{"id":177327,"date":"2019-03-24T09:30:54","date_gmt":"2019-03-24T12:30:54","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=177327"},"modified":"2019-03-24T10:25:16","modified_gmt":"2019-03-24T13:25:16","slug":"continua-a-paso-firme-la-reparacion-del-techo-en-la-escuela-juan-jose-paso","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/continua-a-paso-firme-la-reparacion-del-techo-en-la-escuela-juan-jose-paso\/","title":{"rendered":"Contin\u00faa a paso firme la reparaci\u00f3n del techo en la Escuela Juan Jos\u00e9 Paso"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p><strong>La cubierta ten&iacute;a filtraciones en varios sectores del establecimiento de Luj&aacute;n de Cuyo. Adem&aacute;s, sigue en ejecuci&oacute;n el arreglo integral de la instalaci&oacute;n el&eacute;ctrica y la remodelaci&oacute;n de los sanitarios del jard&iacute;n de infantes. La obra tiene 90% de avance y una inversi&oacute;n de $3,3 millones.<\/strong><\/p>\n<p>La Subsecretar&iacute;a de Infraestructura Social B&aacute;sica contin&uacute;a con la reparaci&oacute;n integral de los techos en la Escuela 1-006 Juan Jos&eacute; Paso, de Luj&aacute;n de Cuyo. La obra se ejecuta con la modalidad de coeficiente de impacto individual y tiene un avance de 90%.<\/p>\n<p>Por estos d&iacute;as, la firma Terra SRL, encargada de los trabajos, est&aacute; ejecutando los detalles finales de la intervenci&oacute;n, que incluyen adem&aacute;s el recambio de toda la instalaci&oacute;n el&eacute;ctrica en los sectores que fueron afectados por las filtraciones, y la remodelaci&oacute;n de los ba&ntilde;os de jard&iacute;n de infantes.<\/p>\n<p>Las tareas en este emblem&aacute;tico edificio escolar terminar&aacute;n de demandar una inversi&oacute;n oficial de $3,3 millones. Est&aacute; previsto que sean concluidas a fines de abril o en los primeros d&iacute;as de mayo.<\/p>\n<p>&ldquo;Se trata de una escuela que ha sufrido el desgaste natural de los a&ntilde;os, y ya necesitaba reparaciones de manera urgente, sobre todo en techos y sanitarios. Tambi&eacute;n intervinimos el patio. En la actualidad estamos con un avance del 90% y nuestro objetivo es concluir los trabajos entre abril y mayo&rdquo;, se&ntilde;al&oacute; el subdirector de Mantenimiento y Reparaciones de Escuelas, Emilio Pastorino.<\/p>\n<p><strong>Otros $3 millones en la refuncionalizaci&oacute;n de los sanitarios y el patio<\/strong><\/p>\n<p>Estos trabajos se suman a los que ya concret&oacute; la empresa Vakfi SRL en 2018, que abarcaron la refuncionalizaci&oacute;n de los sanitarios de ni&ntilde;as y varones, y la reparaci&oacute;n del piso del enorme patio que posee el edificio escolar ubicado en la calle San Mart&iacute;n al 2400 de Mayor Drummond. Aqu&iacute; hubo una inversi&oacute;n de casi $3 millones.<\/p>\n<p>Estas refacciones hab&iacute;an sido solicitadas por la comunidad educativa del establecimiento lujanino, y por esta raz&oacute;n Infraestructura Social B&aacute;sica comenz&oacute; a concretarlas dado que ya necesitaban un arreglo de fondo.<\/p>\n<p>Galer&iacute;a:<\/p>\n<p><img loading=\"lazy\" width=\"250\" height=\"166\" class=\"alignnone size-medium wp-image-177330 img-responsive center-block\" src=\"https:\/\/www.mendoza.gov.ar\/prensa\/wp-content\/uploads\/sites\/5\/2019\/03\/ep2-250x166.jpg\" alt=\"\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep2-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep2-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep2-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep2-120x80.jpg 120w\" sizes=\"(max-width: 250px) 100vw, 250px\"><img loading=\"lazy\" width=\"250\" height=\"166\" class=\"alignnone size-medium wp-image-177328 img-responsive center-block\" src=\"https:\/\/www.mendoza.gov.ar\/prensa\/wp-content\/uploads\/sites\/5\/2019\/03\/ep-250x166.jpg\" alt=\"\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep-120x80.jpg 120w\" sizes=\"(max-width: 250px) 100vw, 250px\"><img loading=\"lazy\" width=\"250\" height=\"376\" class=\"alignnone size-medium wp-image-177329 img-responsive center-block\" src=\"https:\/\/www.mendoza.gov.ar\/prensa\/wp-content\/uploads\/sites\/5\/2019\/03\/ep1-250x376.jpg\" alt=\"\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep1-250x376.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep1-768x1156.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep1-700x1054.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/03\/ep1-120x181.jpg 120w\" sizes=\"(max-width: 250px) 100vw, 250px\"><\/p>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"La cubierta ten&iacute;a filtraciones en varios sectores del establecimiento de Luj&aacute;n de Cuyo. Adem&aacute;s, sigue en ejecuci&oacute;n el arreglo integral de la instalaci&oacute;n el&eacute;ctrica y la remodelaci&oacute;n de los sanitarios del jard&iacute;n de infantes. La obra tiene 90% de avance y una inversi&oacute;n de $3,3 millones. La Subsecretar&iacute;a de Infraestructura Social B&aacute;sica contin&uacute;a con la&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/continua-a-paso-firme-la-reparacion-del-techo-en-la-escuela-juan-jose-paso\/\"><\/a>","protected":false},"author":78,"featured_media":177328,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/177327"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/78"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=177327"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/177327\/revisions"}],"predecessor-version":[{"id":177333,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/177327\/revisions\/177333"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/177328"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=177327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=177327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=177327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}