{"id":346002,"date":"2023-02-08T10:50:18","date_gmt":"2023-02-08T13:50:18","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=346002"},"modified":"2023-02-08T12:24:59","modified_gmt":"2023-02-08T15:24:59","slug":"con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/","title":{"rendered":"Con la presencia de Suarez, comenz\u00f3 la construcci\u00f3n de la Doble V\u00eda del Este"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>La primera etapa, encargada por Vialidad Mendoza, estar&aacute; lista en 18 meses. Se trata de una obra hist&oacute;rica solicitada durante a&ntilde;os por los vecinos del Este.<\/h5>\n\n\n\n<p>Con la presencia del Gobernador Rodolfo Suarez, comenz&oacute; la construcci&oacute;n de los primeros cuatro kil&oacute;metros de la Doble V&iacute;a del Este, que integrar&aacute; los caminos productivos de los departamentos de Rivadavia, Jun&iacute;n y San Mart&iacute;n al corredor bioce&aacute;nico del Mercosur y brindar&aacute; mayor fluidez y seguridad vial al tr&aacute;nsito comercial y de sus habitantes.<\/p>\n\n\n\n<p>El mandatario visit&oacute; el inicio de obra que ya cuenta con una apertura de 300 metros de la nueva traza. Estuvo acompa&ntilde;ado por el vicegobernador Mario Abed; el ministro de Planificaci&oacute;n e Infraestructura, Mario Isgro; el administrador de Vialidad Mendoza, Osvaldo Romagnoli; y los intendentes de Rivadavia, Miguel Ronco; de Jun&iacute;n, H&eacute;ctor Ruiz y de San Mart&iacute;n, Raul Rufeil.<\/p>\n\n\n\n<p>La autopista, planificada por la Direcci&oacute;n Provincial de Vialidad y cuya construcci&oacute;n se adjudic&oacute; UTE integrada por Aifra, Constructora San Jos&eacute; SA, y Genco SA., estar&aacute; finalizada en 18 meses.<\/p>\n\n\n\n<p>&ldquo;Hay obras fundamentales para el desarrollo de Mendoza y para el Este como es la doble v&iacute;a que comunica Rivadavia con la Ruta 7&rdquo;, coment&oacute; Suarez y sostuvo que esta ruta aumentar&aacute; la productividad de la zona, la comodidad y comunicaci&oacute;n entre los departamentos de Mendoza.<\/p>\n\n\n\n<p>Adem&aacute;s, mencion&oacute; que esta obra unida al canal Chimbas, para el que ya se est&aacute; llevando adelante la licitaci&oacute;n, &ldquo;realmente van a ser obras ic&oacute;nicas que hace much&iacute;simos a&ntilde;os que piden en el Este, que nosotros las prometimos y las estamos concretando como todos pueden ver&rdquo;.<\/p>\n\n\n\n<p>El vicegobernador, por su parte, enfatiz&oacute; que &nbsp;&ldquo;comenzamos a ver la concreci&oacute;n de un sue&ntilde;o, el de una doble v&iacute;a que le dar&aacute; una conectividad directa a las fuerzas productivas de Jun&iacute;n y Rivadavia con el corredor bioce&aacute;nico, una obra que el Gobierno provincial impuls&oacute; con su presupuesto y su propio esfuerzo&rdquo;.<\/p>\n\n\n\n<p>En tanto que el ministro de Infraestructura y Planificaci&oacute;n afirm&oacute; que &ldquo;la Doble V&iacute;a del Este beneficiar&aacute; a una zona productiva en particular, pero a futuro, tambi&eacute;n a toda la provincia, si pensamos en la Mendoza de 2030-2050 con su respectiva planificaci&oacute;n&rdquo;.<\/p>\n\n\n\n<p>El titular de la Direcci&oacute;n Provincial de Vialidad detall&oacute; que &ldquo;ser&aacute; de dos calzadas de 7.30 metros de ancho, con dos trochas cada una, en cada sentido de circulaci&oacute;n, separadas por una baranda de hormig&oacute;n tipo new jersey, banquinas y ciclov&iacute;a pavimentadas, de 2.50 metros cada una. Tambi&eacute;n estar&aacute; iluminada en todo su recorrido. Ser&aacute; una soluci&oacute;n integral para esta parte de la zona Este&rdquo;.<\/p>\n\n\n\n<p>El intendente de Rivadavia, Miguel Ronco destac&oacute; que, &ldquo;sin dudas se trata de una obra emblem&aacute;tica, que anhelaba no s&oacute;lo Rivadavia sino toda la regi&oacute;n. La concreci&oacute;n de la Doble V&iacute;a significa desarrollo para el oasis Este, trabajo, prosperidad, mejor calidad de vida y seguridad vial&rdquo;.<\/p>\n\n\n\n<p>El jefe comunal de Jun&iacute;n, H&eacute;ctor Ruiz no dud&oacute; en celebrar el inicio de la Doble V&iacute;a: &ldquo;Es una obra muy anhelada por los vecinos porque va a transformar la econom&iacute;a de la regi&oacute;n permitiendo un gran desarrollo para el departamento, potenciando la conectividad y la salida de toda la producci&oacute;n agr&iacute;cola&rdquo;.<\/p>\n\n\n\n<p>Finalmente, su par de San Mart&iacute;n, Ra&uacute;l Rufeil, sostuvo que la Doble V&iacute;a es muy importante para las 3 comunas ya que &ldquo;no solo nos integra sino que tambi&eacute;n nos une. Los departamentos del Este siempre trabajamos de forma integrada, esta es la &uacute;nica forma de progresar y tener una mirada macro para que cada uno de los vecinos puedan tener este tipo de beneficios&rdquo;.<\/p>\n\n\n\n<p>La primera etapa de la Doble V&iacute;a del Este se extender&aacute; desde calle Falucho, en Rivadavia, hasta Ruta Provincial 60, en Jun&iacute;n, est&aacute; previsto que cuente con retornos y calles colectoras (o laterales). Correr&aacute; sobre una nueva traza que ser&aacute; paralela a calle Paso de Los Andes, de la que estar&aacute; distante poco m&aacute;s de una cuadra.<\/p>\n\n\n\n<p>En una segunda etapa est&aacute; previsto completar el proyecto para que la Doble V&iacute;a del Este llegue hasta la Ruta Nacional 7. El tramo que quedar&aacute; pendiente es de otros 8 kil&oacute;metros que completar&aacute;n un total de 12 kil&oacute;metros de recorrido.<\/p>\n\n\n\n<p>La obra potenciar&aacute; la oferta de empleo en la regi&oacute;n generando unos 300 puestos de trabajo directo y hasta 800 de forma indirecta por el impacto que la construcci&oacute;n tendr&aacute; en la econom&iacute;a local.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1-700x467.jpg\" alt=\"\" data-id=\"346049\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3058-1\/\" class=\"wp-image-346049 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3058-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1-700x467.jpg\" alt=\"\" data-id=\"346050\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3065-1\/\" class=\"wp-image-346050 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3065-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1-700x467.jpg\" alt=\"\" data-id=\"346051\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3077-1\/\" class=\"wp-image-346051 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3077-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"424\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1-700x424.jpg\" alt=\"\" data-id=\"346052\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3091-1\/\" class=\"wp-image-346052 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1-700x424.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1-250x151.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1-768x465.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1-1536x931.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1-2048x1241.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3091-1-120x73.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1-700x467.jpg\" alt=\"\" data-id=\"346053\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3092-1\/\" class=\"wp-image-346053 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3092-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1-700x467.jpg\" alt=\"\" data-id=\"346054\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3093-1\/\" class=\"wp-image-346054 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3093-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1-700x467.jpg\" alt=\"\" data-id=\"346055\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3135-1\/\" class=\"wp-image-346055 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3135-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1-700x467.jpg\" alt=\"\" data-id=\"346056\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3145-1\/\" class=\"wp-image-346056 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3145-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1-700x467.jpg\" alt=\"\" data-id=\"346057\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3148-1\/\" class=\"wp-image-346057 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3148-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1-700x467.jpg\" alt=\"\" data-id=\"346058\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3153-1\/\" class=\"wp-image-346058 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3153-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1-700x467.jpg\" alt=\"\" data-id=\"346059\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3172-1\/\" class=\"wp-image-346059 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1-768x513.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1-1536x1025.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1-2048x1367.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3172-1-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"461\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1-700x461.jpg\" alt=\"\" data-id=\"346060\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3212-1\/\" class=\"wp-image-346060 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1-700x461.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1-250x165.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1-768x506.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1-1536x1012.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1-2048x1349.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3212-1-120x79.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238.jpg\"><img loading=\"lazy\" width=\"700\" height=\"408\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238-700x408.jpg\" alt=\"\" data-id=\"346061\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3238-3\/\" class=\"wp-image-346061 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238-700x408.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238-250x146.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238-768x448.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238-1536x896.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238-2048x1195.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3238-120x70.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242.jpg\"><img loading=\"lazy\" width=\"700\" height=\"484\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242-700x484.jpg\" alt=\"\" data-id=\"346062\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3242\/\" class=\"wp-image-346062 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242-700x484.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242-250x173.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242-768x531.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242-1536x1062.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242-2048x1416.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3242-120x83.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255.jpg\"><img loading=\"lazy\" width=\"700\" height=\"449\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255-700x449.jpg\" alt=\"\" data-id=\"346063\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3255-3\/\" class=\"wp-image-346063 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255-700x449.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255-250x160.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255-768x492.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255-1536x985.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255-2048x1313.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3255-120x77.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259.jpg\"><img loading=\"lazy\" width=\"700\" height=\"420\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259-700x420.jpg\" alt=\"\" data-id=\"346064\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3259-2\/\" class=\"wp-image-346064 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259-700x420.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259-250x150.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259-768x461.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259-1536x922.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259-2048x1230.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3259-120x72.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264.jpg\"><img loading=\"lazy\" width=\"700\" height=\"441\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264-700x441.jpg\" alt=\"\" data-id=\"346065\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3264-2\/\" class=\"wp-image-346065 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264-700x441.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264-250x157.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264-768x483.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264-1536x967.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264-2048x1289.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3264-120x76.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299.jpg\"><img loading=\"lazy\" width=\"700\" height=\"432\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299-700x432.jpg\" alt=\"\" data-id=\"346066\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/dsc_3299-3\/\" class=\"wp-image-346066 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299-700x432.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299-250x154.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299-768x474.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299-1536x947.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299-2048x1263.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/DSC_3299-120x74.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"La primera etapa, encargada por Vialidad Mendoza, estar&aacute; lista en 18 meses. Se trata de una obra hist&oacute;rica solicitada durante a&ntilde;os por los vecinos del Este. Con la presencia del Gobernador Rodolfo Suarez, comenz&oacute; la construcci&oacute;n de los primeros cuatro kil&oacute;metros de la Doble V&iacute;a del Este, que integrar&aacute; los caminos productivos de los departamentos&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/con-la-presencia-de-suarez-comenzo-la-construccion-de-la-doble-via-del-este\/\"><\/a>","protected":false},"author":76,"featured_media":346068,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[19,1801,2999],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/346002"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/76"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=346002"}],"version-history":[{"count":7,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/346002\/revisions"}],"predecessor-version":[{"id":346067,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/346002\/revisions\/346067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/346068"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=346002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=346002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=346002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}