{"id":294077,"date":"2021-11-24T07:00:04","date_gmt":"2021-11-24T10:00:04","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=294077"},"modified":"2021-11-24T09:03:44","modified_gmt":"2021-11-24T12:03:44","slug":"nuevo-pavimento-para-el-ingreso-al-carril-rodriguez-pena","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/nuevo-pavimento-para-el-ingreso-al-carril-rodriguez-pena\/","title":{"rendered":"Nuevo pavimento para el ingreso al carril Rodr\u00edguez Pe\u00f1a"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>La obra comprender&aacute; el tramo que se extiende desde la calle Diamante hasta el inicio de la avenida Costanera.<\/h5>\n\n\n\n<p>Eje vertebral del polo industrial m&aacute;s importante de Mendoza, el carril Nicol&aacute;s Rodr&iacute;guez Pe&ntilde;a nuclea, en sus 9 kil&oacute;metros de extensi&oacute;n, un caudal vehicular en constante crecimiento.<\/p>\n\n\n\n<p>Ese volumen, compuesto por transportes de carga pesada y usuarios de la ciudad Capital, Godoy Cruz, Maip&uacute; y Guaymall&eacute;n, presenta sectores donde la circulaci&oacute;n se torna m&aacute;s compleja, como ocurre en la intersecci&oacute;n con la calle Diamante.<\/p>\n\n\n\n<p>&ldquo;Estamos coordinando junto a la sede local de Vialidad Nacional la obra para reconstruir el pavimento en el sector que une la avenida Costanera con el ingreso oeste al carril Rodr&iacute;guez Pe&ntilde;a&rdquo;, indicaron desde la gerencia operativa de la Direcci&oacute;n Provincial de Vialidad.<\/p>\n\n\n\n<p>El trabajo, previsto para diciembre, comprender&aacute; el fresado del pavimento actual, es decir la eliminaci&oacute;n de ondulaciones y grietas, para luego establecer una estructura asf&aacute;ltica renovada.<\/p>\n\n\n\n<p>La intervenci&oacute;n se desarrollar&aacute; con el aporte conjunto de ambas entidades: el organismo nacional destinar&aacute; el pavimento y el ente provincial, los equipos y el personal necesarios.<\/p>\n\n\n\n<p>Una vez definido el nuevo pavimento, se realizar&aacute; la demarcaci&oacute;n correspondiente.<\/p>\n\n\n\n<p>A partir de la obra, se est&aacute; analizando la reconstrucci&oacute;n de los rulos que conforman los enlaces del Acceso Sur con el carril Rodr&iacute;guez Pe&ntilde;a, donde tambi&eacute;n existen &aacute;reas con distinto grado de deterioro.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720-700x467.jpg\" alt=\"\" data-id=\"294078\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=294078\" class=\"wp-image-294078 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720-2048x1365.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1720-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710-700x467.jpg\" alt=\"\" data-id=\"294079\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=294079\" class=\"wp-image-294079 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710-2048x1365.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1710-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1694.jpg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1694-700x467.jpg\" alt=\"\" data-id=\"294080\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/11\/1MAR_1694.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=294080\" class=\"wp-image-294080 img-responsive center-block\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"La obra comprender&aacute; el tramo que se extiende desde la calle Diamante hasta el inicio de la avenida Costanera. Eje vertebral del polo industrial m&aacute;s importante de Mendoza, el carril Nicol&aacute;s Rodr&iacute;guez Pe&ntilde;a nuclea, en sus 9 kil&oacute;metros de extensi&oacute;n, un caudal vehicular en constante crecimiento. Ese volumen, compuesto por transportes de carga pesada y&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/nuevo-pavimento-para-el-ingreso-al-carril-rodriguez-pena\/\"><\/a>","protected":false},"author":68,"featured_media":294080,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,2711],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/294077"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=294077"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/294077\/revisions"}],"predecessor-version":[{"id":294085,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/294077\/revisions\/294085"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/294080"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=294077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=294077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=294077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}