{"id":279075,"date":"2021-08-02T12:24:16","date_gmt":"2021-08-02T15:24:16","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=279075"},"modified":"2021-08-02T12:49:07","modified_gmt":"2021-08-02T15:49:07","slug":"vialidad-provincial-amplia-la-recomposicion-de-arterias-en-la-zona-este","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-provincial-amplia-la-recomposicion-de-arterias-en-la-zona-este\/","title":{"rendered":"Vialidad Provincial ampl\u00eda la recomposici\u00f3n de calles en la zona Este"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>El plan comprende rutas y caminos que sirven a la producci&oacute;n regional y a la comunicaci&oacute;n entre los distritos. Nueva se&ntilde;alizaci&oacute;n e incorporaci&oacute;n de material microaglomerado conforman las nuevas intervenciones.<\/h5>\n\n\n\n<p>&ldquo;Son obras enfocadas a la reconstrucci&oacute;n de pavimentos degradados que se complementan con nueva demarcaci&oacute;n en sectores eminentemente productivos&rdquo;, indic&oacute; Osvaldo Romagnoli, titular del ente vial.<\/p>\n\n\n\n<p>Por su parte, Jorge Garc&iacute;a Zalazar, consejero de la entidad, sostuvo que &ldquo;el plan de obras es amplio y est&aacute; basado en un concepto de recuperaci&oacute;n de todos los caminos del Este de Mendoza. Son intervenciones que representan un notable beneficio para los vecinos, algunas de las cuales est&aacute;n en ejecuci&oacute;n y otras se extender&aacute;n hasta diciembre pr&oacute;ximo&rdquo;.<\/p>\n\n\n\n<p><strong>San Mart&iacute;n<\/strong><\/p>\n\n\n\n<p>El cronograma de reconstrucci&oacute;n de carpeta asf&aacute;ltica comprende:<\/p>\n\n\n\n<p>&ndash; Calle Cereceto, en el tramo que se extiende desde el carril Chimbas hasta el carril Montecaseros.<\/p>\n\n\n\n<p>&ndash; Carril Zapata -actualmente en ejecuci&oacute;n-, en el tramo comprendido entre el carril Montecaseros y el carril Villarruel.<\/p>\n\n\n\n<p>&ndash; Carril Chimbas, desde la Ruta Nacional 7 hasta la Ruta Provincial 50.<\/p>\n\n\n\n<p>&ndash; Calles Nanclares y Sullivan, desde el carril Chimbas hasta calle Grane.<\/p>\n\n\n\n<p>En tanto, los trabajos de demarcaci&oacute;n comprenden:<\/p>\n\n\n\n<p>&ndash; Carril Montecaseros -en ejecuci&oacute;n-, desde el carril Zapata hasta la Ruta Provincial 50.<\/p>\n\n\n\n<p>&ndash; Carril Norte, desde el carril Costa Canal Montecaseros hasta el carril Buen Orden.<\/p>\n\n\n\n<p>&ndash; Carril Buen Orden, desde la Ruta Provincial 50 hasta el carril Norte.<\/p>\n\n\n\n<p>Por su parte, el carril Los Charabones, desde el carril Zapata hasta Colonia Montecaseros, ser&aacute; repavimentado mediante la incorporaci&oacute;n de material microaglomerado.<\/p>\n\n\n\n<p><strong>Rivadavia<\/strong><\/p>\n\n\n\n<p>La reconstrucci&oacute;n de carpeta asf&aacute;ltica y nueva se&ntilde;alizaci&oacute;n comprende:<\/p>\n\n\n\n<p>&ndash; Calle Galigniana, desde calle Uni&oacute;n hasta calle Florida (recientemente finalizada).<\/p>\n\n\n\n<p>&ndash; Carril Colombo, desde calle El Dique hasta la Ruta Provincial 71.<\/p>\n\n\n\n<p>&ndash; Ciclov&iacute;a que comunica los barrios Almafuerte y La Florida, en los distritos Los Campamentos, La Libertad y La Reducci&oacute;n.<\/p>\n\n\n\n<p>En tanto el carril Caballero (Ruta Provincial 63), desde la Ruta Provincial 60 hasta la Ruta Provincial 65, ser&aacute; reconstruido mediante material microaglomerado.<\/p>\n\n\n\n<p>A su vez, se realizar&aacute; la demarcaci&oacute;n de la Ruta Provincial 62, desde la Ruta Provincial 71 hasta el dique Benegas, y de la calle Brandsen, desde la Ruta Provincial 62 hasta calle Almirante Brown.<\/p>\n\n\n\n<p><strong>Jun&iacute;n<\/strong><\/p>\n\n\n\n<p>La reconstrucci&oacute;n de carpeta asf&aacute;ltica comprende:<\/p>\n\n\n\n<p>&ndash; Calle Corval&aacute;n, en el tramo comprendido entre las rutas provinciales 50 y 60.<\/p>\n\n\n\n<p>&ndash; Calle Arias, en el tramo Ruta Provincial 60 a calle Belgrano.<\/p>\n\n\n\n<p>&ndash; Calle Cura, en el tramo Ruta Provincial 60 a calle Mitchell.<\/p>\n\n\n\n<p>&ndash; Calle Paso de los Andes, desde la Ruta Provincial 60 al sur.<\/p>\n\n\n\n<p>&ndash; Carril Centro, en el tramo comprendido entre las calles La Posta y Estrella.<\/p>\n\n\n\n<p>Con microaglomerado ser&aacute;n repavimentados el carril Albard&oacute;n, en el tramo Ruta Provincial 65 a Ruta Provincial 62, y la Ruta Provincial 60, desde la calle Isidoro Bousquet hasta el carril Los Barriales.<\/p>\n\n\n\n<p><strong>GALER&Iacute;A<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-1-700x468.jpg\" alt=\"\" data-id=\"279076\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279076\" class=\"wp-image-279076 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-1-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-1-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-1-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-1.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"485\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-2-700x485.jpg\" alt=\"\" data-id=\"279077\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-2.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279077\" class=\"wp-image-279077 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-2-700x485.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-2-250x173.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-2-768x532.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-2-120x83.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-2.jpg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-3-700x468.jpg\" alt=\"\" data-id=\"279078\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-3.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279078\" class=\"wp-image-279078 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-3-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-3-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-3-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-3-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-3.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-4-700x468.jpg\" alt=\"\" data-id=\"279079\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-4.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279079\" class=\"wp-image-279079 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-4-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-4-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-4-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-4-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-4.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"505\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-5-700x505.jpg\" alt=\"\" data-id=\"279080\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-5.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279080\" class=\"wp-image-279080 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-5-700x505.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-5-250x180.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-5-768x554.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-5-120x87.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-5.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-6-700x468.jpg\" alt=\"\" data-id=\"279081\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-6.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279081\" class=\"wp-image-279081 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-6-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-6-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-6-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-6-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-6.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-7-700x468.jpg\" alt=\"\" data-id=\"279082\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-7.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279082\" class=\"wp-image-279082 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-7-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-7-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-7-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-7-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-7.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"483\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-8-700x483.jpg\" alt=\"\" data-id=\"279083\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-8.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=279083\" class=\"wp-image-279083 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-8-700x483.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-8-250x173.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-8-768x530.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-8-120x83.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Vialidad-en-la-zona-Este-8.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"El plan comprende rutas y caminos que sirven a la producci&oacute;n regional y a la comunicaci&oacute;n entre los distritos. Nueva se&ntilde;alizaci&oacute;n e incorporaci&oacute;n de material microaglomerado conforman las nuevas intervenciones. &ldquo;Son obras enfocadas a la reconstrucci&oacute;n de pavimentos degradados que se complementan con nueva demarcaci&oacute;n en sectores eminentemente productivos&rdquo;, indic&oacute; Osvaldo Romagnoli, titular del ente&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-provincial-amplia-la-recomposicion-de-arterias-en-la-zona-este\/\"><\/a>","protected":false},"author":62,"featured_media":279078,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/279075"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=279075"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/279075\/revisions"}],"predecessor-version":[{"id":279089,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/279075\/revisions\/279089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/279078"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=279075"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=279075"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=279075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}