{"id":365264,"date":"2023-07-06T16:25:37","date_gmt":"2023-07-06T19:25:37","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=365264"},"modified":"2023-07-06T17:12:44","modified_gmt":"2023-07-06T20:12:44","slug":"la-ruta-clave-para-una-zona-de-vinedos-premium-a-nivel-mundial-ya-tiene-tres-empresas-interesadas-para-su-construccion","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/la-ruta-clave-para-una-zona-de-vinedos-premium-a-nivel-mundial-ya-tiene-tres-empresas-interesadas-para-su-construccion\/","title":{"rendered":"La ruta clave para una zona de vi\u00f1edos premium a nivel mundial ya tiene tres empresas interesadas para su construcci\u00f3n"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Vialidad Mendoza abri&oacute; las ofertas para los nuevos 13 kil&oacute;metros de calle La Vencedora, en Gualtallary, Tupungato.<\/h5>\n\n\n\n<p>Tres empresas presentaron sus ofertas para construir un camino clave para la producci&oacute;n de vinos y el desarrollo del enoturismo de alta gama en Gualtallary, Tupungato, convocatoria de precios que fue realizada por Vialidad Mendoza. Se trata de un tramo de 13 kil&oacute;metros de la calle La Vencedora, una obra que se dise&ntilde;&oacute; a partir de un ambicioso proyecto p&uacute;blico-privado.<\/p>\n\n\n\n<p>Las firmas que adquirieron pliegos y se mostraron interesadas realizaron las siguientes ofertas: Luis Pagliara SA present&oacute; la opci&oacute;n m&aacute;s econ&oacute;mica, por 2.078 millones de pesos; Vialmani SA le sigui&oacute;, con una propuesta de 2.150 millones, y Laugero SA ofert&oacute; 2.177 millones.<\/p>\n\n\n\n<p>Famoso, por ser Gualtallary uno de los epicentros mendocinos en la elaboraci&oacute;n de vinos de altura, el tramo a construir se extiende desde calle La Costa hasta Estancia Silva, en cuyo recorrido, hoy de tierra, se ubican bodegas de reconocidas marcas, hoteles y gastronom&iacute;a de primer nivel e importantes desarrollos inmobiliarios.<\/p>\n\n\n\n<p>El ministro de Planificaci&oacute;n e Infraestructura P&uacute;blica, Mario Isgro, afirm&oacute; al t&eacute;rmino del acto que &ldquo;esta es una ruta muy importante, porque es una zona donde tenemos vinos con una categorizaci&oacute;n de importancia a nivel mundial pero adem&aacute;s va a generar un gran impacto en el turismo, en la producci&oacute;n, en la accesibilidad a las escuelas que hay en el lugar, al dique Las Tunas, que est&aacute; en la zona&rdquo;.<\/p>\n\n\n\n<p>Por su parte, el administrador general de la Direcci&oacute;n Provincial de Vialidad (DPV), Osvaldo Romagnoli, destac&oacute; que &ldquo;gracias a este proyecto p&uacute;blico- privado pudimos afrontar el desaf&iacute;o de la obra con antelaci&oacute;n, lo que nos permitir&aacute; llegar mucho antes a construir la ruta, a diferencia si lo hubi&eacute;semos hecho solo con nuestro presupuesto&rdquo;.<\/p>\n\n\n\n<p>El proyecto de La Vencedora result&oacute; de una iniciativa p&uacute;blico-privada en la que los propietarios y productores de la zona acordaron con Vialidad Mendoza afrontar las obras previas a partir de las cuales y sobre ellas la que la DPV realiz&oacute; la licitaci&oacute;n de la obra.<\/p>\n\n\n\n<p>En este sentido, el ministro Isgro destac&oacute; el modelo &ldquo;que el mismo Gobernador Rodolfo Suarez nos inculc&oacute; impulsar a trav&eacute;s de la innovaci&oacute;n y la eficiencia del Estado. En este caso lo aplicamos, porque entre los vecinos y productores de la zona y Vialidad Mendoza se hizo una asociaci&oacute;n p&uacute;blico-privada para correr conjuntamente con los gastos y el desarrollo&rdquo;.<\/p>\n\n\n\n<p>As&iacute; fue que se form&oacute; un consorcio privado que se encarg&oacute; de realizar las obras de alcantarillado. Construyeron unas 30 alcantarillas en total y la canalizaci&oacute;n lateral de agua, trabajos fundamentales para evitar la anegaci&oacute;n del camino por lluvias o desbordes de los canales de riego.<\/p>\n\n\n\n<p>Esta etapa ya fue finalizada y, cumplido el compromiso de los particulares, es el turno de la Direcci&oacute;n Provincial de Vialidad para iniciar la construcci&oacute;n del paquete estructural, las obras complementarias y la ruta en s&iacute; misma, una vez que se adjudiquen las ofertas presentadas hoy.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-1-700x466.jpeg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-1-700x466.jpeg\" alt=\"\" data-id=\"365266\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=365266\" class=\"wp-image-365266 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-700x466.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"466\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-700x466.jpeg\" alt=\"\" data-id=\"365267\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=365267\" class=\"wp-image-365267 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-700x466.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-250x167.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-768x512.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-120x80.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53.jpeg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"466\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2-700x466.jpeg\" alt=\"\" data-id=\"365268\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=365268\" class=\"wp-image-365268 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2-700x466.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2-250x167.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2-768x512.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2-120x80.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-06-at-16.13.53-2.jpeg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Vialidad Mendoza abri&oacute; las ofertas para los nuevos 13 kil&oacute;metros de calle La Vencedora, en Gualtallary, Tupungato. Tres empresas presentaron sus ofertas para construir un camino clave para la producci&oacute;n de vinos y el desarrollo del enoturismo de alta gama en Gualtallary, Tupungato, convocatoria de precios que fue realizada por Vialidad Mendoza. Se trata de&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/la-ruta-clave-para-una-zona-de-vinedos-premium-a-nivel-mundial-ya-tiene-tres-empresas-interesadas-para-su-construccion\/\"><\/a>","protected":false},"author":63,"featured_media":365266,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/365264"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=365264"}],"version-history":[{"count":5,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/365264\/revisions"}],"predecessor-version":[{"id":365291,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/365264\/revisions\/365291"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/365266"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=365264"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=365264"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=365264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}