{"id":282312,"date":"2021-08-29T10:51:49","date_gmt":"2021-08-29T13:51:49","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=282312"},"modified":"2021-08-30T08:53:48","modified_gmt":"2021-08-30T11:53:48","slug":"nuevas-obras-viales-para-la-zona-este-de-mendoza","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/nuevas-obras-viales-para-la-zona-este-de-mendoza\/","title":{"rendered":"Nuevas obras viales para la zona Este de Mendoza"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Vialidad Provincial contin&uacute;a con el desarrollo de trabajos dise&ntilde;ados para optimizar el tr&aacute;nsito y ofrecer mayor seguridad a los usuarios de los sectores m&aacute;s transitados.<\/h5>\n\n\n\n<p>&ldquo;Hemos consolidado un gran equipo de trabajo y esto nos permite seguir concretando obras que son vitales para el sector productivo y para la comunicaci&oacute;n entre los distintos distritos y departamentos de la zona Este. Estamos sumando ciclov&iacute;as, nuevos pavimentos y nueva se&ntilde;alizaci&oacute;n en &aacute;reas que concentran un gran caudal vehicular&rdquo;, indic&oacute; Osvaldo Romagnoli, administrador de la Direcci&oacute;n Provincial de Vialidad.<\/p>\n\n\n\n<p>En los departamentos que conforman la zona Este de Mendoza son m&aacute;s de 3.200 kil&oacute;metros de rutas y caminos, estructura integrada en su mayor porcentaje por ejes principalmente rurales y agroindustriales, lo que planea completar el organismo vial.<\/p>\n\n\n\n<p>En ese contexto, se est&aacute; ejecutando la repavimentaci&oacute;n de un tramo de 5 kil&oacute;metros de carril Cereceto, en el distrito Alto Salvador, en el segmento comprendido entre el carril Chimbas y el carril Costa Canal Montecaseros.<\/p>\n\n\n\n<p>En la misma zona, la entidad est&aacute; iniciando los trabajos de reconstrucci&oacute;n del carril Chimbas Sur, en una extensi&oacute;n de 3 kil&oacute;metros, desde la Ruta Nacional 7 hasta la Ruta Provincial 50.<\/p>\n\n\n\n<p>En simult&aacute;neo, contin&uacute;an las tareas de demarcaci&oacute;n del carril Zapata, en el tramo que se extiende desde el carril Chimbas hasta el carril Los Charabones. La misma labor est&aacute; concentrada en el carril Montecaseros, en el tramo comprendido entre el carril Zapata y la Ruta Provincial 50.<\/p>\n\n\n\n<p>Se trata de un circuito de calles amplio que sirve a un &aacute;rea fundamentalmente productiva del departamento San Mart&iacute;n, donde se ubican fincas y bodegas tradicionales, establecimientos industriales, barrios, escuelas, centros de salud y sitios de esparcimiento.<\/p>\n\n\n\n<p>&ldquo;Contamos con una agenda intensa elaborada a partir de las necesidades que presenta la red vial que tenemos a cargo. Estamos preparando en estos d&iacute;as la log&iacute;stica y el desarrollo de la repavimentaci&oacute;n del carril Centro y de calle Coria, en Jun&iacute;n, que incluye la ciclov&iacute;a del lugar. En el primer caso, la obra se extender&aacute; desde calle La Posta hasta La Estrella&rdquo;, subray&oacute; Jorge Garc&iacute;a Zalazar, representante de la entidad en los departamentos del Este.<\/p>\n\n\n\n<p>Al mismo tiempo, Vialidad est&aacute; construyendo, en conjunto con la Municipalidad de Rivadavia, una ciclov&iacute;a de 25 kil&oacute;metros en el lateral norte de la Ruta Provincial 62, uno de los ejes m&aacute;s transitados del departamento.<\/p>\n\n\n\n<p>La obra comunicar&aacute; los barrios Almafuerte y La Florida y aportar&aacute; mayor seguridad a los usuarios de los distritos Los Campamentos, La Libertad y La Reducci&oacute;n, entre otros.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-2-700x477.jpg\"><img loading=\"lazy\" width=\"700\" height=\"477\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-2-700x477.jpg\" alt=\"\" data-id=\"282314\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=282314\" class=\"wp-image-282314 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-2-700x477.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-2-250x171.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-2-768x524.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-2-120x82.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-2.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-5-700x468.jpg\"><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-5-700x468.jpg\" alt=\"\" data-id=\"282315\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=282315\" class=\"wp-image-282315 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-5-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-5-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-5-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-5-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-5.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-4-700x462.jpg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-4-700x462.jpg\" alt=\"\" data-id=\"282316\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=282316\" class=\"wp-image-282316 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-3-700x468.jpg\"><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-3-700x468.jpg\" alt=\"\" data-id=\"282317\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=282317\" class=\"wp-image-282317 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-3-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-3-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-3-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-3-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-3.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-1-700x468.jpg\"><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-1-700x468.jpg\" alt=\"\" data-id=\"282318\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=282318\" class=\"wp-image-282318 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-1-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-1-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-1-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-1.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6.jpg\"><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6-700x468.jpg\" alt=\"\" data-id=\"282319\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=282319\" class=\"wp-image-282319 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6-700x468.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6-768x514.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/08\/Caminos-zona-Este-6.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Vialidad Provincial contin&uacute;a con el desarrollo de trabajos dise&ntilde;ados para optimizar el tr&aacute;nsito y ofrecer mayor seguridad a los usuarios de los sectores m&aacute;s transitados. &ldquo;Hemos consolidado un gran equipo de trabajo y esto nos permite seguir concretando obras que son vitales para el sector productivo y para la comunicaci&oacute;n entre los distintos distritos y&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/nuevas-obras-viales-para-la-zona-este-de-mendoza\/\"><\/a>","protected":false},"author":63,"featured_media":282316,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[2668,1998,2677],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/282312"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=282312"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/282312\/revisions"}],"predecessor-version":[{"id":282367,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/282312\/revisions\/282367"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/282316"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=282312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=282312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=282312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}