{"id":319076,"date":"2022-07-07T14:43:43","date_gmt":"2022-07-07T17:43:43","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=319076"},"modified":"2022-07-07T16:35:15","modified_gmt":"2022-07-07T19:35:15","slug":"obras-publicas-construira-la-nueva-escuela-4-209-blanca-nelida-gutierrez-de-san-martin","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/obras-publicas-construira-la-nueva-escuela-4-209-blanca-nelida-gutierrez-de-san-martin\/","title":{"rendered":"Obras P\u00fablicas construir\u00e1 la nueva Escuela 4-209 Blanca N\u00e9lida Guti\u00e9rrez, de San Mart\u00edn"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>El edificio tendr&aacute; una superficie de 1.300 metros cuadrados cubiertos y se levantar&aacute; en el distrito Buen Orden. Hoy se abrieron los sobres con la propuesta econ&oacute;mica de una firma constructora interesada en abordar la obra. Est&aacute; previsto que la ejecuci&oacute;n de los trabajos comience entre agosto y septiembre, con el objetivo de que la comunidad pueda utilizar el nuevo establecimiento desde el inicio del ciclo lectivo 2024. La inversi&oacute;n alcanza $310 millones.<\/h5>\n\n\n\n<p>El Ministerio de Planificaci&oacute;n e Infraestructura P&uacute;blica comenzar&aacute; a construir, entre agosto y setiembre, el nuevo edificio de la Escuela Especial 4-209 Blanca N&eacute;lida Guti&eacute;rrez, de San Mart&iacute;n, con el objetivo de que la comunidad educativa pueda utilizar las renovadas instalaciones desde el inicio del ciclo lectivo 2024.<\/p>\n\n\n\n<p>De esta manera, y luego de muchos a&ntilde;os de haber sido creada, la escuela Blanca Guti&eacute;rrez podr&aacute; tener edificio propio, que se emplazar&aacute; en la esquina de Apolinario Zarand&oacute;n y Miguel Bernab&eacute;, frente a la plaza del barrio Jard&iacute;n Buen Orden, a unos kil&oacute;metros del radio c&eacute;ntrico del departamento del este provincial.<\/p>\n\n\n\n<p>Se trata de 1.300 metros cuadrados de inmueble que albergar&aacute; a los m&aacute;s de 200 alumnos que asisten en la actualidad al establecimiento educativo de nivel secundario, que comparte edificio con la primaria 1-163 2 de Abril, ubicada sobre carril Norte s\/n, tambi&eacute;n del distrito Buen Orden. La obra, que comenzar&aacute; a ser ejecutada entre agosto y setiembre, demandar&aacute; una inversi&oacute;n de casi $310 millones. <\/p>\n\n\n\n<p>Hoy se abrieron los sobres con las propuestas de dos empresas constructoras interesadas en abordar los trabajos: Capsa SRL y Terra SA. La segunda de estas firmas qued&oacute; fuera de la puja por omitir la presentaci&oacute;n del sobre III con la oferta alternativa obligatoria, causal de rechazo en esta licitaci&oacute;n.<\/p>\n\n\n\n<p>El acto licitatorio fue presidido por el subsecretario de Obras P&uacute;blicas, Jorge Simoni, quien estuvo acompa&ntilde;ado de otras autoridades de la subsecretar&iacute;a y de los representantes de las firmas constructoras.<\/p>\n\n\n\n<p><strong>Con orientaci&oacute;n en agro y ambiente, huerta y vivero<\/strong><\/p>\n\n\n\n<p>La Escuela Blanca N&eacute;lida Guti&eacute;rrez es de caracter&iacute;sticas semirrurales y funciona en el edificio de la escuela primaria 2 de Abril. La modalidad de esta escuela secundaria es agro y ambiente, pero actualmente sus alumnos carecen de un lugar adecuado para desarrollar los distintos proyectos agr&iacute;colas, por lo que la nueva escuela contar&aacute; con espacios m&aacute;s amplios para instalar la huerta y el vivero.<\/p>\n\n\n\n<p>La directora de la escuela, Ana Mar&iacute;a Gatto, se mostr&oacute; &ldquo;feliz y muy contenta&rdquo; por la futura construcci&oacute;n del nuevo edificio y enfatiz&oacute; el hecho de que con la nueva escuela los alumnos tendr&aacute;n un play&oacute;n deportivo para actividades f&iacute;sicas. &ldquo;Cuando est&eacute; terminada, va a ser un sue&ntilde;o hecho realidad para toda la comunidad de El Espino&rdquo;, se&ntilde;al&oacute;.<\/p>\n\n\n\n<p><strong>Detalle de las obras a realizar<\/strong><\/p>\n\n\n\n<ul><li>1 hall de acceso principal.<\/li><li>Galer&iacute;as semicubiertas.<\/li><li>Aulas comunes.<\/li><li>Sanitarios diferenciados por sexo.<\/li><li>Aulas taller para materias especiales.<\/li><li>&Aacute;rea de Gobierno: Secretaria, Administraci&oacute;n. Direcci&oacute;n. Sala de Docentes. Sanitario Docentes y Office.<\/li><li>Recepci&oacute;n y sala de espera para padres.<\/li><li>Taller de usos m&uacute;ltiples. Comedor. Buffet. Sanitarios. Dep&oacute;sito.<\/li><li>Patios de expansi&oacute;n y recreaci&oacute;n.<\/li><li>Play&oacute;n deportivo.<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-700x315.jpg\"><img loading=\"lazy\" width=\"700\" height=\"315\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-700x315.jpg\" alt=\"\" data-id=\"319077\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=319077\" class=\"wp-image-319077 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-700x315.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-250x113.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-768x346.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-1536x691.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-2048x922.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100202-120x54.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-700x315.jpg\"><img loading=\"lazy\" width=\"700\" height=\"315\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-700x315.jpg\" alt=\"\" data-id=\"319078\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=319078\" class=\"wp-image-319078 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-700x315.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-250x113.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-768x346.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-1536x691.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-2048x922.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100214-120x54.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249.jpg\"><img loading=\"lazy\" width=\"700\" height=\"315\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249-700x315.jpg\" alt=\"\" data-id=\"319079\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=319079\" class=\"wp-image-319079 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249-700x315.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249-250x113.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249-768x346.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249-1536x691.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249-2048x922.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/07\/20220707_100249-120x54.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"El edificio tendr&aacute; una superficie de 1.300 metros cuadrados cubiertos y se levantar&aacute; en el distrito Buen Orden. Hoy se abrieron los sobres con la propuesta econ&oacute;mica de una firma constructora interesada en abordar la obra. Est&aacute; previsto que la ejecuci&oacute;n de los trabajos comience entre agosto y septiembre, con el objetivo de que la&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/obras-publicas-construira-la-nueva-escuela-4-209-blanca-nelida-gutierrez-de-san-martin\/\"><\/a>","protected":false},"author":63,"featured_media":319078,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/319076"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=319076"}],"version-history":[{"count":4,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/319076\/revisions"}],"predecessor-version":[{"id":319104,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/319076\/revisions\/319104"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/319078"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=319076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=319076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=319076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}