{"id":138539,"date":"2018-06-09T09:00:41","date_gmt":"2018-06-09T12:00:41","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=138539"},"modified":"2018-06-08T18:21:11","modified_gmt":"2018-06-08T21:21:11","slug":"esta-al-70-la-reparacion-integral-de-la-escuela-neuquen-de-san-martin","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/esta-al-70-la-reparacion-integral-de-la-escuela-neuquen-de-san-martin\/","title":{"rendered":"Est\u00e1 al 70% la reparaci\u00f3n integral de la escuela Neuqu\u00e9n de San Mart\u00edn"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p><em>Se espera terminar la obra luego del receso invernal. La contratista ya remplaz&oacute; 1.300 metros cuadrados de cubierta nueva y cielorrasos. Adem&aacute;s, se est&aacute; haciendo una reparaci&oacute;n integral del sistema cloacal y la instalaci&oacute;n el&eacute;ctrica. Inversi&oacute;n de m&aacute;s de $5 millones.<\/em><\/p>\n<p>La reparaci&oacute;n integral de la escuela 1-165 Neuqu&eacute;n, de San Mart&iacute;n, muestra un avance actual del 70% y la Subsecretar&iacute;a de Infraestructura Social B&aacute;sica tiene previsto terminar la obra luego de las vacaciones de invierno.<\/p>\n<p>Se trata del recambio completo del techo, que ya se ejecut&oacute; junto a los cielorrasos, y de otras reparaciones complementarias que hac&iacute;an falta en el edificio educativo ubicado en el distrito Orfila.<\/p>\n<p>Los trabajos hasta ahora realizados en el establecimiento comprenden la colocaci&oacute;n total de los 1.300 metros cuadrados de cubierta de chapa de zinc trapezoidal con aislantes, y la instalaci&oacute;n de los cielorrasos suspendidos de placas de yeso.<\/p>\n<p>Adem&aacute;s, en el inmueble escolar del este provincial la firma Malnis est&aacute; ejecutando otras obras como la reparaci&oacute;n integral del sistema cloacal (que se conectar&aacute; a la red p&uacute;blica y se anular&aacute; el pozo s&eacute;ptico existente) y una nueva instalaci&oacute;n el&eacute;ctrica de todo el edificio.<\/p>\n<p>En tanto que la intervenci&oacute;n tambi&eacute;n contempla el remplazo de cenefas y canaletas de chapa galvanizada para desag&uuml;e pluvial. Y la refuncionalizaci&oacute;n integral de los ba&ntilde;os y cocina, donde ya se han colocado los correspondientes cer&aacute;micos.<\/p>\n<p>Una vez terminada, la obra tendr&aacute; una inversi&oacute;n que supera los $5 millones. Y como las tareas demandar&aacute;n m&aacute;s de cinco meses de ejecuci&oacute;n, la Direcci&oacute;n General de Escuelas decidi&oacute; reubicar a docentes y alumnos en dos edificios cercanos, con el objetivo de no perder d&iacute;as de clases puesto que no estar&aacute; disponible durante todo el primer semestre<\/p>\n<p>La obra en la escuela Neuqu&eacute;n se suma las que se est&aacute;n realizando en las escuelas Jos&eacute; Albino Guti&eacute;rrez, de Maip&uacute;, y la Tom&aacute;s Godoy Cruz, de Godoy Cruz, inmuebles escolares que tampoco estar&aacute;n disponibles hasta mediados de a&ntilde;o.<\/p>\n<p>Estos trabajos forman parte de un paquete de 65 establecimientos que tambi&eacute;n necesitan un arreglo integral de sus cubiertas de techo, afectados por las abundantes lluvias que se precipitaron a principios del a&ntilde;o pasado.<\/p>\n<p>Con estas reparaciones, Infraestructura realiza una inversi&oacute;n total de $193 millones, que son financiados con fondos compartidos entre la provincia y la Naci&oacute;n, y se van a beneficiar m&aacute;s de 20 mil alumnos de los distintos niveles educativos.<\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-138539'><div class='gallery-item' data-toggle='modal' data-target='#138540' id='r138540'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-1-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"138540\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/esta-al-70-la-reparacion-integral-de-la-escuela-neuquen-de-san-martin\/whatsapp-image-2018-06-06-at-17-23-34-1\/'><img width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-1-700x394.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-1-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-1-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-1-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-1-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-1.jpeg 1032w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138541\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#138541' id='r138541'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.32-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"138541\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138540\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/esta-al-70-la-reparacion-integral-de-la-escuela-neuquen-de-san-martin\/whatsapp-image-2018-06-06-at-17-23-32\/'><img width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.32-700x394.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.32-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.32-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.32-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.32-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.32.jpeg 1032w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138542\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#138542' id='r138542'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.30-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"138542\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138541\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/esta-al-70-la-reparacion-integral-de-la-escuela-neuquen-de-san-martin\/whatsapp-image-2018-06-06-at-17-23-30\/'><img width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.30-700x394.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.30-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.30-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.30-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.30-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.30.jpeg 1032w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138543\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#138543' id='r138543'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"138543\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138542\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/esta-al-70-la-reparacion-integral-de-la-escuela-neuquen-de-san-martin\/whatsapp-image-2018-06-06-at-17-23-34\/'><img width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-700x394.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/06\/WhatsApp-Image-2018-06-06-at-17.23.34.jpeg 1032w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#138540\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se espera terminar la obra luego del receso invernal. La contratista ya remplaz&oacute; 1.300 metros cuadrados de cubierta nueva y cielorrasos. Adem&aacute;s, se est&aacute; haciendo una reparaci&oacute;n integral del sistema cloacal y la instalaci&oacute;n el&eacute;ctrica. Inversi&oacute;n de m&aacute;s de $5 millones. La reparaci&oacute;n integral de la escuela 1-165 Neuqu&eacute;n, de San Mart&iacute;n, muestra un avance&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/esta-al-70-la-reparacion-integral-de-la-escuela-neuquen-de-san-martin\/\"><\/a>","protected":false},"author":63,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/138539"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=138539"}],"version-history":[{"count":1,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/138539\/revisions"}],"predecessor-version":[{"id":138544,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/138539\/revisions\/138544"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=138539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=138539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=138539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}