{"id":137872,"date":"2018-06-04T09:04:01","date_gmt":"2018-06-04T12:04:01","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=137872"},"modified":"2018-06-04T09:13:04","modified_gmt":"2018-06-04T12:13:04","slug":"a-fines-de-julio-estara-lista-la-reparacion-integral-de-la-escuela-carlos-pellegrini","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/a-fines-de-julio-estara-lista-la-reparacion-integral-de-la-escuela-carlos-pellegrini\/","title":{"rendered":"A fines de julio estar\u00e1 lista la reparaci\u00f3n integral de la Escuela Carlos Pellegrini"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><em><span lang=\"ES-AR\">Los trabajos avanzan sin pausa y la contratista ya coloc&oacute; la totalidad de la nueva cubierta, en remplazo de la existente, que sufri&oacute; da&ntilde;os por granizo y ten&iacute;a serias filtraciones. La obra incluye adem&aacute;s el arreglo integral de los sanitarios y pintura para el edificio. Inversi&oacute;n de $3.300.000.<\/span><\/em><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">La Subsecretar&iacute;a de Infraestructura Social B&aacute;sica contin&uacute;a a paso firme con la reparaci&oacute;n integral de la Escuela 1-629 Carlos Pellegrini de Godoy Cruz. El establecimiento sufri&oacute; roturas en su techo a ra&iacute;z del granizo y ten&iacute;a serias filtraciones, situaci&oacute;n que perjudicaba el normal dictado de clases cada vez que llov&iacute;a.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">La firma contratista encargada de las tareas, Vakfi SRL, ya coloc&oacute; la totalidad de la nueva cubierta, entre otros trabajos, y la obra muestra un avance general de 85%.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">Est&aacute; previsto que las tareas sean concluidas a fines de julio. Tienen un presupuesto oficial de $3.300.000, financiado con fondos &iacute;ntegramente provinciales.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">Adem&aacute;s del recambio completo de los techos, los trabajos contemplan la colocaci&oacute;n de nuevos cielorrasos de placas de yeso suspendido, la intervenci&oacute;n de los grupos sanitarios, la reparaci&oacute;n integral del sistema el&eacute;ctrico en ambas plantas y la pintura de todo el inmueble.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><b><span lang=\"ES-AR\">Fue inhabilitada durante todo el primer semestre<\/span><\/b><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">Por los da&ntilde;os ocasionados por el granizo, el edificio escolar ubicado en el barrio Pablo VI fue inhabilitado todo el primer semestre por la Direcci&oacute;n de Mantenimiento y Reparaciones de Escuelas de la Pprovincia, dado que cada vez que llov&iacute;a se inundaban varios sectores.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">A ra&iacute;z de este inconveniente, alumnos y docentes tuvieron que ser reubicados en la Escuela Fernando Fader, que se encuentra en la misma zona.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">&ldquo;La Carlos Pellegrini es una de las escuelas que m&aacute;s necesitaban los arreglos en sus techos, dado que tuvimos que inhabilitarla por el nivel de da&ntilde;o que presentaba su cubierta&rdquo;, indic&oacute; el subdirector de Mantenimiento y Reparaciones de Escuelas, Emilio Pastorino.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">La obra en la Escuela Carlos Pellegrini se suma a las que se est&aacute;n realizando en las escuelas Jos&eacute; Albino Guti&eacute;rrez, de Maip&uacute;; Dr. Tom&aacute;s Godoy Cruz, de Godoy Cruz, y Neuqu&eacute;n, de San Mart&iacute;n, inmuebles escolares que tampoco estar&aacute;n disponibles hasta mediados de a&ntilde;o.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">Estos trabajos forman parte de un paquete de 65 establecimientos que tambi&eacute;n necesitan un arreglo integral de sus cubiertas de techo, afectados por lluvias, con una inversi&oacute;n total de $193 millones, financiados con fondos compartidos entre la Provincia y la Naci&oacute;n. Con estas obras se va a beneficiar a m&aacute;s de 20 mil alumnos de los distintos niveles educativos.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><b><span lang=\"ES-AR\">Est&aacute;n en reparaci&oacute;n pero con clases<\/span><\/b><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">A diferencia de los establecimientos mencionados, hay en la actualidad otros inmuebles educativos que est&aacute;n en obra, pero en &ldquo;convivencia&rdquo; con las actividades. Se trata de las escuelas 1-051 Mar&iacute;a Cremaschi de Cavagnaro, de Maip&uacute;, y 4-036 Ra&uacute;l Scalabrini Ortiz, de Godoy Cruz.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">Siguen en plena ejecuci&oacute;n el arreglo de los techos y desag&uuml;es pluviales de las escuelas 1-520 Mar&iacute;a Basaure de Mart&iacute;nez, 1-014 Dr. Alejandro Mathus, 1-021 Dalmacio V&eacute;lez Sarsfield y 1-533 Pr&oacute;ceres de la Independencia, todas de Guaymall&eacute;n.<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">A este listado de arreglos se suman las escuelas 1-098 Carmen Ponce de Videla (Capital), 2-007 Dr. Emilio Coni (Godoy Cruz), 1-556 Miguel Ramponi (Guaymall&eacute;n), 1-559 Manuel Corominola (Las Heras), 1-482 Tom&aacute;s Alva Edison (Guaymall&eacute;n) y 1-183 Correo Argentino (Lavalle).<\/span><\/p>\n<p class=\"m_224884525774295900ydpcce98a3eyiv8647195308ydpfc372094MsoNormal\"><span lang=\"ES-AR\">Adem&aacute;s, aparecen en obra las escuelas 1-261 Juan Cruz Varela (Lavalle), 1-714 Ciudad de Brasilia (Godoy Cruz), 1-268 Jos&eacute; Pedro Varela (Maip&uacute;), el albergue 8-466 Abraham Lincoln (Lavalle), 4-097 Profesora Cosma de Lede (Maip&uacute;) y 1-542 Pedro Molina Henr&iacute;quez, de Guaymall&eacute;n.<\/span><\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-137872'><div class='gallery-item' data-toggle='modal' data-target='#137873' id='r137873'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.03-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"137873\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/a-fines-de-julio-estara-lista-la-reparacion-integral-de-la-escuela-carlos-pellegrini\/whatsapp-image-2018-05-31-at-11-13-03\/'><img width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.03-700x525.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.03-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.03-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.03-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.03-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.03.jpeg 1040w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#137874\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#137874' id='r137874'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.02-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"137874\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#137873\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/a-fines-de-julio-estara-lista-la-reparacion-integral-de-la-escuela-carlos-pellegrini\/whatsapp-image-2018-05-31-at-11-13-02\/'><img width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.02-700x525.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.02-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.02-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.02-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.02-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-05-31-at-11.13.02.jpeg 1040w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#137873\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Los trabajos avanzan sin pausa y la contratista ya coloc&oacute; la totalidad de la nueva cubierta, en remplazo de la existente, que sufri&oacute; da&ntilde;os por granizo y ten&iacute;a serias filtraciones. La obra incluye adem&aacute;s el arreglo integral de los sanitarios y pintura para el edificio. Inversi&oacute;n de $3.300.000. La Subsecretar&iacute;a de Infraestructura Social B&aacute;sica contin&uacute;a&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/a-fines-de-julio-estara-lista-la-reparacion-integral-de-la-escuela-carlos-pellegrini\/\"><\/a>","protected":false},"author":61,"featured_media":137873,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/137872"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=137872"}],"version-history":[{"count":4,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/137872\/revisions"}],"predecessor-version":[{"id":137882,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/137872\/revisions\/137882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/137873"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=137872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=137872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=137872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}