{"id":240159,"date":"2020-08-20T07:00:20","date_gmt":"2020-08-20T10:00:20","guid":{"rendered":"http:\/\/prensa.wp1.mendoza.gov.ar\/?p=240159"},"modified":"2020-08-20T09:06:12","modified_gmt":"2020-08-20T12:06:12","slug":"infraestructura-continua-con-la-revision-integral-de-gas-en-las-escuelas","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-revision-integral-de-gas-en-las-escuelas\/","title":{"rendered":"Infraestructura contin\u00faa la revisi\u00f3n integral de gas en las escuelas"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Se est&aacute;n interviniendo establecimientos de toda la provincia, por una exigencia del Enargas, para adecuarlos a la norma vigente. En una primera etapa se calcula completar 200 edificios. Est&aacute; previsto que el plan se extienda hasta 2023.<\/h5>\n<p>La Subsecretar&iacute;a de Infraestructura Escolar ya invirti&oacute; alrededor de $70 millones en la reparaci&oacute;n, mantenimiento y adecuaci&oacute;n de los sistemas de calefacci&oacute;n y artefactos de gas en escuelas de toda la provincia, con el objetivo de minimizar los eventuales inconvenientes que se puedan presentar en las instalaciones, sobre todo en los meses de m&aacute;s fr&iacute;o.<\/p>\n<p>Las obras se est&aacute;n haciendo a trav&eacute;s de licitaciones p&uacute;blicas, con la modalidad de coeficiente de impacto zonal. Abarcan el reacondicionamiento de artefactos como calefactores, cocinas y termotanques, cuadros de regulaci&oacute;n en gabinetes y las distintas ventilaciones en los edificios educativos.<\/p>\n<p>En una primera etapa (que se inici&oacute; en 2019 y contin&uacute;a este a&ntilde;o) ya se han arreglado y adecuado 176 establecimientos a la Norma 226 del Enargas, con el objetivo de alcanzar los 200 inmuebles escolares a fin de a&ntilde;o.<\/p>\n<p>&ldquo;En 2019 comenzamos a intervenir una primera etapa de escuelas, y esperamos llegar a las 200 a fin de este a&ntilde;o. Ya hemos invertido $70 millones aproximadamente. Est&aacute; previsto que el plan completo se termine en 2023 y contemple gran parte de los edificios escolares de toda la provincia&rdquo;, se&ntilde;al&oacute; el director de Mantenimiento y Reparaciones de Escuelas, Bernardino Rodr&iacute;guez.<\/p>\n<p><strong>Intervenci&oacute;n de calderas<\/strong><\/p>\n<p>Dentro de los trabajos contemplados se encuentra la reparaci&oacute;n de calderas, a trav&eacute;s de la modalidad de coeficiente de impacto zonal. De esta manera, estar&aacute;n cubiertos los posibles inconvenientes que puedan ocurrir en estos artefactos, sobre todo en las zonas Sur, Este y Valle de Uco.<\/p>\n<p>Por otra parte, en la medida que las escuelas lo necesiten, desde el &aacute;rea de calefacci&oacute;n de Infraestructura Escolar se hacen reparaciones y recambio de artefactos de gas, a trav&eacute;s de la intervenci&oacute;n de las cuadrillas de t&eacute;cnicos especializados. Adem&aacute;s, se hacen refacciones de todo tipo de instalaciones de ca&ntilde;er&iacute;as de gas que presenten alg&uacute;n inconveniente.<\/p>\n<p>Asimismo, se abordan los arreglos en las escuelas, como el recambio de una perilla de encendido de calefactores o el remplazo de los artefactos de gas que lo requieran, entre otros.<\/p>\n<p>Para cualquier consulta y reclamo por parte de los directivos de los establecimientos, est&aacute;n disponibles los tel&eacute;fonos 4137539 y 4288696, y por internet al siguiente correo electr&oacute;nico: <a href=\"mailto:alejanpaez@yahoo.com.ar\">alejanpaez@yahoo.com.ar<\/a>.<\/p>\n\n        <style type='text\/css'>\n            #gallery-1 {\n                margin: auto;\n            }\n            #gallery-1 .gallery-item {\n                float: left;\n                margin-top: 10px;\n\n                width: auto;}\n            #gallery-1 img {\n                border: 0px none;\n            }\n            #gallery-1 .gallery-caption {\n                margin-left: 0;\n            }\n        <\/style>\n<script>\njQuery(document).ready(function($) {\n  jQuery('div.gallery-item').hover(function(){\n     \/\/jQuery(this).fadeIn().siblings(':not(.modal)').fadeTo( 'slow' , 0.2);\n     jQuery(this).siblings(':not(.modal)').fadeTo( 'fast' , 0.2);\n     jQuery(this).fadeTo( 'slow' , 1);\n  },function(){\n     \/\/$(this).siblings().andSelf().fadeTo( 'slow' , 1);\n  });\n  jQuery('#gallery-1').on('mouseleave',function(){\n    jQuery('div.gallery-item').fadeTo( 'fast' , 1);\n  })\n});\n<\/script>\n        <!-- see gallery_shortcode() in wp-includes\/media.php -->\n        <h3>GALERIA<\/h3>\n        <div id='gallery-1' class='gallery galleryid-240159'><div class='gallery-item' data-toggle='modal' data-target='#240161' id='r240161'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-150x150.jpg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"240161\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a href='https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-revision-integral-de-gas-en-las-escuelas\/escuela-antonio-zinny-1-2\/'><img width=\"700\" height=\"237\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-700x237.jpg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-700x237.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-250x85.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-768x260.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-120x41.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-1536x521.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Antonio-Zinny-1-1-e1630501891912-2048x694.jpg 2048w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#240162\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div><div class='gallery-item' data-toggle='modal' data-target='#240162' id='r240162'>\n            <dt class='gallery-icon'>\n                <a style='cursor:pointer;'><img width='150' height='150' src='https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Julio-Mayorga-1-1-150x150.jpg' class='attachment-thumbnail size-thumbnail' alt='' href=''><\/a>\n             <\/dt><\/div><div class=\"modal fade bs-example-modal-lg\" id=\"240162\" tabindex=\"-1\" role=\"dialog\" aria-labelledby=\"myModalLabel\">\n  <div class=\"modal-dialog modal-lg\" role=\"document\">\n    <div class=\"\">\n      <div class=\"modal-body\" style=\"text-align: center;\"><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#240161\"><i class=\"text-white fa fa-chevron-left fa-4x\"><\/i><\/a><a href='https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-revision-integral-de-gas-en-las-escuelas\/escuela-julio-mayorga-1-2\/'><img width=\"700\" height=\"465\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Julio-Mayorga-1-1-700x465.jpg\" class=\"attachment-large size-large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Julio-Mayorga-1-1-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Julio-Mayorga-1-1-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Julio-Mayorga-1-1-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/08\/Escuela-Julio-Mayorga-1-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><a data-toggle=\"modal\" data-dismiss=\"modal\" data-target=\"#240161\"><i class=\"text-white fa fa-chevron-right fa-4x\"><\/i><\/a><\/div>\n    <\/div>\n  <\/div>\n<\/div>\n            <br style='clear: both;' \/>\n        <\/div>\n\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se est&aacute;n interviniendo establecimientos de toda la provincia, por una exigencia del Enargas, para adecuarlos a la norma vigente. En una primera etapa se calcula completar 200 edificios. Est&aacute; previsto que el plan se extienda hasta 2023. La Subsecretar&iacute;a de Infraestructura Escolar ya invirti&oacute; alrededor de $70 millones en la reparaci&oacute;n, mantenimiento y adecuaci&oacute;n de&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-continua-con-la-revision-integral-de-gas-en-las-escuelas\/\"><\/a>","protected":false},"author":68,"featured_media":240161,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/240159"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=240159"}],"version-history":[{"count":4,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/240159\/revisions"}],"predecessor-version":[{"id":240180,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/240159\/revisions\/240180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/240161"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=240159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=240159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=240159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}