakow en el departamento de San Rafael.<\/p>\n<p>La obra a construirse en el predio del Hospital Schestakow tendr&aacute; dos fases. La primera ser&aacute; la construcci&oacute;n del nuevo edificio que dar&aacute; lugar a la prestaci&oacute;n de nuevos y mejores servicios sanitarios, mientras que la segunda parte incluir&aacute; la refuncionalizaci&oacute;n y uni&oacute;n del viejo edificio con la nueva estructura.<\/p>\n<p>En esta primera etapa se prev&eacute; la construcci&oacute;n de 6.028 m2 cubiertos distribuidos en tres niveles: planta baja, primer y segundo piso, con el agregado de una pasarela cubierta que unir&aacute; el edifico existente con la nueva construcci&oacute;n.<\/p>\n<p><strong>Planta baja<\/strong><\/p>\n<p>Con una superficie cubierta de 2.069 m2, en este sector se ubicar&aacute;n los servicios de urgencias con esperas diferenciadas en dos sectores: Atenci&oacute;n pedi&aacute;trica y Atenci&oacute;n adultos, con 6 boxes de consulta cada uno m&aacute;s la enfermer&iacute;a y un &aacute;rea de apoyo. Aqu&iacute; tambi&eacute;n funcionar&aacute; el Servicio de Contadur&iacute;a, destinado a la atenci&oacute;n de proveedores, el Servicio de Mantenimiento con las salas de m&aacute;quinas, taller, dep&oacute;sito y sector de choferes de guardia, y el Servicio de Salud Mental, que permitir&aacute; la atenci&oacute;n externa y contar&aacute; con 4 consultorios, c&aacute;mara Gesell y &aacute;rea destinada a los talleres.<\/p>\n<p>Adem&aacute;s, en la planta baja se ubicar&aacute; un auditorio con capacidad para 100 personas para realizar cursos, conferencias y capacitaciones.<\/p>\n<p><strong>Primer piso<\/strong><\/p>\n<p>Con una superficie cubierta de 2.097 m2, se organizaran los servicios de internaci&oacute;n de Salud Mental, Unidad de Cuidados Intensivos Cardiol&oacute;gicos, Servicio de Hemodinamia, &Aacute;rea de Personal de Guardia y zona Administrativa, distribuidos de la siguiente forma:<\/p>\n<ul>\n<li>Zona Administrativa: compuesta por una &aacute;rea de RRHH con sus dependencias correspondientes. &Aacute;rea de Direcci&oacute;n: Direcci&oacute;n Regi&oacute;n Sanitaria Sur, Direcci&oacute;n General del Hospital, gerente administrativo, gerente asistencial, secretar&iacute;a general y &aacute;reas de apoyo respectivas. &Aacute;rea de Contadur&iacute;a: Tesorer&iacute;a, Inventario y &aacute;reas de apoyo.<\/li>\n<li>Unidad de Cuidados Intensivos Cardiol&oacute;gicos: con 6 cub&iacute;culos de tratamiento, Enfermer&iacute;a y &aacute;reas de apoyo, 3 oficinas donde se incorpora una de atenci&oacute;n a la familia destinada al uso de los m&eacute;dicos cuando deban dar informes especiales a los familiares de pacientes, &aacute;rea de Transferencia personal t&eacute;cnico y pacientes.<\/li>\n<li>Servicio de Hemodinamia: contar&aacute; con &aacute;reas de Transferencia de paciente internado y paciente ambulatorio, 3 camas de recuperaci&oacute;n, una sala de procedimientos, consultorio de preingreso e informes, Enfermer&iacute;a central y &aacute;reas de apoyo.<\/li>\n<li>&Aacute;rea de Personal de Guardia: 6 habitaciones con ba&ntilde;o privado, capacidad de 4 camas cada una y diferenciadas por sexo.<\/li>\n<li>Salud Mental: 10 habitaciones de internaci&oacute;n con ba&ntilde;o privado y capacidad 2 camas diferenciadas por sexo, una de aislado, donde todas contar&aacute;n con vistas al exterior. Estar, <em>office<\/em> y comedor para pacientes, dos consultorios internos, &aacute;rea de Jefaturas, Enfermer&iacute;a central y sus &aacute;reas de apoyo; Guardia, con dos habitaciones con ba&ntilde;o privado diferenciadas por sexo.<\/li>\n<\/ul>\n<p><strong>Segundo piso<\/strong><\/p>\n<p>Con una superficie cubierta de 1.862 m2, en este nivel se realizar&aacute; la pasarela de conexi&oacute;n con el antiguo edificio y la terraza, que tendr&aacute; helipuerto para traslados de urgencia.<\/p>\n<p>Aqu&iacute; la organizaci&oacute;n se realizara de la siguiente forma:<\/p>\n<ul>\n<li>Servicio de Esterilizaci&oacute;n: 3 autoclaves, 2 hornos esterilizadores, 1 equipo de per&oacute;xido de hidr&oacute;geno y sala para campana de flujo laminal. Dep&oacute;sitos de material esterilizado y &aacute;reas de recepci&oacute;n, clasificaci&oacute;n y preparado de materiales a esterilizar. Oficinas administrativas y sus &aacute;reas de apoyo.<\/li>\n<li>Neonatolog&iacute;a: &aacute;rea de Prealta con 8 incubadoras, &aacute;rea de terapia intensiva con 10 incubadoras, y &aacute;rea de aislados con, 4 incubadoras. Transferencias diferenciadas de profesionales y familiares, Enfermer&iacute;a central y sus &aacute;reas de apoyo, oficinas administrativas y de atenci&oacute;n a la familia y &aacute;rea de Lactario, con 5 cub&iacute;culos de extracci&oacute;n y sus &aacute;reas de apoyo.<\/li>\n<li>&Aacute;rea de Personal de Guardia: 4 habitaciones con ba&ntilde;o privado, capacidad de 4 camas cada una y diferenciadas por sexo. Estar <em>office<\/em>.<\/li>\n<li>Obstetricia: 2 salas de UTPR, 1 quir&oacute;fano de partos, 1 sala de partos cada una con su respectiva recepci&oacute;n al reci&eacute;n nacido, &aacute;rea de preparto con 2 camas, &aacute;rea de recuperaci&oacute;n 2 camas, Transferencias diferenciadas de profesionales y familiares. Box y consultorio de ingreso, sala de informes, oficinas administrativas, Enfermer&iacute;a central con sus &aacute;reas de apoyo y 2 habitaciones de internaci&oacute;n para observaci&oacute;n de d&iacute;a (domicilios alejados).<\/li>\n<\/ul>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-117915'><div class='gallery-item' data-toggle='modal' data-target='#117918' id='r117918'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"117918\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/la-ampliacion-del-hospital-schestakow-se-licitara-en-el-primer-trimestre-de-2018\/schestakow\/'><img width=\"700\" height=\"477\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-700x477.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-700x477.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-250x170.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-768x524.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-120x82.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow.jpeg 1018w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#117919\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#117919' id='r117919'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-2-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"117919\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#117918\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/la-ampliacion-del-hospital-schestakow-se-licitara-en-el-primer-trimestre-de-2018\/schestakow-2\/'><img width=\"700\" height=\"508\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-2-700x508.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-2-700x508.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-2-250x182.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-2-768x558.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-2-120x87.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2017\/12\/Schestakow-2.jpeg 1026w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#117918\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Con el anteproyecto terminado y el proceso de elaboraci&oacute;n de la documentaci&oacute;n t&eacute;cnica avanzado, la obra ser&aacute; concursada y podr&aacute; ejecutarse el pr&oacute;ximo a&ntilde;o. La Direcci&oacute;n de Proyectos y Arquitectura del Ministerio de Econom&iacute;a, Infraestructura y Energ&iacute;a culmin&oacute; la elaboraci&oacute;n del anteproyecto para la primera etapa de ampliaci&oacute;n y refuncionalizaci&oacute;n del Hospital Schestakow en el&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/la-ampliacion-del-hospital-schestakow-se-licitara-en-el-primer-trimestre-de-2018\/\"><\/a>","protected":false},"author":68,"featured_media":117918,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/117915"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=117915"}],"version-history":[{"count":5,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/117915\/revisions"}],"predecessor-version":[{"id":117983,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/117915\/revisions\/117983"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/117918"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=117915"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=117915"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=117915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}