{"id":296117,"date":"2021-12-10T09:25:11","date_gmt":"2021-12-10T12:25:11","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=296117"},"modified":"2021-12-10T10:41:21","modified_gmt":"2021-12-10T13:41:21","slug":"esta-habilitado-el-camino-de-ingreso-al-monumento-al-cristo-redentor","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/esta-habilitado-el-camino-de-ingreso-al-monumento-al-cristo-redentor\/","title":{"rendered":"Est\u00e1 habilitado el camino de ingreso al monumento al Cristo Redentor"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5><strong>Vialidad Provincial concluy&oacute; los trabajos de despeje y rectificaci&oacute;n de la traza que asciende hasta los 3.850 m s. n. m.<\/strong><\/h5>\n\n\n\n<p>Es uno de los atractivos tur&iacute;sticos m&aacute;s convocantes de la Alta Monta&ntilde;a mendocina que el pr&oacute;ximo 13 de marzo cumplir&aacute; 118 a&ntilde;os desde que fue inaugurado en conmemoraci&oacute;n a la paz alcanzada por Argentina y Chile luego de un conflicto lim&iacute;trofe surgido a fines del siglo XIX.<\/p>\n\n\n\n<p>El monumento al Cristo Redentor tiene una historia sumamente interesante que se extiende desde su concepci&oacute;n hasta su emplazamiento, a escasos metros del l&iacute;mite internacional, dentro del Paso de Uspallata, elegido por una parte de las tropas sanmartinianas para cruzar y liberar a Chile en 1817.<\/p>\n\n\n\n<p>El camino de acceso es de suelo natural y est&aacute; conformado por una docena de curvas distribuidas en poco m&aacute;s de ocho kil&oacute;metros. Es un recorrido sinuoso que demanda conducir con precauci&oacute;n y que ofrece vistas panor&aacute;micas espectaculares de la cordillera de los Andes.<\/p>\n\n\n\n<p>Como ocurre cada a&ntilde;o con el inicio de la temporada estival, los equipos de la Direcci&oacute;n Provincial de Vialidad deben desarrollar un conjunto de intervenciones para habilitar la traza, es decir, quebrar y retirar los grandes bloques de nieve que se producen en invierno, ampliar las curvas, y perfilar todo el camino, entre otras.<\/p>\n\n\n\n<p>&ldquo;Este a&ntilde;o los trabajos de despeje de nieve y recomposici&oacute;n del camino se extendieron tres semanas. Es una labor que requiere de toda la experiencia de nuestros maquinistas, porque deben operar sus motoniveladoras entre los 3.600 y los 3.850 metros de altura sobre el nivel del mar&rdquo;,<em> <\/em>indic&oacute; Osvaldo Romagnoli, titular del ente vial.<\/p>\n\n\n\n<p>Turistas argentinos y de distintas partes del mundo llegan principalmente en verano hasta la localidad de Las Cuevas, ubicada a 210 km de la ciudad capital, para visitar el lugar. El ascenso se puede realizar en veh&iacute;culos en buen estado y en aquellos que cuentan con doble tracci&oacute;n. Es necesario tener en cuenta que, a mayor altura, las temperaturas bajan considerablemente y el viento suele ser muy fr&iacute;o, con lo cual se recomienda contar con informaci&oacute;n adecuada antes de realizar la experiencia.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.37-700x469.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"469\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.37-700x469.jpeg\" alt=\"\" data-id=\"296118\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=296118\" class=\"wp-image-296118 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.37-700x469.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.37-250x168.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.37-768x515.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.37-120x80.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.37.jpeg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"468\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38-700x468.jpeg\" alt=\"\" data-id=\"296119\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=296119\" class=\"wp-image-296119 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38-700x468.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38-250x167.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38-768x514.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38-120x80.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2021\/12\/WhatsApp-Image-2021-12-10-at-09.21.38.jpeg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n\n\n\n<p><\/p>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Vialidad Provincial concluy&oacute; los trabajos de despeje y rectificaci&oacute;n de la traza que asciende hasta los 3.850 m s. n. m. Es uno de los atractivos tur&iacute;sticos m&aacute;s convocantes de la Alta Monta&ntilde;a mendocina que el pr&oacute;ximo 13 de marzo cumplir&aacute; 118 a&ntilde;os desde que fue inaugurado en conmemoraci&oacute;n a la paz alcanzada por Argentina&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/esta-habilitado-el-camino-de-ingreso-al-monumento-al-cristo-redentor\/\"><\/a>","protected":false},"author":66,"featured_media":296118,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,2711],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/296117"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=296117"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/296117\/revisions"}],"predecessor-version":[{"id":296122,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/296117\/revisions\/296122"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/296118"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=296117"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=296117"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=296117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}