{"id":338503,"date":"2022-11-24T12:52:54","date_gmt":"2022-11-24T15:52:54","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=338503"},"modified":"2022-11-24T19:14:14","modified_gmt":"2022-11-24T22:14:14","slug":"comenzo-la-renovacion-del-corredor-del-oeste-y-habra-media-calzada-restringida","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/comenzo-la-renovacion-del-corredor-del-oeste-y-habra-media-calzada-restringida\/","title":{"rendered":"Comenz\u00f3 la renovaci\u00f3n del Corredor del Oeste y habr\u00e1 media calzada restringida"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5><strong>Vialidad Mendoza asfaltar&aacute; esta importante v&iacute;a entre Panamericana y Carola Lorenzini. La obra durar&aacute; un mes y los trabajos ser&aacute;n de 8 a 17.&nbsp;<\/strong><\/h5>\n\n\n\n<p>Vialidad Mendoza inici&oacute; hoy la renovaci&oacute;n del Corredor del Oeste entre la Panamericana y la rotonda de calle Carola Lorenzini, un tramo de 5,5 kil&oacute;metros, entre Luj&aacute;n y Godoy Cruz que ser&aacute; completamente asfaltado en ambas manos.<\/p>\n\n\n\n<p>Por esta raz&oacute;n, durante el pr&oacute;ximo mes, el trayecto en obra estar&aacute; con media calzada restringida entre las 8 y las 17, mientras que la calzada restante se mantendr&aacute; liberada para que pueda seguir circulando el tr&aacute;nsito vehicular.&nbsp;<\/p>\n\n\n\n<p>El plan de obras de la Direcci&oacute;n Provincial de Vialidad tiene previsto la aplicaci&oacute;n de una capa de microaglomerado asf&aacute;ltico que dejar&aacute; a nuevo el circuito del Corredor del Oeste y extender&aacute; la vida &uacute;til del camino por los pr&oacute;ximos 10 o 12 a&ntilde;os, sin necesidad de otras intervenciones.&nbsp;<\/p>\n\n\n\n<p>Previo a la aplicaci&oacute;n del asfalto, las tareas que se iniciaron hoy consisten en la limpieza de la calzada, el sopleteado y sellado de las fisuras y tareas de bacheo, previas y necesarias antes de avanzar en la etapa final de la obra.&nbsp;<\/p>\n\n\n\n<p>La renovaci&oacute;n del Corredor del Oeste es fundamental para el mantenimiento de uno de los principales viaductos del Gran Mendoza que conecta a la ciudad Capital con Luj&aacute;n y Maip&uacute; atravesando Godoy Cruz y que a futuro quedar&aacute; integrado a la nueva ruta Panamericana, cuyo viaducto se extender&aacute; hacia el circuito de monta&ntilde;a.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-1\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste.png\"><img loading=\"lazy\" width=\"700\" height=\"400\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste-700x400.png\" alt=\"\" data-id=\"338504\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste.png\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=338504\" class=\"wp-image-338504 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste-700x400.png 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste-250x143.png 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste-768x439.png 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste-1536x878.png 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste-2048x1171.png 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/11\/corredor-del-oeste-120x69.png 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Vialidad Mendoza asfaltar&aacute; esta importante v&iacute;a entre Panamericana y Carola Lorenzini. La obra durar&aacute; un mes y los trabajos ser&aacute;n de 8 a 17.&nbsp; Vialidad Mendoza inici&oacute; hoy la renovaci&oacute;n del Corredor del Oeste entre la Panamericana y la rotonda de calle Carola Lorenzini, un tramo de 5,5 kil&oacute;metros, entre Luj&aacute;n y Godoy Cruz que&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/comenzo-la-renovacion-del-corredor-del-oeste-y-habra-media-calzada-restringida\/\"><\/a>","protected":false},"author":66,"featured_media":338504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,2999],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/338503"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=338503"}],"version-history":[{"count":2,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/338503\/revisions"}],"predecessor-version":[{"id":338603,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/338503\/revisions\/338603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/338504"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=338503"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=338503"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=338503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}