{"id":334641,"date":"2022-10-31T15:20:32","date_gmt":"2022-10-31T18:20:32","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=334641"},"modified":"2022-11-01T15:52:49","modified_gmt":"2022-11-01T18:52:49","slug":"se-licito-la-reparacion-integral-del-teatro-griego-frank-romero-day","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/se-licito-la-reparacion-integral-del-teatro-griego-frank-romero-day\/","title":{"rendered":"Se licit\u00f3 la reparaci\u00f3n integral del Teatro Griego Frank Romero Day"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Las tareas incluir&aacute;n el saneamiento del espacio p&uacute;blico y art&iacute;stico. Ba&ntilde;os, techos y gradas y c&aacute;maras de seguridad ser&aacute;n parte de las intervenciones principales.<\/h5>\n\n\n\n<p>Con un presupuesto oficial de $80 millones y un plazo de ejecuci&oacute;n de 60 d&iacute;as, el Gobierno de Mendoza se apresta a reparar las estructuras del emblem&aacute;tico Teatro Griego Frank Romero Day.<\/p>\n\n\n\n<p>&ldquo;Tras un exhaustivo relevamiento de las necesidades edilicias, el ministerio de Planificaci&oacute;n e Infraestructura y el de Cultura y Turismo pusieron en marcha el proceso licitatorio y se abrieron las propuestas t&eacute;cnicas y econ&oacute;micas de la empresa Apolo Sur SA, que se present&oacute; como &uacute;nica oferente&rdquo;.<\/p>\n\n\n\n<p>Las tareas incluyen la reparaci&oacute;n de gradas y de los techos de camarines, recambio de membranas, impermeabilizaci&oacute;n de la fuente central, reacondicionamiento de canaletas, revoques interiores y exteriores y colocaci&oacute;n de c&aacute;maras de seguridad.<\/p>\n\n\n\n<p>Estas intervenciones buscan dar soluci&oacute;n definitiva a los problemas de filtraci&oacute;n en el subsuelo y, para eso, se reparar&aacute; la losa de la planta baja, ubicada en el atrio del edificio, cuidando las piedras existentes, consideradas bien patrimonial.<\/p>\n\n\n\n<p>En cuanto a los ba&ntilde;os, los trabajos incluyen la remoci&oacute;n de artefactos e instalaciones el&eacute;ctricas, como tambi&eacute;n recambio de ca&ntilde;er&iacute;as, revestimientos y paneles divisorios. Adem&aacute;s, se reparar&aacute; la c&aacute;mara s&eacute;ptica y se intervendr&aacute;n los desag&uuml;es, las bombas, los ductos de ventilaci&oacute;n y las canaletas.<\/p>\n\n\n\n<p>El pliego prev&eacute; la colocaci&oacute;n de nuevos sanitarios, bachas de acero inoxidable con mesada de granito y en los pisos y paredes porcelanato rectificado.<\/p>\n\n\n\n<p>La reparaci&oacute;n general de gradas consiste no solo en reconstruir la superficie de todos los asientos, pintarlos y enumerarlos sino tambi&eacute;n en reacondicionar las canaletas existentes.<\/p>\n\n\n\n<p>En cuanto a la fachada, se revocar&aacute;n las superficies deterioradas, manteniendo las terminaciones y el color existente ya que el edificio es un bien patrimonial que no debe cambiar su fisonom&iacute;a.&nbsp;Esto incluye el reacondicionamiento de los revestimientos de fachada como las piedras sueltas que constituyen la imagen de la fachada original del teatro.<\/p>\n\n\n\n<p>Por &uacute;ltimo, la contratista encargada de las obras deber&aacute; dejar las instalaciones necesarias para la colocaci&oacute;n de ocho c&aacute;maras de seguridad en el interior del teatro que se ubicar&aacute;n en pasillos de circulaci&oacute;n general y que se alimentar&aacute;n con un sistema el&eacute;ctrico independiente y vinculado al circuito de vigilancia existente.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-700x467.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-700x467.jpeg\" alt=\"\" data-id=\"334642\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=334642\" class=\"wp-image-334642 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-700x467.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-250x167.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-768x512.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-1536x1024.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-2048x1365.jpeg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2904-120x80.jpeg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-700x467.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-700x467.jpeg\" alt=\"\" data-id=\"334643\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=334643\" class=\"wp-image-334643 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-700x467.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-250x167.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-768x512.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-1536x1024.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-2048x1365.jpeg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2882-120x80.jpeg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2894-700x467.jpeg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/IMG_2894-700x467.jpeg\" alt=\"\" data-id=\"334644\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=334644\" class=\"wp-image-334644 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"315\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39-700x315.jpeg\" alt=\"\" data-id=\"334645\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=334645\" class=\"wp-image-334645 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39-700x315.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39-250x113.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39-768x346.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39-120x54.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/10\/WhatsApp-Image-2022-10-31-at-08.52.39.jpeg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Las tareas incluir&aacute;n el saneamiento del espacio p&uacute;blico y art&iacute;stico. Ba&ntilde;os, techos y gradas y c&aacute;maras de seguridad ser&aacute;n parte de las intervenciones principales. Con un presupuesto oficial de $80 millones y un plazo de ejecuci&oacute;n de 60 d&iacute;as, el Gobierno de Mendoza se apresta a reparar las estructuras del emblem&aacute;tico Teatro Griego Frank Romero&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/se-licito-la-reparacion-integral-del-teatro-griego-frank-romero-day\/\"><\/a>","protected":false},"author":63,"featured_media":334644,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/334641"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=334641"}],"version-history":[{"count":5,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/334641\/revisions"}],"predecessor-version":[{"id":334864,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/334641\/revisions\/334864"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/334644"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=334641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=334641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=334641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}