{"id":274387,"date":"2021-06-21T07:38:00","date_gmt":"2021-06-21T10:38:00","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=274387"},"modified":"2021-06-21T13:09:58","modified_gmt":"2021-06-21T16:09:58","slug":"el-nuevo-edificio-del-hospital-gailhac-sera-el-primero-en-construirse-con-metodologia-bim","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/el-nuevo-edificio-del-hospital-gailhac-sera-el-primero-en-construirse-con-metodologia-bim\/","title":{"rendered":"El nuevo edificio del hospital Gailhac ser\u00e1 el primero en construirse con metodolog\u00eda BIM"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Se incorporar&aacute;n los conceptos de un hospital moderno, horizontal y evolutivo que sea capaz de adaptarse a los cambios funcionales y tecnol&oacute;gicos. En el segundo semestre se licitar&aacute; la primera etapa donde se construir&aacute;n consultorios externos, guardia, diagn&oacute;stico, administraci&oacute;n y servicios generales.<\/h5>\n\n\n\n<p>El Ministerio de Planificaci&oacute;n e Infraestructura P&uacute;blica avanza con el proyecto para la construcci&oacute;n del nuevo edificio del hospital H&eacute;ctor Gailhac en Las Heras. La semana pasada, funcionarios de la cartera se reunieron con autoridades de salud y directivos del hospital para validar las distintas etapas de dise&ntilde;o de la obra que est&aacute; pr&oacute;xima a licitarse.<\/p>\n\n\n\n<p>Si bien ya se han licitado proyectos con protocolos BIM, como Portezuelo de Viento, Hospital Humberto Notti en abril pasado, este proyecto ser&aacute; el primero que est&aacute; enteramente modelado desde el Ministerio de Planificaci&oacute;n e Infraestructura P&uacute;blica, planificando la obra en costos y plazos tal y como lo indican las dimensiones 4 y 5D t&iacute;picas de BIM (<em>Building Information Modelling<\/em>).<\/p>\n\n\n\n<p>En la reuni&oacute;n se hizo una simulaci&oacute;n de la construcci&oacute;n y visualizaci&oacute;n del proyecto con el objetivo de &ldquo;construir antes de construir&rdquo; para trabajar en la mejora de indicadores de alcance, tiempo y costos, entre otros.<\/p>\n\n\n\n<p>Como premisa principal se intenta incorporar conceptos del siglo XXI, es decir, un hospital horizontal y evolutivo que sea capaz de adaptarse a los cambios funcionales y tecnol&oacute;gicos. As&iacute; como dar respuesta al concepto de sostenibilidad y ahorro energ&eacute;tico.<\/p>\n\n\n\n<p><strong>El nuevo edificio<\/strong><\/p>\n\n\n\n<p>Se construir&aacute; en el mismo predio donde se encuentra el Gailhac, trasladando su acceso principal a la calle Salvador Civit. De este modo se podr&aacute; terminar una primera etapa donde se construir&aacute;n consultorios externos, guardia, diagn&oacute;stico, administraci&oacute;n y &aacute;rea de servicios generales, sin afectar las prestaciones de salud a la comunidad en ning&uacute;n momento.<\/p>\n\n\n\n<p>Una vez terminada esta obra, se demoler&aacute; el sector donde se encuentran actualmente los consultorios externos y otros servicios. En ese sector, con acceso desde calle Arist&oacute;bulo de Valle, se construir&aacute; un nuevo estacionamiento para personal, casilla de control de acceso y terminal de cajero autom&aacute;tico.<\/p>\n\n\n\n<p>Luego en una segunda etapa, se har&aacute; una nueva licitaci&oacute;n para construir el &aacute;rea de internaci&oacute;n, que reemplazar&aacute; los pabellones actuales.<\/p>\n\n\n\n<p><strong>Reparaciones en la estructura actual<\/strong><\/p>\n\n\n\n<p>Hace unos meses comenz&oacute; una serie de trabajos en la estructura actual que incluyen limpieza, demoliciones, desmontajes, revoques, enlucidos, impermeabilizaci&oacute;n de cubiertas de techos, reclavado de chapas, babetas, cielorrasos, pintura, colocaci&oacute;n de policarbonatos, vidrios, carpinter&iacute;as, artefactos e instalaciones de electricidad, sanitarios, gas y seguridad, entre otras.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-4\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6.jpg\"><img loading=\"lazy\" width=\"700\" height=\"568\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6-700x568.jpg\" alt=\"\" data-id=\"274388\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=274388\" class=\"wp-image-274388 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6-700x568.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6-250x203.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6-768x623.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6-120x97.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-6.jpg 924w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7.jpg\"><img loading=\"lazy\" width=\"700\" height=\"340\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7-700x340.jpg\" alt=\"\" data-id=\"274389\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=274389\" class=\"wp-image-274389 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7-700x340.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7-250x121.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7-768x373.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7-120x58.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-7.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-5.jpg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-5-700x340.jpg\" alt=\"\" data-id=\"274391\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-5.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=274391\" class=\"wp-image-274391 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"340\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1-700x340.jpg\" alt=\"\" data-id=\"274392\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=274392\" class=\"wp-image-274392 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1-700x340.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1-250x121.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1-768x373.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1-120x58.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-1.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3.jpg\"><img loading=\"lazy\" width=\"700\" height=\"481\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3-700x481.jpg\" alt=\"\" data-id=\"274390\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=274390\" class=\"wp-image-274390 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3-700x481.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3-250x172.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3-768x528.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3-120x82.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/06\/Gailhac-con-metodologia-BIM-3.jpg 965w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se incorporar&aacute;n los conceptos de un hospital moderno, horizontal y evolutivo que sea capaz de adaptarse a los cambios funcionales y tecnol&oacute;gicos. En el segundo semestre se licitar&aacute; la primera etapa donde se construir&aacute;n consultorios externos, guardia, diagn&oacute;stico, administraci&oacute;n y servicios generales. El Ministerio de Planificaci&oacute;n e Infraestructura P&uacute;blica avanza con el proyecto para la&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/el-nuevo-edificio-del-hospital-gailhac-sera-el-primero-en-construirse-con-metodologia-bim\/\"><\/a>","protected":false},"author":68,"featured_media":274391,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/274387"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=274387"}],"version-history":[{"count":1,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/274387\/revisions"}],"predecessor-version":[{"id":274393,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/274387\/revisions\/274393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/274391"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=274387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=274387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=274387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}