{"id":179741,"date":"2019-04-12T10:30:54","date_gmt":"2019-04-12T13:30:54","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=179741"},"modified":"2019-04-12T11:07:38","modified_gmt":"2019-04-12T14:07:38","slug":"irrigacion-habilita-dos-obras-en-el-sur","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/irrigacion-habilita-dos-obras-en-el-sur\/","title":{"rendered":"Irrigaci\u00f3n habilita dos obras en el Sur"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Es este viernes. Se trata de la impermeabilizaci&oacute;n de cauces en Malarg&uuml;e, que&nbsp;beneficia al sector agr&iacute;cola y genera un ahorro significativo del agua. El monto total&nbsp;es de $5.800.000.<\/h5>\n<p>El Departamento General de Irrigaci&oacute;n prev&eacute; la puesta en servicio de una serie de&nbsp;obras en el Sur de la provincia que mejoran la conducci&oacute;n del agua, sobre todo en&nbsp;momentos en que la optimizaci&oacute;n de la distribuci&oacute;n y la gesti&oacute;n responsable de&nbsp;nuestros recursos es materia de discusi&oacute;n en toda Am&eacute;rica Latina y el mundo.<\/p>\n<p>La consolidaci&oacute;n de ideas como seguridad h&iacute;drica y una fuerte gobernanza del agua,&nbsp;que propone Irrigaci&oacute;n en momentos de escasez local y planetaria, prev&eacute; una visi&oacute;n&nbsp;anticipada a estos problemas. Esto, en consonancia con las acciones que se&nbsp;desarrollan ante el cambio clim&aacute;tico y ante una sucesi&oacute;n de crisis h&iacute;dricas que&nbsp;se producen en el mundo, donde los planes paliativos ya&nbsp;no producen el efecto&nbsp;esperado.<\/p>\n<p>A mediod&iacute;a de este viernes, se habilitar&aacute;n los trabajos en los cauces Rama Centro&nbsp;Unificado y Rama del Molino, en el departamento de Malarg&uuml;e, y despu&eacute;s de que&nbsp;sesione all&iacute; el Tribunal Administrativo que integran el superintendente general de Irrigaci&oacute;n, Sergio Marinelli, y los consejeros de Irrigaci&oacute;n, uno por cada&nbsp;cuenca. El titular de la Jefatura de la Zona de Riego Malarg&uuml;e, Jorge Fern&aacute;ndez, ser&aacute;&nbsp;el anfitri&oacute;n.<\/p>\n<p><strong>Las obras<\/strong><\/p>\n<p>La Rama Centro Unificada est&aacute; ubicada en Ciudad de Malarg&uuml;e y brindar&aacute; un&nbsp;beneficio directo a 1.442 hect&aacute;reas. El monto total de la inversi&oacute;n es de&nbsp;$ 2.272615,34.&nbsp;Irrigaci&oacute;n aporta $2.099.615,34, y $173.000, la Inspecci&oacute;n Ca&ntilde;ada Colorada.<\/p>\n<p>La obra consiste en el revestimiento de 1.433 metros de longitud con hormig&oacute;n&nbsp;armado. El objeto es disminuir p&eacute;rdidas por infiltraci&oacute;n e incrementar la&nbsp;eficiencia de distribuci&oacute;n, adem&aacute;s de evitar crecimiento de la vegetaci&oacute;n y&nbsp;desbordes.<\/p>\n<p>Fue concretada por la Inspecci&oacute;n de Cauce Canal Ca&ntilde;ada Colorada, con la asistencia&nbsp;t&eacute;cnica de un responsable designado por el Departamento General de Irrigaci&oacute;n a&nbsp;trav&eacute;s de la Jefatura de Zona de Riego Malarg&uuml;e.<\/p>\n<p>La Rama del Molino tambi&eacute;n se ubica en Ciudad de Malarg&uuml;e y la superficie que&nbsp;beneficia es de 532 hect&aacute;reas. El monto total de la inversi&oacute;n es de $2.956.187,99, de&nbsp;los cuales Irrigaci&oacute;n aport&oacute; $1.576.300, y la Inspecci&oacute;n, $1.379.887,99.<\/p>\n<p>La obra consisti&oacute; en la construcci&oacute;n de los siguientes elementos que integran el&nbsp;conjunto: obra de toma en Rama Centro Unificado y derivaci&oacute;n a Rama del&nbsp;Molino, partidor, compuertas y revestimiento de la nueva traza del canal Molino de&nbsp;1.220 metros. Adem&aacute;s de aportar los mismos beneficios que la anterior, tiene el agregado de evitar el paso por la zona urbana, lo que se traduce en una menor&nbsp;contaminaci&oacute;n y afectaci&oacute;n del recurso h&iacute;drico.<\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-179741'><div class='gallery-item' data-toggle='modal' data-target='#179742' id='r179742'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/04\/CU-5-150x150.jpg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"179742\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/irrigacion-habilita-dos-obras-en-el-sur\/cu-5\/'><img width=\"700\" height=\"499\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/04\/CU-5-700x499.jpg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/04\/CU-5-700x499.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/04\/CU-5-250x178.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/04\/CU-5-768x548.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/04\/CU-5-120x86.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/04\/CU-5.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#179742\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Es este viernes. Se trata de la impermeabilizaci&oacute;n de cauces en Malarg&uuml;e, que&nbsp;beneficia al sector agr&iacute;cola y genera un ahorro significativo del agua. El monto total&nbsp;es de $5.800.000. El Departamento General de Irrigaci&oacute;n prev&eacute; la puesta en servicio de una serie de&nbsp;obras en el Sur de la provincia que mejoran la conducci&oacute;n del agua, sobre&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/irrigacion-habilita-dos-obras-en-el-sur\/\"><\/a>","protected":false},"author":61,"featured_media":179742,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[26],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/179741"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=179741"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/179741\/revisions"}],"predecessor-version":[{"id":179747,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/179741\/revisions\/179747"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/179742"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=179741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=179741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=179741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}