{"id":340705,"date":"2022-12-11T14:15:55","date_gmt":"2022-12-11T17:15:55","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=340705"},"modified":"2022-12-11T16:46:55","modified_gmt":"2022-12-11T19:46:55","slug":"matriz-productiva-convenio-vital-de-vialidad","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/matriz-productiva-convenio-vital-de-vialidad\/","title":{"rendered":"Matriz productiva: convenio vital de Vialidad"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5> Mendoza y Potasio R&iacute;o Colorado para el desarrollo de Hierro Indio.<\/h5>\n\n\n\n<p>Pr&oacute;ximo a iniciarse los cateos para determinar el potencial de explotaci&oacute;n que puede garantizar el yacimiento minero de Hierro Indio, en Malarg&uuml;e, Vialidad Mendoza y PRC (Potasio R&iacute;o Colorado) firmaron un convenio de colaboraci&oacute;n mutua para mejorar, ensanchar y conservar el camino que conecta la mina de hierro con la Ruta Nacional 40 y la apertura de plataformas sobre suelo natural. <\/p>\n\n\n\n<p>Las obras de las que se encargar&aacute; la Direcci&oacute;n Provincial de Vialidad (DPV) son claves para el r&aacute;pido avance del proyecto y adem&aacute;s para el Estado mendocino, que, a trav&eacute;s de la empresa estatal PRC, es accionista del proyecto Hierro Indio, como tambi&eacute;n para el departamento de Malarg&uuml;e, cuya ciudad estar&aacute; a pocos kil&oacute;metros de un polo de desarrollo de alto nivel.&nbsp;<\/p>\n\n\n\n<p>La mina de Hierro Indio es vital para el crecimiento de la matriz productiva de Mendoza porque ser&iacute;a la &uacute;nica de todo el pa&iacute;s y aportar&iacute;a el 30% de todo el hierro que hoy se importa desde el exterior.&nbsp;<\/p>\n\n\n\n<p>El tramo a acondicionar y dejar transitable por la DPV es el que va desde la RN 40 hasta el mismo yacimiento, pasando por Laguna Blanca y dos puestos, en un recorrido cuya distancia se extiende por 27 kil&oacute;metros. Mientras que las numerosas plataformas rectangulares de suelo natural ser&aacute;n utilizadas para un sin fin de tareas relacionadas con la iniciativa minera.&nbsp;<\/p>\n\n\n\n<p>Por los trabajos que prestar&aacute; Vialidad Mendoza para el proyecto Hierro Indio, PRC se compromete, tal cual est&aacute; expresado en el convenio, a prestar el servicio de reparaci&oacute;n del equipamiento vial que sea utilizado, al igual que la provisi&oacute;n de repuestos y materiales que sean necesario para las tareas previstas. Tambi&eacute;n se har&aacute; cargo del combustible utilizado.&nbsp;<\/p>\n\n\n\n<p>El acuerdo celebrado con PRC es similar al que hace m&aacute;s de un a&ntilde;o la DPV firm&oacute; con Emesa, el cual permiti&oacute; que Vialidad Mendoza abriera la traza de 60 kil&oacute;metros del camino a la futura presa de El Baqueano, vali&eacute;ndose de equipo recuperado y sin tener que utilizar el parque de m&aacute;quinas que estaba activo en ese momento.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/YacimimientoHierro-700x375.jpg\"><img loading=\"lazy\" width=\"700\" height=\"375\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/YacimimientoHierro-700x375.jpg\" alt=\"\" data-id=\"340706\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=340706\" class=\"wp-image-340706 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/YacimimientoHierro-700x375.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/YacimimientoHierro-250x134.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/YacimimientoHierro-768x412.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/YacimimientoHierro-120x64.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/YacimimientoHierro.jpg 1100w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.35-700x1556.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"1556\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.35-700x1556.jpeg\" alt=\"\" data-id=\"340707\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=340707\" class=\"wp-image-340707 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.35-700x1556.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.35-250x556.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.35-691x1536.jpeg 691w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.35-120x267.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.35.jpeg 720w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"1556\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24-700x1556.jpeg\" alt=\"\" data-id=\"340708\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=340708\" class=\"wp-image-340708 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24-700x1556.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24-250x556.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24-691x1536.jpeg 691w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24-120x267.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2022\/12\/WhatsApp-Image-2022-12-11-at-13.59.24.jpeg 720w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Mendoza y Potasio R&iacute;o Colorado para el desarrollo de Hierro Indio. Pr&oacute;ximo a iniciarse los cateos para determinar el potencial de explotaci&oacute;n que puede garantizar el yacimiento minero de Hierro Indio, en Malarg&uuml;e, Vialidad Mendoza y PRC (Potasio R&iacute;o Colorado) firmaron un convenio de colaboraci&oacute;n mutua para mejorar, ensanchar y conservar el camino que conecta&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/matriz-productiva-convenio-vital-de-vialidad\/\"><\/a>","protected":false},"author":61,"featured_media":340706,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,2999],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/340705"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=340705"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/340705\/revisions"}],"predecessor-version":[{"id":340711,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/340705\/revisions\/340711"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/340706"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=340705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=340705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=340705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}