{"id":346021,"date":"2023-02-08T12:20:09","date_gmt":"2023-02-08T15:20:09","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=346021"},"modified":"2023-02-08T12:42:09","modified_gmt":"2023-02-08T15:42:09","slug":"infraestructura-elemental-pone-a-punto-dos-escuelas-importantes-de-san-rafael-para-el-inicio-de-clases","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-elemental-pone-a-punto-dos-escuelas-importantes-de-san-rafael-para-el-inicio-de-clases\/","title":{"rendered":"Infraestructura Elemental pone a punto dos escuelas importantes de San Rafael para el inicio de clases"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Se trata de las escuelas 9-003 Mercedes Tomasa San Mart&iacute;n y 4-006 Pascual Iaccarini, que est&aacute;n siendo intervenidas en sus edificios con vistas al ciclo lectivo 2023. Las obras cuentan con una inversi&oacute;n de casi $40 millones, financiada con fondos provinciales. Los trabajos se suman a otros 300 que se realizan desde 2022, con una inversi&oacute;n de $4.600 millones y beneficio para m&aacute;s de 400.000 alumnos.<\/h5>\n\n\n\n<p>La Subsecretar&iacute;a de Infraestructura Elemental contin&uacute;a con las reparaciones de escuelas en toda la provincia. El objetivo es mejorar las condiciones edilicias durante el ciclo lectivo 2023, tanto desde lo estructural como en lo que respecta a instalaciones de sistemas de calefacci&oacute;n, entre otros arreglos.<\/p>\n\n\n\n<p>En esta oportunidad, los edificios que est&aacute;n siendo intervenidos son los de las escuelas 9-003 Mercedes Tomasa San Mart&iacute;n de Balcarce (tambi&eacute;n conocida como Normal) y 4-006 Pascual Iaccarini, ambos de San Rafael, establecimientos que necesitaban urgentes arreglos y remodelaciones.<\/p>\n\n\n\n<p>En la &ldquo;Normal&rdquo;, ubicada en el radio c&eacute;ntrico del departamento sure&ntilde;o, se realiz&oacute; el recambio completo de la iluminaci&oacute;n del gimnasio, y la reparaci&oacute;n de los desag&uuml;es pluviales del patio, incluidos los del jard&iacute;n de infantes. Adem&aacute;s, se colocaron 300 m2 de piso nuevo en el jard&iacute;n de infantes, 30 metros de cierre perimetral y se arreglaron las filtraciones del techo en el mismo espacio, entre otras intervenciones.<\/p>\n\n\n\n<p>Por su parte, en la Escuela Iaccarini se intervino la planta piloto con orientaci&oacute;n agropecuaria. Se recuper&oacute; un galp&oacute;n, que fue transformado en tres aulas con nuevos cielorrasos, pisos e instalaci&oacute;n el&eacute;ctrica. En tanto que tambi&eacute;n se hicieron reparaciones de luminarias en varios sectores del establecimiento, internos y externos, incluida la granja.<\/p>\n\n\n\n<p>Las obras se realizan a trav&eacute;s de coeficientes de impacto zonales, con una inversi&oacute;n de casi $40 millones. Estos trabajos forman parte de un paquete de 80 reparaciones que est&aacute;n en ejecuci&oacute;n actualmente en toda la provincia.<\/p>\n\n\n\n<p>A su vez, dichas intervenciones se suman a otras 300 que vienen ejecut&aacute;ndose desde el a&ntilde;o pasado, con una inversi&oacute;n oficial total prevista de $4.600 millones, que est&aacute;n siendo y ser&aacute;n financiados &iacute;ntegramente con fondos provinciales. De esta manera, se beneficiar&aacute;n m&aacute;s de 400.000 alumnos de los distintos niveles educativos.<\/p>\n\n\n\n<p>Los trabajos van desde artefactos y sistemas de calefacci&oacute;n, sanitarios y playones deportivos, hasta reparaciones de cubiertas de techos, todas obras que, por ser m&aacute;s &ldquo;invasivas&rdquo;, requieren de la ausencia de alumnos y docentes en las escuelas. Por esta raz&oacute;n, muchas se est&aacute;n haciendo durante el receso estival previo al inicio del ciclo lectivo.<\/p>\n\n\n\n<p>&ldquo;Continuamos con las reparaciones de escuelas de toda la provincia y en este caso agregamos coeficientes de impacto zonales que, sumados a los que se vienen ejecutando desde el a&ntilde;o pasado, demandar&aacute;n una inversi&oacute;n de $4.600 millones. Muchas de las intervenciones tienen una continuidad, otras se iniciar&aacute;n en los pr&oacute;ximos d&iacute;as, y el resto se har&aacute; durante todo 2023&rdquo;, indic&oacute; el director de Mantenimiento y Reparaciones de escuelas, Bernardino Rodr&iacute;guez.<\/p>\n\n\n\n<p><strong>Un plan de arreglos que comenz&oacute; en 2020<\/strong><\/p>\n\n\n\n<p>Estas intervenciones que se licitaron se sumar&aacute;n a un plan integral de reparaciones de establecimientos escolares que viene ejecutando Infraestructura Elemental desde 2020, y por el que ya se invirtieron otros $4.800 millones.<\/p>\n\n\n\n<p>Al respecto, en los &uacute;ltimos tres a&ntilde;os se han hecho arreglos en casi la totalidad de los edificios educativos de la provincia. En este paquete tambi&eacute;n aparecen reparaciones menores y de calefacci&oacute;n, incluidas las de calderas en los inmuebles educativos que las utilizan en &eacute;pocas invernales.<\/p>\n\n\n\n<p>Las obras beneficiaron a m&aacute;s de 400.000 alumnos de nivel inicial, primario y secundario de las cinco regionales que componen la provincia. La mayor&iacute;a de los trabajos se sigue haciendo en los departamentos del Gran Mendoza, pero tambi&eacute;n hay ejecuciones en escuelas del Valle de Uco, el Este y Sur provincial.<\/p>\n\n\n\n<p>Las tareas vienen siendo solicitadas desde hace un largo tiempo por sus respectivas comunidades educativas. Es por esto que Infraestructura Elemental puso en marcha esta nueva etapa del plan de reparaciones, que est&aacute; previsto que se extienda hasta fines de 2023.<\/p>\n\n\n\n<p><strong>GALER&Iacute;A<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150-700x467.jpg\" alt=\"\" data-id=\"346022\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346022\" class=\"wp-image-346022 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103500__G2_3150.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166-700x467.jpg\" alt=\"\" data-id=\"346023\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346023\" class=\"wp-image-346023 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103919__G2_3166.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169-700x467.jpg\" alt=\"\" data-id=\"346024\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346024\" class=\"wp-image-346024 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207103946__G2_3169.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187-700x467.jpg\" alt=\"\" data-id=\"346025\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346025\" class=\"wp-image-346025 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104801__G2_3187.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190-700x467.jpg\" alt=\"\" data-id=\"346026\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346026\" class=\"wp-image-346026 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207104829__G2_3190.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207110211__G2_3206-700x467.jpg\" alt=\"\" data-id=\"346027\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207110211__G2_3206.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346027\" class=\"wp-image-346027 img-responsive center-block\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284-700x467.jpg\" alt=\"\" data-id=\"346028\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346028\" class=\"wp-image-346028 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112642__G2_3284.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286-700x467.jpg\" alt=\"\" data-id=\"346029\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346029\" class=\"wp-image-346029 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207112708__G2_3286.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316-700x467.jpg\" alt=\"\" data-id=\"346030\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=346030\" class=\"wp-image-346030 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316-120x80.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/02\/20230207115111__G2_3316.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se trata de las escuelas 9-003 Mercedes Tomasa San Mart&iacute;n y 4-006 Pascual Iaccarini, que est&aacute;n siendo intervenidas en sus edificios con vistas al ciclo lectivo 2023. Las obras cuentan con una inversi&oacute;n de casi $40 millones, financiada con fondos provinciales. Los trabajos se suman a otros 300 que se realizan desde 2022, con una&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/infraestructura-elemental-pone-a-punto-dos-escuelas-importantes-de-san-rafael-para-el-inicio-de-clases\/\"><\/a>","protected":false},"author":62,"featured_media":346027,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,2711],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/346021"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=346021"}],"version-history":[{"count":6,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/346021\/revisions"}],"predecessor-version":[{"id":346069,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/346021\/revisions\/346069"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/346027"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=346021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=346021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=346021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}