{"id":138281,"date":"2018-06-07T10:18:02","date_gmt":"2018-06-07T13:18:02","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=138281"},"modified":"2018-06-07T18:32:00","modified_gmt":"2018-06-07T21:32:00","slug":"infraestructura-comenzara-en-julio-la-reparacion-integral-de-la-escuela-bernardo-ohiggins","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-comenzara-en-julio-la-reparacion-integral-de-la-escuela-bernardo-ohiggins\/","title":{"rendered":"Infraestructura comenzar\u00e1 en julio la reparaci\u00f3n integral de la Escuela Bernardo O\u00b4Higgins"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><em><span lang=\"ES-AR\">La obra en el establecimiento de Las Heras est&aacute; compuesta por 200 metros de cubierta nueva y desag&uuml;es pluviales, en el sector de gobierno y cocina. Adem&aacute;s, se har&aacute; un arreglo general de sanitarios, entre otros. Habr&aacute; una inversi&oacute;n de $3 millones. Beneficiar&aacute; a m&aacute;s de 500 alumnos.<\/span><\/em><\/p>\n<p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><span lang=\"ES-AR\">La Subsecretar&iacute;a de Infraestructura Social B&aacute;sica comenzar&aacute; en julio la reparaci&oacute;n integral de la Escuela 1-608 Bernardo O&rsquo;Higgins de Las Heras, obra que incluye un sector de techo nuevo y sanitarios.<\/span><\/p>\n<p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><span lang=\"ES-AR\">Adem&aacute;s del recambio de m&aacute;s de 200 metros cuadrados de cubierta, instalaci&oacute;n el&eacute;ctrica y desag&uuml;es pluviales en la zona de gobierno y administraci&oacute;n, los trabajos contemplan la intervenci&oacute;n de los grupos sanitarios, entre otros.<\/span><\/p>\n<p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><span lang=\"ES-AR\">Para concretar las tareas, que tendr&aacute;n un presupuesto de $3 millones (a trav&eacute;s de la modalidad de coeficiente de impacto zonal), se realiz&oacute; el llamado a licitaci&oacute;n p&uacute;blica, con el objetivo de convocar la mayor cantidad de firmas oferentes posibles.<\/span><\/p>\n<p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><span lang=\"ES-AR\">Estos trabajos en la escuela O&rsquo;Higgins integran un paquete de 65 establecimientos que tambi&eacute;n necesitaban un arreglo de sus cubiertas de techo, afectados especialmente por filtraciones.<\/span><\/p>\n<p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><span lang=\"ES-AR\">Con estas reparaciones se va a beneficiar a m&aacute;s de 20 mil alumnos de los distintos niveles educativos. Infraestructura realiza una inversi&oacute;n total de $193 millones, financiados con fondos compartidos entre la Provincia y la Naci&oacute;n.<\/span><\/p>\n<p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><span lang=\"ES-AR\">La obra en el establecimiento ubicado en la esquina de Bariloche y Huarpes del barrio Municipal tendr&aacute; un plazo de ejecuci&oacute;n de 300 d&iacute;as y en este caso ser&aacute; financiada &iacute;ntegramente con fondos provinciales.<\/span><\/p>\n<p class=\"m_6993500887981458052ydp5aad5977yiv7468545411ydp2c17fb3MsoNormal\"><span lang=\"ES-AR\">La apertura de las propuestas econ&oacute;micas se realizar&aacute; el pr&oacute;ximo 25 de junio, a las 9, en la sede la Subsecretar&iacute;a de Infraestructura Social B&aacute;sica, Belgrano Oeste 210, planta baja. All&iacute;, para los interesados tambi&eacute;n se ofrecer&aacute; m&aacute;s informaci&oacute;n, consultas y venta de pliegos.<\/span><\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-138281'><div class='gallery-item' data-toggle='modal' data-target='#138282' id='r138282'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/Escuela-OHiggins-150x150.jpg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"138282\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-comenzara-en-julio-la-reparacion-integral-de-la-escuela-bernardo-ohiggins\/escuela-ohiggins\/'><img width=\"700\" height=\"416\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/Escuela-OHiggins-700x416.jpg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/Escuela-OHiggins-700x416.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/Escuela-OHiggins-250x149.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/Escuela-OHiggins-768x457.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/Escuela-OHiggins-120x71.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/Escuela-OHiggins.jpg 1024w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138282\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"La obra en el establecimiento de Las Heras est&aacute; compuesta por 200 metros de cubierta nueva y desag&uuml;es pluviales, en el sector de gobierno y cocina. Adem&aacute;s, se har&aacute; un arreglo general de sanitarios, entre otros. Habr&aacute; una inversi&oacute;n de $3 millones. Beneficiar&aacute; a m&aacute;s de 500 alumnos. La Subsecretar&iacute;a de Infraestructura Social B&aacute;sica comenzar&aacute;&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-comenzara-en-julio-la-reparacion-integral-de-la-escuela-bernardo-ohiggins\/\"><\/a>","protected":false},"author":61,"featured_media":138282,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/138281"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=138281"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/138281\/revisions"}],"predecessor-version":[{"id":138347,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/138281\/revisions\/138347"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/138282"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=138281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=138281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=138281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}