{"id":121462,"date":"2018-01-20T08:00:43","date_gmt":"2018-01-20T11:00:43","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=121462"},"modified":"2018-01-19T19:05:57","modified_gmt":"2018-01-19T22:05:57","slug":"avanza-la-construccion-de-los-nuevos-consultorios-del-hospital-perrupato","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/avanza-la-construccion-de-los-nuevos-consultorios-del-hospital-perrupato\/","title":{"rendered":"Avanza la construcci\u00f3n de los nuevos consultorios del Hospital Perrupato"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p><em>Con $42 millones de inversi&oacute;n, se sumar&aacute;n 1.300 metros cuadrados. Iniciaron los movimientos de suelo y la preparaci&oacute;n de la plataforma sobre la que se edificar&aacute; el nuevo espacio sanitario.<\/em><\/p>\n<p>El Ministerio de Econom&iacute;a, Infraestructura y Energ&iacute;a inici&oacute; los movimientos de suelo de la segunda etapa de ampliaci&oacute;n del Hospital Perrupato. El centro asistencial de San Mart&iacute;n ya hab&iacute;a sido intervenido cuando sum&oacute; la construcci&oacute;n de 1.530 metros cuadrados nuevos y la remodelaci&oacute;n de otros 220, donde se concentran hoy los servicios de oncolog&iacute;a, esterilizaci&oacute;n, lavadero, rehabilitaci&oacute;n y diagn&oacute;stico por im&aacute;genes.<\/p>\n<p>Con una inversi&oacute;n de $42 millones, la misma empresa que ejecut&oacute; la primera ampliaci&oacute;n hoy se encarga de la construcci&oacute;n de los consultorios externos, confiter&iacute;a, farmacia y un nuevo espacio para albergar a las mam&aacute;s de beb&eacute;s prematuros.<\/p>\n<p>El Hospital Perrupato atiende aproximadamente 17.000 consultas mensuales, por lo que desde su inauguraci&oacute;n, en 1991, ha crecido y cambiado los requerimientos de los pacientes. Gracias a las obras realizadas por el Gobierno de Mendoza, se est&aacute; convirtiendo este espacio sanitario en un hospital moderno y acorde con las demandas de salud actuales.<\/p>\n<p>Esta segunda etapa representa una adicci&oacute;n en m&aacute;s de 1.300 metros cuadrados a la superficie original del edificio, situaci&oacute;n que colaborar&aacute; para descomprimir a&uacute;n m&aacute;s la gran demanda de pacientes. Finalizada esta segunda ampliaci&oacute;n, el centro asistencial cabecera de la zona Este habr&aacute; sumado m&aacute;s de 2.850 metros cuadrados, que representan el 21% del tama&ntilde;o inicial del edificio, que era de 12.991 metros cuadrados.<\/p>\n<p><img loading=\"lazy\" width=\"250\" height=\"188\" class=\"alignnone size-medium wp-image-121463 img-responsive center-block\" src=\"https:\/\/www.mendoza.gov.ar\/prensa\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-250x188.jpeg\" alt=\"\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34.jpeg 1032w\" sizes=\"(max-width: 250px) 100vw, 250px\"> <img loading=\"lazy\" width=\"250\" height=\"188\" class=\"alignnone size-medium wp-image-121464 img-responsive center-block\" src=\"https:\/\/www.mendoza.gov.ar\/prensa\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-1-250x188.jpeg\" alt=\"\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-1-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-1-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-1-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-1-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.45.34-1.jpeg 1032w\" sizes=\"(max-width: 250px) 100vw, 250px\"> <img loading=\"lazy\" width=\"250\" height=\"188\" class=\"alignnone size-medium wp-image-121465 img-responsive center-block\" src=\"https:\/\/www.mendoza.gov.ar\/prensa\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.47.32-250x188.jpeg\" alt=\"\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.47.32-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.47.32-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.47.32-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.47.32-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/WhatsApp-Image-2018-01-11-at-10.47.32.jpeg 1032w\" sizes=\"(max-width: 250px) 100vw, 250px\"><\/p>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Con $42 millones de inversi&oacute;n, se sumar&aacute;n 1.300 metros cuadrados. Iniciaron los movimientos de suelo y la preparaci&oacute;n de la plataforma sobre la que se edificar&aacute; el nuevo espacio sanitario. El Ministerio de Econom&iacute;a, Infraestructura y Energ&iacute;a inici&oacute; los movimientos de suelo de la segunda etapa de ampliaci&oacute;n del Hospital Perrupato. El centro asistencial de&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/avanza-la-construccion-de-los-nuevos-consultorios-del-hospital-perrupato\/\"><\/a>","protected":false},"author":63,"featured_media":121465,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/121462"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=121462"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/121462\/revisions"}],"predecessor-version":[{"id":121509,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/121462\/revisions\/121509"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/121465"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=121462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=121462"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=121462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}