{"id":298882,"date":"2022-01-04T11:49:22","date_gmt":"2022-01-04T14:49:22","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=298882"},"modified":"2022-01-04T15:50:53","modified_gmt":"2022-01-04T18:50:53","slug":"hidraulica-adjudico-dos-obras-importantes-en-san-rafael-y-godoy-cruz-por-un-valor-de-90-millones","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/hidraulica-adjudico-dos-obras-importantes-en-san-rafael-y-godoy-cruz-por-un-valor-de-90-millones\/","title":{"rendered":"Hidr\u00e1ulica adjudic\u00f3 dos obras importantes en San Rafael y Godoy Cruz por $90 millones"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Se trata de la restauraci&oacute;n hidrol&oacute;gica de torrentes en cuencas y la<br>contrataci&oacute;n de equipos para desembanque y encauzamiento del cauce<br>aluvional La Hedionda, en el Sur provincial.<\/h5>\n\n\n\n<p>La Direcci&oacute;n de Hidr&aacute;ulica adjudic&oacute; dos obras que permitir&aacute;n mejorar el<br>sistema de defensa aluvional de la provincia. Tambi&eacute;n, incorporar&aacute; la<br>maquinaria necesaria para llevar adelante esos trabajos. En total, se invertir&aacute;n m&aacute;s de $90 millones.<\/p>\n\n\n\n<p>En primer lugar, se adjudic&oacute; a la empresa Obras Andinas SA la contrataci&oacute;n<br>de equipos para desembanque y encauzamiento del cauce aluvional La<br>Hedionda, en el distrito de Cuadro Nacional, San Rafael.<\/p>\n\n\n\n<p>Estos trabajos corresponden al plan de acci&oacute;n vinculado a la emergencia<br>h&iacute;drica y aluvional decretada oportunamente para toda la provincia.<\/p>\n\n\n\n<p>Espec&iacute;ficamente, se trata de una nueva etapa en los trabajos a realizar en el<br>cauce La Hedionda, atendiendo su din&aacute;mica y el comportamiento que present&oacute; en la pasada temporada estival 2020\/2021.<\/p>\n\n\n\n<p>Los importantes aportes pluviales que se producen en las cuencas de los<br>arroyos El Chancho y La Hedionda, que confluyen en un cauce &uacute;nico en el<br>distrito El Cerrito, provocan como respuesta escurrimientos de caudales de<br>gran magnitud (de hasta 300 m3\/s) y los consecuentes desbordes en varias<br>zonal del paraje Colonia Espa&ntilde;ola.<\/p>\n\n\n\n<p>Asimismo, se advirtieron erosiones en ambas m&aacute;rgenes, principalmente la<br>sur, y se inundaron parte del oasis productivos del lugar y de los<br>terrenos circundantes, lo que afect&oacute; cultivos, la red de riego, las viviendas, los corrales y la red vial. Por esta raz&oacute;n, fue necesario tomar medidas de correcci&oacute;n para que estos inconvenientes se minimicen. <\/p>\n\n\n\n<p>El programa de acciones preventivas consiste en la ejecuci&oacute;n de terraplenes de defensa en sectores particulares, el desembanque del tramo inferior del cauce hasta la zona del ferrocarril y la canalizaci&oacute;n del curso de agua a zonas bajas de Colonia Espa&ntilde;ola.<\/p>\n\n\n\n<p>Con estos trabajos se incrementar&aacute; la capacidad de conducci&oacute;n del cauce y se completar&aacute; la protecci&oacute;n de m&aacute;rgenes, y mejorar&aacute; as&iacute; su comportamiento ante grandes caudales como los mencionados.<\/p>\n\n\n\n<p>Para la ejecuci&oacute;n de las tareas se utilizar&aacute; una excavadora, una topadora y una pala cargadora. Asimismo, se dispondr&aacute;n veh&iacute;culos de apoyo necesarios para realizar los trabajos, como carret&oacute;n de traslado, bateas de  carga de material y camiones y camionetas doble tracci&oacute;n, entre otros.<\/p>\n\n\n\n<p><strong>Otra obra trascendental<\/strong><\/p>\n\n\n\n<p>La empresa Apolo Sur SA ser&aacute; la encargada de la restauraci&oacute;n hidrol&oacute;gica de torrentes de cuencas en Godoy Cruz. Estas est&aacute;n situadas al oeste de los<br>barrios Los Cerrillos, 4 de Julio y Nuevo Razquin, entre las cuencas Fr&iacute;as y<br>Maure, en la cerrillada Mogotes.<\/p>\n\n\n\n<p>El principal objetivo es disminuir el efecto erosivo de la escorrent&iacute;a en el cauce y los riesgos por crecidas aluvionales sobre los barrios mencionados. El plazo de ejecuci&oacute;n de estos trabajos es de 120 d&iacute;as, a partir del inicio de obra.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto1.jpg\" alt=\"\" data-id=\"298884\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=298884\" class=\"wp-image-298884 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto1.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto1-250x188.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto1-120x90.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-3.jpg\"><img loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-3.jpg\" alt=\"\" data-id=\"298885\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=298885\" class=\"wp-image-298885 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-3.jpg 150w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-3-120x120.jpg 120w\" sizes=\"(max-width: 150px) 100vw, 150px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2.jpg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2-700x394.jpg\" alt=\"\" data-id=\"298886\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=298886\" class=\"wp-image-298886 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2-700x394.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2-768x432.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2-120x68.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/01\/foto-2.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se trata de la restauraci&oacute;n hidrol&oacute;gica de torrentes en cuencas y lacontrataci&oacute;n de equipos para desembanque y encauzamiento del caucealuvional La Hedionda, en el Sur provincial. La Direcci&oacute;n de Hidr&aacute;ulica adjudic&oacute; dos obras que permitir&aacute;n mejorar elsistema de defensa aluvional de la provincia. Tambi&eacute;n, incorporar&aacute; lamaquinaria necesaria para llevar adelante esos trabajos. En total, se&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/hidraulica-adjudico-dos-obras-importantes-en-san-rafael-y-godoy-cruz-por-un-valor-de-90-millones\/\"><\/a>","protected":false},"author":61,"featured_media":298886,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/298882"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=298882"}],"version-history":[{"count":4,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/298882\/revisions"}],"predecessor-version":[{"id":298892,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/298882\/revisions\/298892"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/298886"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=298882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=298882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=298882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}