{"id":270578,"date":"2021-05-19T07:00:00","date_gmt":"2021-05-19T10:00:00","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=270578"},"modified":"2021-05-18T19:31:24","modified_gmt":"2021-05-18T22:31:24","slug":"comenzaron-los-trabajos-de-desembanque-del-rio-blanco-en-potrerillos","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/comenzaron-los-trabajos-de-desembanque-del-rio-blanco-en-potrerillos\/","title":{"rendered":"Comenzaron los trabajos de desembanque del r\u00edo Blanco en Potrerillos"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>El personal de Hidr&aacute;ulica trabaja en un tramo de 500 metros desde el puente de la Ruta Provincial 89 hasta aguas arriba. Tambi&eacute;n se est&aacute; reforzando la margen izquierda del r&iacute;o, para mantener la capacidad hidr&aacute;ulica del cauce y prevenir desbordes durante un aluvi&oacute;n.<\/h5>\n\n\n\n<p>Hace pocas semanas, la Direcci&oacute;n de Hidr&aacute;ulica dej&oacute; en condiciones el arroyo Las Mulas en Potrerillos. Ahora sigue trabajando en esa localidad de Luj&aacute;n de Cuyo y avanza con el desembanque y el refuerzo de la margen izquierda del r&iacute;o Blanco.<\/p>\n\n\n\n<p>El tramo que se interviene tiene 500 metros y va desde el puente de la Ruta Provincial 89 hasta aguas arriba. En esta primera etapa, las tareas se efect&uacute;an con una topadora y una cargadora frontal sobre neum&aacute;ticos.<\/p>\n\n\n\n<p>&ldquo;Ante los importantes eventos de crecidas ocurridos, es necesario hacer estos trabajos preventivos con el objetivo de mantener la capacidad hidr&aacute;ulica del cauce y de esta manera brindar seguridad a los vecinos de la zona&rdquo;, puntualiz&oacute; el ingeniero Pablo Rodr&iacute;guez, responsable del &aacute;rea t&eacute;cnica de Hidr&aacute;ulica. Adem&aacute;s, record&oacute; que no se puede hacer &ldquo;ning&uacute;n tipo de intervenci&oacute;n que obstaculice el escurrimiento de caudales por el r&iacute;o&rdquo;.<\/p>\n\n\n\n<p>Cualquier persona que tenga dudas, consultas o reclamos debe ingresar <a href=\"https:\/\/www.mendoza.gov.ar\/infraestructura\/direccion-de-hidraulica\/\">aqu&iacute;<\/a>. Otros medios de comunicaci&oacute;n son a trav&eacute;s de un correo electr&oacute;nico (<a href=\"mailto:hidraulica@mendoza.gov.ar\">hidraulica@mendoza.gov.ar<\/a>) o llamando a los siguientes n&uacute;meros telef&oacute;nicos: 4492611 y 4492864.<\/p>\n\n\n\n<p>El objetivo de los trabajos de la Direcci&oacute;n de Hidr&aacute;ulica es que los colectores est&eacute;n operativos&nbsp;para conducir los caudales proyectados en el per&iacute;odo de alerta aluvional.<\/p>\n\n\n\n<p>El beneficio directo es la protecci&oacute;n de las personas y sus bienes -infraestructura p&uacute;blica y privada- ante un evento de crecida aluvional en la zona.<\/p>\n\n\n\n<p>Este cuidado es fundamental para el buen funcionamiento de canales de riego, colectores aluvionales y acequias para riego del arbolado p&uacute;blico.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-2.jpg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-2-700x394.jpg\" alt=\"\" data-id=\"270581\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-2.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=270581\" class=\"wp-image-270581 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1-700x394.jpg\" alt=\"\" data-id=\"270582\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=270582\" class=\"wp-image-270582 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1-700x394.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1-768x432.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1-120x68.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-1.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3.jpg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3-700x394.jpg\" alt=\"\" data-id=\"270583\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=270583\" class=\"wp-image-270583 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3-700x394.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3-768x432.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3-120x68.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/05\/Rio-Blanco-3.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"El personal de Hidr&aacute;ulica trabaja en un tramo de 500 metros desde el puente de la Ruta Provincial 89 hasta aguas arriba. Tambi&eacute;n se est&aacute; reforzando la margen izquierda del r&iacute;o, para mantener la capacidad hidr&aacute;ulica del cauce y prevenir desbordes durante un aluvi&oacute;n. Hace pocas semanas, la Direcci&oacute;n de Hidr&aacute;ulica dej&oacute; en condiciones el&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/comenzaron-los-trabajos-de-desembanque-del-rio-blanco-en-potrerillos\/\"><\/a>","protected":false},"author":68,"featured_media":270581,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/270578"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=270578"}],"version-history":[{"count":5,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/270578\/revisions"}],"predecessor-version":[{"id":270595,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/270578\/revisions\/270595"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/270581"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=270578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=270578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=270578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}