{"id":147264,"date":"2018-08-20T10:00:40","date_gmt":"2018-08-20T13:00:40","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=147264"},"modified":"2018-08-20T10:17:56","modified_gmt":"2018-08-20T13:17:56","slug":"infraestructura-continua-con-la-reparacion-integral-del-albergue-abraham-lincoln","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-reparacion-integral-del-albergue-abraham-lincoln\/","title":{"rendered":"Infraestructura contin\u00faa con la reparaci\u00f3n integral del Albergue Abraham Lincoln"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p><em>La obra en el edificio educativo lavallino tiene un avance de 70% y, de acuerdo con el ritmo de trabajo, ser&aacute; concluida en noviembre. Se impermeabilizaron 200 metros cuadrados de techo, se arreglaron ba&ntilde;os y se remplaz&oacute; el tanque de agua. Inversi&oacute;n de casi $1,7 millones.<\/em><\/p>\n<p>La Escuela Albergue 8-466 Abraham Lincoln, de Lavalle, tendr&aacute; sus instalaciones reparadas a fines de noviembre. La obra que est&aacute; realizando en ese edificio la Subsecretar&iacute;a de Infraestructura Social B&aacute;sica tiene un avance de 70%.<\/p>\n<p>Los trabajos se dividieron en dos etapas. En la primera, la firma contratista, Gefa SA, refaccion&oacute; a nuevo los grupos sanitarios. Adem&aacute;s, concret&oacute; la impermeabilizaci&oacute;n de 200 metros cuadrados de cubierta de techo, en la que utiliz&oacute; membrana.<\/p>\n<p>Tambi&eacute;n se hizo el recambio del tanque de agua elevado, incluida la construcci&oacute;n de la base para sostenerlo. En tanto, se ejecutaron algunos arreglos menores en el sistema el&eacute;ctrico.<\/p>\n<p>En los pr&oacute;ximos d&iacute;as, comenzar&aacute; a realizarse una segunda etapa de tareas, que incluyen la reparaci&oacute;n integral de los grupos sanitarios del jard&iacute;n de infantes y la construcci&oacute;n de un pozo de bombeo para optimizar al m&aacute;ximo el uso de la planta de tratamiento de l&iacute;quidos cloacales.<\/p>\n<p>Una vez finalizadas las obras en el edificio escolar ubicado en la localidad La Asunci&oacute;n, en pleno desierto de Lavalle, se habr&aacute; hecho una inversi&oacute;n de casi $1,7 millones, financiados &iacute;ntegramente con fondos nacionales.<\/p>\n<p>Los trabajos en el Albergue Abraham Lincoln forman parte de un paquete de 65 establecimientos que tambi&eacute;n necesitaban arreglo urgente en varios sectores de sus instalaciones, como filtraciones o por desgaste natural. Con estas reparaciones se va a beneficiar a m&aacute;s de 20 mil alumnos de los distintos niveles educativos.<\/p>\n<p>Estas intervenciones demandar&aacute;n una inversi&oacute;n total de m&aacute;s $193 millones, financiados entre la Provincia y la Naci&oacute;n.<\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-147264'><div class='gallery-item' data-toggle='modal' data-target='#147265' id='r147265'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.36-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"147265\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-reparacion-integral-del-albergue-abraham-lincoln\/whatsapp-image-2018-08-17-at-15-37-36\/'><img width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.36-700x525.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.36-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.36-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.36-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.36-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.36.jpeg 1024w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#147266\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#147266' id='r147266'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.37-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"147266\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#147265\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-reparacion-integral-del-albergue-abraham-lincoln\/whatsapp-image-2018-08-17-at-15-37-37\/'><img width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.37-700x525.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.37-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.37-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.37-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.37-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/08\/WhatsApp-Image-2018-08-17-at-15.37.37.jpeg 1024w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#147265\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"La obra en el edificio educativo lavallino tiene un avance de 70% y, de acuerdo con el ritmo de trabajo, ser&aacute; concluida en noviembre. Se impermeabilizaron 200 metros cuadrados de techo, se arreglaron ba&ntilde;os y se remplaz&oacute; el tanque de agua. Inversi&oacute;n de casi $1,7 millones. La Escuela Albergue 8-466 Abraham Lincoln, de Lavalle, tendr&aacute;&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-reparacion-integral-del-albergue-abraham-lincoln\/\"><\/a>","protected":false},"author":63,"featured_media":147266,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/147264"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=147264"}],"version-history":[{"count":5,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/147264\/revisions"}],"predecessor-version":[{"id":147282,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/147264\/revisions\/147282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/147266"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=147264"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=147264"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=147264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}