{"id":167399,"date":"2018-12-23T08:05:02","date_gmt":"2018-12-23T11:05:02","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=167399"},"modified":"2018-12-24T09:16:26","modified_gmt":"2018-12-24T12:16:26","slug":"estan-al-20-las-construcciones-de-las-escuelas-pierini-ventura-gallegos-y-fuerza-aerea","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/estan-al-20-las-construcciones-de-las-escuelas-pierini-ventura-gallegos-y-fuerza-aerea\/","title":{"rendered":"Est\u00e1n al 20% las construcciones de las escuelas Pierini, Ventura Gallegos y Fuerza A\u00e9rea"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>En los tres establecimientos se est&aacute;n terminando de llenar fundaciones y han comenzado a levantar muros. Infraestructura tiene previsto que las obras concluyan a fines de 2019. Habr&aacute; una inversi&oacute;n total de m&aacute;s de $100 millones. Necesitaban una urgente sustituci&oacute;n de edificio.<\/h5>\n<p>Las construcciones de las escuelas 4-191 Daniel Pierini (Malarg&uuml;e), 1-197 Dr. Ventura Gallegos (Tunuy&aacute;n) y 1-171 Fuerza A&eacute;rea Argentina, de Las Heras, muestran un avance actual promedio del 20%. La Subsecretar&iacute;a de Infraestructura Social B&aacute;sica tiene previsto concluir las obras a fines de 2019.<\/p>\n<p>Los tres establecimientos educativos esperaban una sustituci&oacute;n de edificio desde hace al menos cinco a&ntilde;os.<\/p>\n<p>Luego de haber realizado los correspondientes movimientos de suelo y cierres perimetrales, por estos d&iacute;as se est&aacute;n terminando de llenar las fundaciones y se han comenzado a levantar muros.<\/p>\n<p>En el caso particular de la&nbsp; Escuela Fuerza A&eacute;rea, se demoli&oacute; el viejo edificio, que hab&iacute;a sido inhabilitado porque no reun&iacute;a las condiciones estructurales necesarias para albergar a una comunidad educativa.<\/p>\n<p>Con estas tareas, comenzaron a hacerse realidad viejos anhelos de alumnos y docentes de las tres escuelas, dado que se trata de inmuebles que necesitaban s&iacute; o s&iacute; una estructura nueva, a ra&iacute;z del desgaste natural ocasionado por el paso de los a&ntilde;os.<\/p>\n<p>Est&aacute; previsto que los tres edificios, que demandar&aacute;n una inversi&oacute;n de m&aacute;s de $100 millones (financiados con fondos &iacute;ntegramente provinciales), est&eacute;n terminados a fines de 2019, con el objetivo de iniciar el ciclo lectivo 2020 en las nuevas instalaciones. Con estas obras, se beneficiar&aacute;n m&aacute;s de mil alumnos de nivel inicial, primario y secundario.<\/p>\n<p><strong>Tres edificios que hab&iacute;an cumplido un ciclo<\/strong><\/p>\n<p>En el caso de la Pierini, ubicada sobre la ruta 183, en el paraje de La Junta, el edificio actual estaba dividido en un grupo de m&oacute;dulos que hacen las veces de aulas, situaci&oacute;n que ven&iacute;a siendo un contratiempo para la comunidad educativa de establecimiento malarg&uuml;ino, sobre todo por falta de espacio y comodidades.<\/p>\n<p>Esto provoc&oacute; que la escuela, que tiene una orientaci&oacute;n netamente agropecuaria, perdiera mucha matr&iacute;cula en los &uacute;ltimos a&ntilde;os. Es por esta raz&oacute;n que en el nuevo proyecto se est&aacute; construyendo un edificio con caracter&iacute;sticas de albergue, lo que lo hace m&aacute;s costoso que otros en t&eacute;rminos econ&oacute;micos. La obra est&aacute; a cargo de la UTE Calzetta-Oralco.<\/p>\n<p>Por su parte, las instalaciones existentes de la Ventura Gallegos, ubicada sobre la ruta 92, en Colonia Las Rosas, se encontraban con un notorio desgaste provocado por el paso del tiempo, dado que tienen m&aacute;s de 70 a&ntilde;os. Y m&aacute;s all&aacute; de que ha sido intervenida con reparaciones menores, ya necesita una sustituci&oacute;n de edificio.<\/p>\n<p>Los trabajos, que tienen un plazo de ejecuci&oacute;n de 400 d&iacute;as corridos, est&aacute;n a cargo de la empresa constructora Acotur SA.<br>\nPor &uacute;ltimo, la Fuerza A&eacute;rea, enclavada en la calle San Mart&iacute;n al 6400, tambi&eacute;n presentaba en la actualidad un estado edilicio con inconvenientes estructurales, sobre todo por la antig&uuml;edad del edificio lasherino y las filtraciones ocasionadas por lluvias que hab&iacute;an da&ntilde;ado techos, muros y hasta instalaciones el&eacute;ctricas.<\/p>\n<p>El nuevo edificio se est&aacute; construyendo a trav&eacute;s de la UTE Iceo SA-Demonte Construcciones SRL, en el mismo predio donde estaba el viejo.<\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-167399'><div class='gallery-item' data-toggle='modal' data-target='#167401' id='r167401'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0073-150x150.jpg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"167401\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/estan-al-20-las-construcciones-de-las-escuelas-pierini-ventura-gallegos-y-fuerza-aerea\/img-20181221-wa0073\/'><img width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0073-700x525.jpg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0073-700x525.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0073-250x188.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0073-768x576.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0073-120x90.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0073.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#167402\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#167402' id='r167402'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0076-150x150.jpg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"167402\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#167401\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/estan-al-20-las-construcciones-de-las-escuelas-pierini-ventura-gallegos-y-fuerza-aerea\/img-20181221-wa0076\/'><img width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0076-700x525.jpg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0076-700x525.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0076-250x188.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0076-768x576.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0076-120x90.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/12\/IMG-20181221-WA0076.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#167401\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"En los tres establecimientos se est&aacute;n terminando de llenar fundaciones y han comenzado a levantar muros. Infraestructura tiene previsto que las obras concluyan a fines de 2019. Habr&aacute; una inversi&oacute;n total de m&aacute;s de $100 millones. Necesitaban una urgente sustituci&oacute;n de edificio. Las construcciones de las escuelas 4-191 Daniel Pierini (Malarg&uuml;e), 1-197 Dr. Ventura Gallegos&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/estan-al-20-las-construcciones-de-las-escuelas-pierini-ventura-gallegos-y-fuerza-aerea\/\"><\/a>","protected":false},"author":68,"featured_media":167401,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/167399"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=167399"}],"version-history":[{"count":4,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/167399\/revisions"}],"predecessor-version":[{"id":167553,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/167399\/revisions\/167553"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/167401"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=167399"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=167399"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=167399"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}