{"id":359999,"date":"2023-05-24T18:00:29","date_gmt":"2023-05-24T21:00:29","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=359999"},"modified":"2023-05-26T10:37:48","modified_gmt":"2023-05-26T13:37:48","slug":"el-ministro-isgro-recorrio-la-construccion-de-la-nueva-escuela-especial-2-039-padre-jose-carrone-de-san-rafael","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/el-ministro-isgro-recorrio-la-construccion-de-la-nueva-escuela-especial-2-039-padre-jose-carrone-de-san-rafael\/","title":{"rendered":"El ministro Isgro recorri\u00f3 la construcci\u00f3n de la nueva escuela especial 2-039 Padre Jos\u00e9 Carrone, de San Rafael"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p><strong>Se trata de una obra que muestra m&aacute;s de 70% de avance y que est&aacute; previsto terminarla a fines de septiembre. Es un edificio de 1.200 metros cuadrados que comenzar&aacute; a ser utilizado desde el inicio del ciclo lectivo 2024. La inversi&oacute;n ser&aacute; de $300 millones y beneficiar&aacute; a m&aacute;s de 100 alumnos con distintas discapacidades.<\/strong><\/p>\n\n\n\n<p>El ministro de Planificaci&oacute;n e Infraestructura P&uacute;blica, Mario Isgro, recorri&oacute; esta semana la construcci&oacute;n de la nueva escuela especial 2-039 Padre Jos&eacute; Alfredo Carrone, de San Rafael, que en la actualidad muestra un avance que supera el 70%. Est&aacute; previsto terminar la obra a fines de septiembre, con el objetivo de que la comunidad educativa pueda comenzar a utilizarla desde el inicio del ciclo lectivo 2024.<\/p>\n\n\n\n<p>Durante la visita, el funcionario estuvo acompa&ntilde;ado por la directora Bel&eacute;n G&oacute;mez y un grupo de docentes del establecimiento ubicado en el Paraje Pobre Diablo, y se mostr&oacute; conforme con los trabajos realizados hasta este momento.<\/p>\n\n\n\n<p>&ldquo;Es una obra hermosa, con muy buena calidad de ejecuci&oacute;n y que beneficiar&aacute; a m&aacute;s de 100 alumnos con distintas discapacidades. Estamos muy contentos por c&oacute;mo est&aacute; quedando. Esperamos terminarla a fines de septiembre para que la comunidad educativa pueda comenzar a utilizarla lo antes posible&rdquo;, se&ntilde;al&oacute; Isgro luego de la recorrida.<\/p>\n\n\n\n<p>Por su parte, la directora de la escuela tambi&eacute;n manifest&oacute; su satisfacci&oacute;n, junto al resto de las docentes, &ldquo;porque ya falta menos y vemos un edificio maravilloso para nuestros alumnos&rdquo;. Y enseguida agreg&oacute;: &ldquo;No vemos la hora de que nos mudemos para disfrutar de esta nueva escuela, que nos llena de orgullo y nos obliga a redoblar esfuerzos en nuestro trabajo&rdquo;.<\/p>\n\n\n\n<p>Por estos d&iacute;as, la firma contratista encargada de los trabajos, Universo SA, ya termin&oacute; de levantar la mamposter&iacute;a gruesa y concluy&oacute; los revoques gruesos y finos en muros. Adem&aacute;s, finaliz&oacute; el montaje de toda la cubierta del edificio educativo y sigue en plena colocaci&oacute;n de pisos en aulas y galer&iacute;as.<\/p>\n\n\n\n<p>El nuevo edificio est&aacute; ubicado en un predio cercano a la actual escuela (cuyo inmueble es alquilado por la Direcci&oacute;n General de Escuelas), sobre la calle Ej&eacute;rcito de los Andes s\/n y tiene una superficie de m&aacute;s de 2.000 metros cuadrados del Paraje Pobre Diablo. El objetivo de Obras P&uacute;blicas es que est&eacute; terminado para el inicio del ciclo lectivo 2024. Cuenta con una inversi&oacute;n total de $300 millones, financiados con fondos &iacute;ntegramente provinciales.<\/p>\n\n\n\n<p>El proyecto de la nueva escuela se materializ&oacute; luego de recibir inquietudes manifestadas por la comunidad educativa del establecimiento, en reuniones que se realizaron en conjunto con personal t&eacute;cnico de la Subsecretar&iacute;a de Obras P&uacute;blicas y el aporte de la Direcci&oacute;n General de Escuelas.<\/p>\n\n\n\n<p>El nuevo edificio de la Escuela Carrone tiene una superficie cubierta de 1.200 metros cuadrados, con espacios m&aacute;s amplios y c&oacute;modos que los actuales, y beneficiar&aacute; la escolaridad de m&aacute;s de 100 alumnos (ni&ntilde;os y j&oacute;venes) que presentan distintas discapacidades mentales, motrices y m&uacute;ltiples.<\/p>\n\n\n\n<p><strong>Mejorar&aacute; la calidad educativa de ni&ntilde;os con discapacidad<\/strong><\/p>\n\n\n\n<p>El establecimiento ofrecer&aacute;, adem&aacute;s, los espacios necesarios para que los docentes y alumnos puedan mejorar su calidad educativa. En este sentido, habr&aacute; seis aulas comunes de nivel primario y una sala de nivel inicial con jard&iacute;n maternal. Contar&aacute; tambi&eacute;n con sala de atenci&oacute;n temprana y estimulaci&oacute;n, y sala de psicomotricidad, entre otros espacios.<\/p>\n\n\n\n<p>En tanto, est&aacute; previsto que el inmueble tenga gabinete psicopedag&oacute;gico, taller de pl&aacute;stica y ciencias naturales, adem&aacute;s de un centro de recursos multimediales, entre otros espacios.<\/p>\n\n\n\n<p><strong>Detalle de las obras<\/strong><\/p>\n\n\n\n<ul><li>1 hall de acceso principal<\/li><li>Galer&iacute;as cubiertas<\/li><li>6 aulas comunes.<\/li><li>Sala de Nivel Inicial con sanitarios<\/li><li>Taller de Pl&aacute;stica y Ciencias Naturales<\/li><li>Centro de Recursos Multimedial<\/li><li>Sala de estimulaci&oacute;n y atenci&oacute;n temprana<\/li><li>Sala de Psicomotricidad<\/li><li>&Aacute;rea de Gobierno: Secretaria, Administraci&oacute;n y archivo. Direcci&oacute;n. Vicedirecci&oacute;n.&nbsp; Sala de Docentes. Sanitario Docentes, y Office.<\/li><li>Recepci&oacute;n y sala de espera para padres.<\/li><li>Gabinete Psicopedag&oacute;gico<\/li><li>SUM-comedor: con cocina, despensa. Sanitarios. Dep&oacute;sito.<\/li><li>Grupos Sanitarios (diferenciados por sexo)<\/li><li>Patio de ceremonias y recreaci&oacute;n<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8-700x394.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8-700x394.jpeg\" alt=\"\" data-id=\"360002\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=360002\" class=\"wp-image-360002 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8-1536x864.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-8.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-4-700x466.jpeg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-4-700x466.jpeg\" alt=\"\" data-id=\"360004\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=360004\" class=\"wp-image-360004 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5-700x394.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5-700x394.jpeg\" alt=\"\" data-id=\"360003\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=360003\" class=\"wp-image-360003 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5-1536x864.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.12-5.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"466\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17-700x466.jpeg\" alt=\"\" data-id=\"360005\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=360005\" class=\"wp-image-360005 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17-700x466.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17-250x167.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17-768x512.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17-1536x1023.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17-120x80.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/05\/WhatsApp-Image-2023-05-23-at-13.32.11-17.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se trata de una obra que muestra m&aacute;s de 70% de avance y que est&aacute; previsto terminarla a fines de septiembre. Es un edificio de 1.200 metros cuadrados que comenzar&aacute; a ser utilizado desde el inicio del ciclo lectivo 2024. La inversi&oacute;n ser&aacute; de $300 millones y beneficiar&aacute; a m&aacute;s de 100 alumnos con distintas&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/el-ministro-isgro-recorrio-la-construccion-de-la-nueva-escuela-especial-2-039-padre-jose-carrone-de-san-rafael\/\"><\/a>","protected":false},"author":63,"featured_media":360004,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/359999"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=359999"}],"version-history":[{"count":8,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/359999\/revisions"}],"predecessor-version":[{"id":360186,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/359999\/revisions\/360186"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/360004"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=359999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=359999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=359999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}