{"id":162230,"date":"2018-11-19T11:28:42","date_gmt":"2018-11-19T14:28:42","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=162230"},"modified":"2018-11-19T18:00:46","modified_gmt":"2018-11-19T21:00:46","slug":"la-construccion-del-centro-de-salud-no-226-entra-en-su-etapa-final","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/la-construccion-del-centro-de-salud-no-226-entra-en-su-etapa-final\/","title":{"rendered":"La construcci\u00f3n del Centro de Salud 226 entra en su etapa final"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Con 85% de avance, la obra, que estar&aacute; terminada antes de fin de a&ntilde;o, permitir&aacute; atender la demanda sanitaria de la localidad de El Resguardo en Las Heras.<\/h5>\n<p>Invertir en infraestructura destinada a mejorar la prestaci&oacute;n de servicios que reciben todos los mendocinos ha sido, desde el principio de esta gesti&oacute;n, una de las premisas fundamentales al planificar el destino de los fondos p&uacute;blicos. Por eso, el Ministerio de Econom&iacute;a trabaja en la construcci&oacute;n, mejora y ampliaci&oacute;n de la red de centros de salud de la provincia.<\/p>\n<p>En este caso, la construcci&oacute;n del Centro de Salud 226 de El Reguardo, en Las Heras, avanza a paso firme y tan s&oacute;lo basta para concluirlo el 15%. Hasta este momento, la comunidad de la zona se atiende en un edificio alquilado que se encuentra muy deteriorado y no permite satisfacer las demandas de salud.<\/p>\n<p>El proyecto se ejecuta en la prolongaci&oacute;n de la calle Rafael Obligado y en una superficie total de 417 metros cuadrados cubiertos. Se trata de un establecimiento de baja complejidad que se sumar&aacute; al trabajo de los centros de atenci&oacute;n primaria, por lo que descomprimir&aacute; la atenci&oacute;n de las emergencias en otros establecimientos. Se tuvo como premisa proyectar un edificio sin barreras arquitect&oacute;nicas y teniendo en cuenta el acceso y circulaci&oacute;n de personas con capacidades especiales, incorporando rampas y todo tipo de instalaciones y servicios para lograr ese cometido.<\/p>\n<p>Desde la inspecci&oacute;n t&eacute;cnica de la obra detallaron que est&aacute;n terminando el armado de los tableros el&eacute;ctricos y las tareas de pintura. Basta la colocaci&oacute;n del mobiliario, la se&ntilde;al&eacute;tica, los artefactos para la calefacci&oacute;n y la puesta en marcha de los servicios, por lo que se estima que antes de fin de a&ntilde;o la obra estar&aacute; concluida.<\/p>\n<p><strong>Detalles de la obra<\/strong><\/p>\n<p>El Programa de Necesidades, elaborado por el Ministerio de Salud, fue la base del Programa M&eacute;dico Arquitect&oacute;nico, que proyect&oacute; un edificio de 417m2 en un terreno de 530m2 de extensi&oacute;n. Est&aacute; pensado para que el p&uacute;blico ingrese por el costado Este del terreno a trav&eacute;s de una explanada de acceso, conformada por rampa y escalinatas.<\/p>\n<p>El edificio se desarrollar&aacute; en forma de peine, desprendi&eacute;ndose de dos circulaciones paralelas, t&eacute;cnica y p&uacute;blica, entre las cuales se encontrar&aacute; el &aacute;rea de consultorios externos y el &aacute;rea guardia. El servicio de Guardia contar&aacute; con box de atenci&oacute;n e internaci&oacute;n abreviada, que posibilitar&aacute; una observaci&oacute;n del paciente previo a decidir una internaci&oacute;n.<\/p>\n<p>El dise&ntilde;o favorece as&iacute; la iluminaci&oacute;n natural de todas las &aacute;reas de atenci&oacute;n y espera del p&uacute;blico, contribuyendo a crear un espacio asistencial de car&aacute;cter humanizado y amable, con fuerte presencia de luz y vegetaci&oacute;n que se ubicar&aacute; los patios interiores.<\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-162230'><div class='gallery-item' data-toggle='modal' data-target='#162232' id='r162232'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.17-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"162232\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/la-construccion-del-centro-de-salud-no-226-entra-en-su-etapa-final\/whatsapp-image-2018-11-12-at-11-07-17\/'><img width=\"700\" height=\"933\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.17-700x933.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.17-700x933.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.17-250x333.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.17-768x1024.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.17-120x160.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.17.jpeg 960w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#162231\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#162231' id='r162231'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.16-150x150.jpeg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"162231\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#162232\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/la-construccion-del-centro-de-salud-no-226-entra-en-su-etapa-final\/whatsapp-image-2018-11-12-at-11-07-16\/'><img width=\"700\" height=\"933\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.16-700x933.jpeg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.16-700x933.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.16-250x333.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.16-768x1024.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.16-120x160.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/11\/WhatsApp-Image-2018-11-12-at-11.07.16.jpeg 960w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#162232\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Con 85% de avance, la obra, que estar&aacute; terminada antes de fin de a&ntilde;o, permitir&aacute; atender la demanda sanitaria de la localidad de El Resguardo en Las Heras. Invertir en infraestructura destinada a mejorar la prestaci&oacute;n de servicios que reciben todos los mendocinos ha sido, desde el principio de esta gesti&oacute;n, una de las premisas&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/la-construccion-del-centro-de-salud-no-226-entra-en-su-etapa-final\/\"><\/a>","protected":false},"author":63,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/162230"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=162230"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/162230\/revisions"}],"predecessor-version":[{"id":162261,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/162230\/revisions\/162261"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=162230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=162230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=162230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}