{"id":352706,"date":"2023-03-30T11:21:45","date_gmt":"2023-03-30T14:21:45","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=352706"},"modified":"2023-03-30T11:29:41","modified_gmt":"2023-03-30T14:29:41","slug":"se-abrio-la-licitacion-para-una-obra-clave-que-facilitara-la-circulacion-entre-san-martin-palmira-y-el-principal-centro-de-actividades-del-este","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/se-abrio-la-licitacion-para-una-obra-clave-que-facilitara-la-circulacion-entre-san-martin-palmira-y-el-principal-centro-de-actividades-del-este\/","title":{"rendered":"Se abri\u00f3 la licitaci\u00f3n de una obra clave para la circulaci\u00f3n entre San Mart\u00edn, Palmira y el principal centro de actividades del Este"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5><strong>Se present&oacute; una empresa, con una oferta de $185 millones.<\/strong><\/h5>\n\n\n\n<p>Vialidad Mendoza abri&oacute; las ofertas para licitar la construcci&oacute;n de una obra clave para las ciudades de San Mart&iacute;n y Palmira, que mejorar&aacute; la circulaci&oacute;n entre ambas comunidades como tambi&eacute;n los ingresos y egresos desde Ruta Nacional 7, el tr&aacute;nsito de carga pesada y la fuerte actividad de la zona por la cercan&iacute;a de centros culturales, deportivos y de ocio.<\/p>\n\n\n\n<p>Se trata de la construcci&oacute;n de la rotonda que se ubicar&aacute; en el cruce de la Ruta Provincial 50 y Ruta Provincial 63-Calle M&iacute;guez, obra fundamental en el punto de mayor tr&aacute;nsito automovil&iacute;stico de la zona.<\/p>\n\n\n\n<p>Tras el inicio formal del acto, una empresa se present&oacute; interesada en hacer la obra, que ya hab&iacute;a sido llamada a licitaci&oacute;n sin &eacute;xito en 2021 y 2022. La oferta fue de la firma Procon SRL. por $185.632.954, con un plazo de obra de seis meses.<\/p>\n\n\n\n<p>El intendente de San Martin, Ra&uacute;l Rufeil, remarc&oacute; que &ldquo;esta obra es muy esperada por nosotros, porque aliviar&aacute; la salida de productos agr&iacute;colas de Rivadavia y Jun&iacute;n, la actividad de la planta de Fecovita y el tr&aacute;nsito para los vecinos de los barrios cercanos&rdquo;.<\/p>\n\n\n\n<p>Por su parte, el administrador de la Direcci&oacute;n Provincial de Vialidad, Osvaldo Romagnoli, afirm&oacute;: &ldquo;Esta obra es fundamental para ordenar uno de los puntos m&aacute;s activos de la zona y descomprimir los accesos al Hospital Perrupato, que hoy est&aacute; muy recargado por la falta de esta obra&rdquo;.<\/p>\n\n\n\n<p>El consejero por la Zona Este de la DPV, Jorge Garc&iacute;a Zalazar, resalt&oacute; que &ldquo;esta rotonda facilitar&aacute; la conectividad vial entre San Martin y Palmira, como tambi&eacute;n el gran movimiento que hay en este punto important&iacute;simo del Este&rdquo;<\/p>\n\n\n\n<p><strong>El impacto de la rotonda<\/strong><\/p>\n\n\n\n<p>La intersecci&oacute;n donde se construir&aacute; la rotonda involucra a la RP 50, que es la principal v&iacute;a que conecta a las ciudades de San Mart&iacute;n con Palmira. Tambi&eacute;n, sobre esta ruta y a pocos metros, se encuentra la Bodega Toro, que cuenta con una de las plantas fraccionadoras de vino m&aacute;s grandes de Sudam&eacute;rica, todo perteneciente a Fecotiva, establecimiento que tiene un intenso movimiento de cargas.<\/p>\n\n\n\n<p>Adem&aacute;s, muy cerca del cruce se encuentran el Aut&oacute;dromo Jorge &Aacute;ngel Pena, el Parque Agnesi, el Tempo del Vino, el anfiteatro Juan Pablo II y el Centro de Congresos y Exposiciones de San Martin. Esos sitios se han transformado en epicentros de reuniones, actividades, festivales y eventos en las zona Este, a lo que se suman otra bodega y las instalaciones del club Tacur&uacute;, donde se practican distintas disciplinas deportivas.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104501836-700x525.jpg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104501836-700x525.jpg\" alt=\"\" data-id=\"352712\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=352712\" class=\"wp-image-352712 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544.jpg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544-700x525.jpg\" alt=\"\" data-id=\"352713\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=352713\" class=\"wp-image-352713 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544-700x525.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544-250x188.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544-768x576.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544-1536x1152.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544-2048x1536.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/03\/IMG_20230330_104544544-120x90.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se present&oacute; una empresa, con una oferta de $185 millones. Vialidad Mendoza abri&oacute; las ofertas para licitar la construcci&oacute;n de una obra clave para las ciudades de San Mart&iacute;n y Palmira, que mejorar&aacute; la circulaci&oacute;n entre ambas comunidades como tambi&eacute;n los ingresos y egresos desde Ruta Nacional 7, el tr&aacute;nsito de carga pesada y la&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/se-abrio-la-licitacion-para-una-obra-clave-que-facilitara-la-circulacion-entre-san-martin-palmira-y-el-principal-centro-de-actividades-del-este\/\"><\/a>","protected":false},"author":66,"featured_media":352712,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,2999],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/352706"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=352706"}],"version-history":[{"count":5,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/352706\/revisions"}],"predecessor-version":[{"id":352721,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/352706\/revisions\/352721"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/352712"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=352706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=352706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=352706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}