{"id":216103,"date":"2020-01-04T07:46:49","date_gmt":"2020-01-04T10:46:49","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=216103"},"modified":"2020-01-03T17:54:22","modified_gmt":"2020-01-03T20:54:22","slug":"216103-2","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/216103-2\/","title":{"rendered":"El parque solar con mayor contenido local de la Argentina gener\u00f3 m\u00e1s energ\u00eda que la esperada"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5><\/h5>\n<h5>Durante noviembre, el PASIP super&oacute; los 300.000 kWh, que es lo mismo que evitar arrojar a la atm&oacute;sfera 118 toneladas de di&oacute;xido de carbono (CO2). El equivalente a la energ&iacute;a que consumen aproximadamente 800 hogares.<\/h5>\n<p>El PASIP es el parque solar m&aacute;s importante del Este provincial. El lugar cuenta con m&aacute;s de 4.000 paneles que generan 1,5 MW de potencia instalada que se inyectan al sistema interconectado el&eacute;ctrico. Inaugurado en septiembre pasado y con tan s&oacute;lo tres meses de operatividad muestra indicadores de mayor eficacia en comparaci&oacute;n con los an&aacute;lisis estad&iacute;sticos proyectados antes de su funcionamiento.<\/p>\n<p>Pablo Magistocchi, presidente de la Empresa Mendocina de Energ&iacute;a (EMESA) explic&oacute; que &ldquo;en el marco del programa RenovAr, cada proyecto se compromete a entregar una determinada cantidad de energ&iacute;a al Sistema Argentino de Interconexi&oacute;n (SADI), bajo cierta probabilidad de ocurrencia. Esto se fija en Reportes de Producci&oacute;n de Energ&iacute;a (RPE) fundados a su vez, en informaci&oacute;n meteorol&oacute;gica y programas de simulaci&oacute;n, que bajo la carga de determinadas variables (como localizaci&oacute;n, tecnolog&iacute;a a utilizar, ubicaci&oacute;n en plano, etc.), entrega una muy buena aproximaci&oacute;n de la energ&iacute;a que se generar&aacute;. En el mes de noviembre, la generaci&oacute;n neta del Parque Solar PASIP (esto es, la energ&iacute;a bruta generada disminuida en los consumos del parque), alcanz&oacute; m&aacute;s de 300.000 kWh y un ahorro aproximado de 118 tn de CO2 que evitamos liberar a la atm&oacute;sfera&rdquo;.<\/p>\n<p>&ldquo;En lo que respecta a diciembre y en funci&oacute;n de los datos obtenidos, la generaci&oacute;n del parque solar ha superado un 5% lo estimado, por lo que podemos decir que la tendencia se mantiene. Este incremento s&oacute;lo durante el mes de diciembre, ha permitido abastecer m&aacute;s casas de las previstas&rdquo;, finaliz&oacute; el funcionario.<\/p>\n<p>El parque solar de San Mart&iacute;n se emplaza en un terreno de 4 hect&aacute;reas aproximadamente, en Palmira. Las caracter&iacute;sticas propias del suelo, la radiaci&oacute;n recibida, la inexistencia de sombras provocadas por construcciones o vegetaci&oacute;n y la cercan&iacute;a con los polos industriales provinciales fueron los factores que hacen del terreno seleccionado un lugar propicio.<\/p>\n<p>Entre sus beneficios, el sistema tiene un costo de mantenimiento nulo, luego de la inversi&oacute;n inicial de US$ 2,5 millones financiados por la sociedad conformada entre Emesa y la Cooperativa El&eacute;ctrica de Godoy Cruz.<\/p>\n<p>Cuenta con 4.000 paneles solares y 62 trackers para seguir la orientaci&oacute;n del sol y optimizar la generaci&oacute;n de energ&iacute;a. El parque solar fotovoltaico PASIP tiene la particularidad de ser el parque solar con mayor cantidad de equipamiento provisto por empresas argentinas (89%) y es el &uacute;nico ubicado dentro de un parque industrial. Tiene un contrato de venta de energ&iacute;a por 20 a&ntilde;os.<\/p>\n<p>Para su construcci&oacute;n y puesta a punto trabajaron 14 empresas argentinas que suministraron equipamiento y otras 46 Pymes fueron contratadas para los servicios necesarios. Este parque solar es completamente telecomandado de manera remota, con conexi&oacute;n al Cerro Arco y al Centro de control de la Cooperativa El&eacute;ctrica de Godoy Cruz, empresa que ha participado desde el inicio junto a EMESA en el desarrollo del parque fotovoltaico.<\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-216103'><div class='gallery-item' data-toggle='modal' data-target='#216104' id='r216104'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/01\/Parque-Solar-Pasip-150x150.jpg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"216104\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/216103-2\/parque-energia-solar-7\/'><img width=\"700\" height=\"462\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/01\/Parque-Solar-Pasip-700x462.jpg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/01\/Parque-Solar-Pasip-700x462.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/01\/Parque-Solar-Pasip-250x165.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/01\/Parque-Solar-Pasip-768x507.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/01\/Parque-Solar-Pasip-120x79.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/01\/Parque-Solar-Pasip.jpg 1078w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#216104\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Durante noviembre, el PASIP super&oacute; los 300.000 kWh, que es lo mismo que evitar arrojar a la atm&oacute;sfera 118 toneladas de di&oacute;xido de carbono (CO2). El equivalente a la energ&iacute;a que consumen aproximadamente 800 hogares. El PASIP es el parque solar m&aacute;s importante del Este provincial. El lugar cuenta con m&aacute;s de 4.000 paneles que&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/216103-2\/\"><\/a>","protected":false},"author":68,"featured_media":216104,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/216103"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=216103"}],"version-history":[{"count":4,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/216103\/revisions"}],"predecessor-version":[{"id":216108,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/216103\/revisions\/216108"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/216104"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=216103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=216103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=216103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}