{"id":255650,"date":"2021-01-06T12:43:28","date_gmt":"2021-01-06T15:43:28","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=255650"},"modified":"2021-01-06T12:43:29","modified_gmt":"2021-01-06T15:43:29","slug":"infraestructura-ya-invirtio-casi-50-millones-en-la-escuela-humberto-tolosa","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-ya-invirtio-casi-50-millones-en-la-escuela-humberto-tolosa\/","title":{"rendered":"Infraestructura ya invirti\u00f3 casi $50 millones en la escuela Humberto Tolosa"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Fue en los &uacute;ltimos cuatro a&ntilde;os. Se han realizado importantes refuerzos<br>estructurales, adem&aacute;s de reparaciones en la cubierta de techo y en todos los grupos sanitarios que posee el establecimiento. Por estos d&iacute;as, contin&uacute;an los arreglos de desag&uuml;es pluviales y membrana impermeabilizante, entre otros.<\/h5>\n\n\n\n<p>En los &uacute;ltimos cuatro a&ntilde;os, el Gobierno de Mendoza lleva invertidos casi $50 millones en la reparaci&oacute;n integral de la escuela 9-006 Francisco Humberto Tolosa, de Rivadavia, debido a que el edificio padec&iacute;a de asentamientos en el terreno y otros da&ntilde;os estructurales.<\/p>\n\n\n\n<p>Los trabajos, que se iniciaron en 2017, han incluido desde un minucioso estudio de suelo (estuvo a cargo de especialistas de la Facultad de Ingenier&iacute;a de la UTN) y refuerzos estructurales en fundaciones, muros, vigas y columnas del cuerpo central hasta importantes refacciones en varios sectores de la cubierta de techo, en todos los grupos sanitarios y en las calderas que posee el inmueble.<\/p>\n\n\n\n<p>De hecho, desde noviembre de 2020 hasta la actualidad, sigue en marcha la<br>tercera etapa de intervenciones, que tiene una inversi&oacute;n de $25 millones. La empresa encargada de los trabajos, Construcciones Industriales, Comerciales y Civiles SA, est&aacute; abocada por estos d&iacute;as, a la continuidad de la reparaci&oacute;n de la cubierta de techo y los ba&ntilde;os.<\/p>\n\n\n\n<p>Estas tareas incluyen el reemplazo completo de membrana impermeabilizante y de desag&uuml;es pluviales, la demolici&oacute;n de dos cisternas de hormig&oacute;n (que fueron reemplazadas por dos tanques de 2.800 litros), la colocaci&oacute;n de nuevos colectores y ca&ntilde;er&iacute;as de agua y la remodelaci&oacute;n de los grupos sanitarios, con separadores de boxes, puertas, piso y revestimiento cer&aacute;mico.<\/p>\n\n\n\n<p><strong>Trabajos anteriores<\/strong><\/p>\n\n\n\n<p>En tanto, estas intervenciones se suman a las que ya se hicieron en las dos<br>primeras etapas, que fueron los refuerzos estructurales de muros, vigas y<br>columnas del cuerpo central de la escuela y abarcaron una superficie de 2.500 metros cuadrados, que incluyeron ocho aulas, galer&iacute;as y el sector administrativo, entre otros espacios.<\/p>\n\n\n\n<p>La obra tuvo una inversi&oacute;n de $13 millones. Se instalaron &ldquo;mallas&rdquo; de hierro en muros, columnas y vigas del interior y exterior. Adem&aacute;s, se hicieron los refuerzos en las fundaciones, tareas que le proporcionaron mayor seguridad a la estructura.<\/p>\n\n\n\n<p>Por su parte, se fabricaron espacios con tabiquer&iacute;a de placas de yeso que fueron destinados, de manera provisoria, al sector administrativo, sala de profesores y biblioteca del establecimiento educativo rivadaviense.<\/p>\n\n\n\n<p>A esto se le suma una inversi&oacute;n de otros $10 millones que se hizo entre 2017 y 2018, con lo que se arregl&oacute; una parte de la cubierta de techo, el funcionamiento de las calderas y se efectu&oacute; un estudio de suelo que detect&oacute; los asentamientos del terreno, acci&oacute;n que estuvo a cargo de especialistas de la Facultad de Ingenier&iacute;a de la UTN.<\/p>\n\n\n\n<p><strong>En febrero continuar&aacute;n los refuerzos estructurales<\/strong><\/p>\n\n\n\n<p>Una vez finalizadas las reparaciones en la cubierta de techo y de los grupos<br>sanitarios, Infraestructura Escolar tiene previsto continuar, desde febrero pr&oacute;ximo, con la ejecuci&oacute;n de los refuerzos estructurales tanto en el cuerpo central como en las alas del edificio de la Francisco Tolosa, con el objetivo de que la estructura de escuela, el populoso Normal de Rivadavia, pueda tener una vida &uacute;til de al menos, otros 50 a&ntilde;os.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-3-700x442.jpg\"><img loading=\"lazy\" width=\"700\" height=\"442\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-3-700x442.jpg\" alt=\"\" data-id=\"255652\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=255652\" class=\"wp-image-255652 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-3-700x442.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-3-250x158.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-3-768x485.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-3-120x76.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-3.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-2-700x525.jpg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-2-700x525.jpg\" alt=\"\" data-id=\"255653\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=255653\" class=\"wp-image-255653 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-2-700x525.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-2-250x188.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-2-768x576.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-2-120x90.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-2.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"613\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1-700x613.jpg\" alt=\"\" data-id=\"255654\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=255654\" class=\"wp-image-255654 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1-700x613.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1-250x219.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1-768x672.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1-120x105.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/01\/Seleccion-1.jpg 960w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Fue en los &uacute;ltimos cuatro a&ntilde;os. Se han realizado importantes refuerzosestructurales, adem&aacute;s de reparaciones en la cubierta de techo y en todos los grupos sanitarios que posee el establecimiento. Por estos d&iacute;as, contin&uacute;an los arreglos de desag&uuml;es pluviales y membrana impermeabilizante, entre otros. En los &uacute;ltimos cuatro a&ntilde;os, el Gobierno de Mendoza lleva invertidos casi&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-ya-invirtio-casi-50-millones-en-la-escuela-humberto-tolosa\/\"><\/a>","protected":false},"author":61,"featured_media":255654,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/255650"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=255650"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/255650\/revisions"}],"predecessor-version":[{"id":255655,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/255650\/revisions\/255655"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/255654"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=255650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=255650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=255650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}