{"id":268873,"date":"2021-05-05T09:26:27","date_gmt":"2021-05-05T12:26:27","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=268873"},"modified":"2021-05-05T11:11:04","modified_gmt":"2021-05-05T14:11:04","slug":"construiran-los-porticos-del-nuevo-puente-de-avenida-el-libertador-en-san-rafael","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/construiran-los-porticos-del-nuevo-puente-de-avenida-el-libertador-en-san-rafael\/","title":{"rendered":"Construir\u00e1n los p\u00f3rticos del nuevo puente de avenida El Libertador en San Rafael"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Vialidad Provincial licit&oacute; la realizaci&oacute;n de la estructura que regular&aacute; la altura de los veh&iacute;culos de carga pesada. Dos empresas presentaron ofertas.<\/h5>\n\n\n\n<p>A partir de un presupuesto oficial de $999.000, la Direcci&oacute;n Provincial de Vialidad licit&oacute; la construcci&oacute;n de los p&oacute;rticos reguladores de altura correspondientes al puente ubicado sobre avenida El Libertador y las calles Juan XXIII y Federico Cantoni, en San Rafael.<\/p>\n\n\n\n<p>La ejecuci&oacute;n del puente se inici&oacute; a mediados de 2018, en el l&iacute;mite urbano sur de la ciudad, donde transcurre el canal marginal del r&iacute;o Diamante, a partir de la necesidad de conectar las avenidas V&eacute;lez Sarsfield y El Libertador dentro de un &aacute;rea que nuclea un importante caudal vehicular.<\/p>\n\n\n\n<p>La obra se completar&aacute; con la construcci&oacute;n de los p&oacute;rticos que fueron licitados en la sede central del organismo vial. Se presentaron dos empresas interesadas en los trabajos: Obras Andinas SA hizo una propuesta econ&oacute;mica de $1.174.880, mientras que la firma Metalcarp SA ofert&oacute; $900.180,84.<\/p>\n\n\n\n<p>Los p&oacute;rticos establecer&aacute;n la altura m&aacute;xima permitida para los veh&iacute;culos que utilicen el puente (3,80 metros), teniendo en cuenta la presencia de una l&iacute;nea de alta tensi&oacute;n en el lugar.<\/p>\n\n\n\n<p>La obra tiene plazo de ejecuci&oacute;n de 60 d&iacute;as.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"412\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1-700x412.jpg\" alt=\"\" data-id=\"268874\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=268874\" class=\"wp-image-268874 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1-700x412.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1-250x147.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1-768x452.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1-120x71.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.1.jpg 1400w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2.jpg\"><img loading=\"lazy\" width=\"700\" height=\"420\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2-700x420.jpg\" alt=\"\" data-id=\"268875\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=268875\" class=\"wp-image-268875 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2-700x420.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2-250x150.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2-768x461.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2-120x72.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Licitacion-porticos.2.jpg 1400w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Vialidad Provincial licit&oacute; la realizaci&oacute;n de la estructura que regular&aacute; la altura de los veh&iacute;culos de carga pesada. Dos empresas presentaron ofertas. A partir de un presupuesto oficial de $999.000, la Direcci&oacute;n Provincial de Vialidad licit&oacute; la construcci&oacute;n de los p&oacute;rticos reguladores de altura correspondientes al puente ubicado sobre avenida El Libertador y las calles&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/construiran-los-porticos-del-nuevo-puente-de-avenida-el-libertador-en-san-rafael\/\"><\/a>","protected":false},"author":66,"featured_media":268875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/268873"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=268873"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/268873\/revisions"}],"predecessor-version":[{"id":268917,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/268873\/revisions\/268917"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/268875"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=268873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=268873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=268873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}