{"id":305988,"date":"2022-03-17T15:02:30","date_gmt":"2022-03-17T18:02:30","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=305988"},"modified":"2022-03-17T16:48:37","modified_gmt":"2022-03-17T19:48:37","slug":"mendoza-continua-licitando-la-construccion-de-viviendas-sociales","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/mendoza-continua-licitando-la-construccion-de-viviendas-sociales\/","title":{"rendered":"Mendoza contin\u00faa licitando la construcci\u00f3n de viviendas sociales"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>E<strong>l IPV realiz&oacute; un nuevo llamado para la construcci&oacute;n m&aacute;s de 100 viviendas en Maip&uacute; y Guaymall&eacute;n<\/strong>. La inversi&oacute;n aproximada superar&aacute; los <strong>$688 millones<\/strong>.<\/h5>\n\n\n\n<p>El Instituto Provincial de la Vivienda (IPV) realiz&oacute; un nuevo llamado para la construcci&oacute;n m&aacute;s de 100 viviendas en Maip&uacute; y Guaymall&eacute;n. Se trata de la cuarta convocatoria para construir barrios desde el comienzo de 2022. Ya son siete los proyectos licitados bajo el Plan Mendoza Construye L&iacute;nea 1, totalizando 318 viviendas distribuidas en cinco departamentos de la provincia. <\/p>\n\n\n\n<p>Hace unos d&iacute;as, el IPV dio a conocer el &uacute;ltimo de estos llamados, destinado a la construcci&oacute;n los barrios La Merced III, de 22 viviendas en Maip&uacute;, y Bonfanti, de 84 unidades habitacionales en Guaymall&eacute;n.<\/p>\n\n\n\n<p>Estas obras se suman a las ya licitadas en enero y febrero y que se encuentran en proceso de evaluaci&oacute;n para su posterior adjudicaci&oacute;n.<\/p>\n\n\n\n<p>Los proyectos licitados este a&ntilde;o son: B&ordm; Villa Olivos I (87 viviendas) de Guaymall&eacute;n, B&ordm;2 de Abril (35 viviendas) de San Rafael, B&ordm; 4 de Julio (22 viviendas) de Godoy Cruz y, B&ordm; Posta de Medrano (23 viviendas) y B&ordm; SOEM (45 viviendas), ambos ubicados en el departamento de Rivadavia. <\/p>\n\n\n\n<p>Todas estas obras se ejecutar&aacute;n con financiamiento enteramente provincial y est&aacute; previsto que su ejecuci&oacute;n se extienda entre 8 y 14 meses. <\/p>\n\n\n\n<p>La consulta y adquisici&oacute;n de pliegos de dichas licitaciones puede realizarse a trav&eacute;s de <a href=\"http:\/\/www.ipvmendoza.gov.ar\">www.ipvmendoza.gov.ar<\/a> o en el portal de la Direcci&oacute;n de Contrataciones de la Provincia.<\/p>\n\n\n\n<p>La recepci&oacute;n de ofertas y apertura de sobres est&aacute; prevista para el 30 de marzo.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-1\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL.jpg\"><img loading=\"lazy\" width=\"700\" height=\"236\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL-700x236.jpg\" alt=\"\" data-id=\"305989\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=305989\" class=\"wp-image-305989 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL-700x236.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL-250x84.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL-768x259.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL-1536x518.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL-2048x690.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/03\/MENDOZA-CONSTRUYE_Lic_Pub_5x2_14_Marzo_EL-SOL-120x40.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"El IPV realiz&oacute; un nuevo llamado para la construcci&oacute;n m&aacute;s de 100 viviendas en Maip&uacute; y Guaymall&eacute;n. La inversi&oacute;n aproximada superar&aacute; los $688 millones. El Instituto Provincial de la Vivienda (IPV) realiz&oacute; un nuevo llamado para la construcci&oacute;n m&aacute;s de 100 viviendas en Maip&uacute; y Guaymall&eacute;n. Se trata de la cuarta convocatoria para construir barrios&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/mendoza-continua-licitando-la-construccion-de-viviendas-sociales\/\"><\/a>","protected":false},"author":63,"featured_media":305989,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,25],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/305988"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=305988"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/305988\/revisions"}],"predecessor-version":[{"id":306002,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/305988\/revisions\/306002"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/305989"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=305988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=305988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=305988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}