{"id":304953,"date":"2022-03-08T10:58:01","date_gmt":"2022-03-08T13:58:01","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=304953"},"modified":"2022-03-08T10:58:02","modified_gmt":"2022-03-08T13:58:02","slug":"infraestructura-comenzo-la-construccion-del-jardin-0-000-a-crear-en-el-barrio-nueva-argentina","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-comenzo-la-construccion-del-jardin-0-000-a-crear-en-el-barrio-nueva-argentina\/","title":{"rendered":"Infraestructura comenz\u00f3 la construcci\u00f3n del jard\u00edn 0-000 A Crear, en el barrio Nueva Argentina"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5><strong>Se trata de un inmueble de 460 metros cuadrados, con tres salas de nivel inicial totalmente equipadas. Est&aacute; previsto que la obra, a cargo de la firma Wynne Industrial SRL, se utilice desde el inicio del ciclo lectivo 2023. Se har&aacute; con el m&eacute;todo &ldquo;steel framing&rdquo;. Habr&aacute; una inversi&oacute;n de $105 millones.<\/strong><\/h5>\n\n\n\n<p>La Subsecretar&iacute;a de Obras P&uacute;blicas puso en marcha la construcci&oacute;n del jard&iacute;n de infantes 0-000 A Crear, de San Mart&iacute;n, con el firme objetivo de que la comunidad educativa pueda comenzar a utilizarlo desde el inicio del ciclo lectivo 2023.<\/p>\n\n\n\n<p>Una vez concluida, la obra habr&aacute; demandado una inversi&oacute;n total de $105 millones y ser&aacute; financiada con fondos &iacute;ntegramente provinciales. Se est&aacute; haciendo en un terreno bald&iacute;o ubicado en la esquina de L&oacute;pez y Planes y Bartolom&eacute; Mitre, del barrio Nueva Argentina, en el radio c&eacute;ntrico del departamento del este provincial.<\/p>\n\n\n\n<p>Por estos d&iacute;as, la firma Wynne Industrial SRL, a cargo de las tareas, est&aacute; realizando los movimientos de suelo y limpieza del predio donde se levantar&aacute; el edificio de nivel inicial. Tambi&eacute;n ha comenzado con la construcci&oacute;n del cierre perimetral y la instalaci&oacute;n del obrador.<\/p>\n\n\n\n<p>Los trabajos beneficiar&aacute;n la escolaridad de m&aacute;s de 200 alumnos. La intervenci&oacute;n abarca la construcci&oacute;n de 460 metros cuadrados, que incluyen tres salas de nivel inicial, cada una con sus respectivos grupos sanitarios y patios de juegos y de formaci&oacute;n, SUM, cocina, y &aacute;rea administrativa y de gobierno.<\/p>\n\n\n\n<p>El proyecto de este jard&iacute;n fue dise&ntilde;ado con galer&iacute;as cerradas, que sirven de espacios recreativos para los alumnos, adem&aacute;s de los patios.<\/p>\n\n\n\n<p><strong>Con muros de estructura liviana y aislaci&oacute;n termoac&uacute;stica<\/strong><\/p>\n\n\n\n<p>El inmueble de nivel inicial contar&aacute; con muros de estructura liviana, sismo resistentes, con aislaci&oacute;n termoac&uacute;stica, con una base de hormig&oacute;n, carpinter&iacute;a en puertas y ventanas, y conexiones cloacales, de energ&iacute;a el&eacute;ctrica y agua, entre otras prestaciones. La cubierta de techo del establecimiento tambi&eacute;n est&aacute; compuesta por materiales livianos, con chapa de zinc enmalletada y aislantes.<\/p>\n\n\n\n<p>En la construcci&oacute;n del jard&iacute;n se utilizar&aacute; el m&eacute;todo &ldquo;Steel framing&rdquo;, que ofrece una mayor rapidez en la ejecuci&oacute;n respecto del sistema tradicional, pero con la misma garant&iacute;a de seguridad.<\/p>\n\n\n\n<p><strong>M&aacute;s edificios para salas de 4 que incrementan la oferta<\/strong><\/p>\n\n\n\n<p>Desde el ciclo lectivo 2021, y sobre todo desde el actual, la provincia cuenta con otros cinco nuevos jardines de infantes que le proporcionan una mayor oferta educativa al sistema educativo para los ni&ntilde;os de sala de 4 a&ntilde;os.<\/p>\n\n\n\n<p>Se trata de 22 salas de nivel inicial que incrementaron el universo de jardines que Mendoza posee en la actualidad. En este sentido, son cinco departamentos (y sus zonas aleda&ntilde;as y de influencia) que resultaron beneficiados con los trabajos y ya pueden contar con estos flamantes espacios para el aprendizaje.<\/p>\n\n\n\n<p>Los cinco edificios fueron terminados y entregados a la Direcci&oacute;n General de Escuelas para su uso por parte de sus respectivas comunidades educativas.<\/p>\n\n\n\n<p>Las estructuras de los edificios tambi&eacute;n est&aacute;n hechas con el m&eacute;todo constructivo &ldquo;steel framing&rdquo;, que ayud&oacute; a agilizar los tiempos de ejecuci&oacute;n respecto del sistema tradicional, por lo que fue mucho m&aacute;s r&aacute;pido el avance de las obras. Sin embargo, cuentan con el mismo nivel de seguridad edilicia, dado que se trata de estructuras livianas pero sismorresistentes.<\/p>\n\n\n\n<p>Las intervenciones en estos edificios educativos demandaron una inversi&oacute;n total que supera los $120 millones, que fueron financiados &iacute;ntegramente con fondos nacionales. Con estas construcciones, se han beneficiado casi 500 alumnos de nivel inicial en los departamentos involucrados y sus alrededores.<\/p>\n\n\n\n<p>Los establecimientos de nivel inicial que ya fueron terminados y entregados son el 0-000 Sin Nombre, de Maip&uacute;, el 0-164 Sin Nombre, de Lavalle; el 0-057 Sin Nombre, de San Mart&iacute;n; y el 0-107 Roberto L&oacute;pez Leyton, de Rivadavia. Mientras que tambi&eacute;n el 0-173 Sin Nombre, de Jun&iacute;n, est&aacute; siendo utilizado por docentes y alumnos desde el inicio del ciclo lectivo 2021.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0051-700x465.jpg\"><img loading=\"lazy\" width=\"700\" height=\"465\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0051-700x465.jpg\" alt=\"\" data-id=\"304955\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=304955\" class=\"wp-image-304955 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0051-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0051-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0051-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0051-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0051.jpg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0053-700x465.jpg\"><img loading=\"lazy\" width=\"700\" height=\"465\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0053-700x465.jpg\" alt=\"\" data-id=\"304956\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=304956\" class=\"wp-image-304956 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0053-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0053-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0053-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0053-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0053.jpg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0052-700x465.jpg\"><img loading=\"lazy\" width=\"700\" height=\"465\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0052-700x465.jpg\" alt=\"\" data-id=\"304957\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=304957\" class=\"wp-image-304957 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0052-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0052-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0052-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0052-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0052.jpg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0049-700x465.jpg\"><img loading=\"lazy\" width=\"700\" height=\"465\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0049-700x465.jpg\" alt=\"\" data-id=\"304958\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=304958\" class=\"wp-image-304958 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0049-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0049-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0049-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0049-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0049.jpg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050.jpg\"><img loading=\"lazy\" width=\"700\" height=\"465\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050-700x465.jpg\" alt=\"\" data-id=\"304959\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=304959\" class=\"wp-image-304959 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050-700x465.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050-250x166.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050-768x510.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/DSC_0050.jpg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n\n\n\n<figure class=\"wp-block-gallery columns-0 is-cropped\"><ul class=\"blocks-gallery-grid\"><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se trata de un inmueble de 460 metros cuadrados, con tres salas de nivel inicial totalmente equipadas. Est&aacute; previsto que la obra, a cargo de la firma Wynne Industrial SRL, se utilice desde el inicio del ciclo lectivo 2023. Se har&aacute; con el m&eacute;todo &ldquo;steel framing&rdquo;. Habr&aacute; una inversi&oacute;n de $105 millones. La Subsecretar&iacute;a de&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-comenzo-la-construccion-del-jardin-0-000-a-crear-en-el-barrio-nueva-argentina\/\"><\/a>","protected":false},"author":66,"featured_media":304956,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/304953"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=304953"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/304953\/revisions"}],"predecessor-version":[{"id":304960,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/304953\/revisions\/304960"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/304956"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=304953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=304953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=304953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}