{"id":367698,"date":"2023-07-26T15:52:27","date_gmt":"2023-07-26T18:52:27","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=367698"},"modified":"2023-07-27T00:23:33","modified_gmt":"2023-07-27T03:23:33","slug":"vialidad-mendoza-comenzo-con-las-mejoras-de-un-puente-que-conecta-a-los-departamentos-de-lavalle-y-san-martin","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-comenzo-con-las-mejoras-de-un-puente-que-conecta-a-los-departamentos-de-lavalle-y-san-martin\/","title":{"rendered":"Vialidad Mendoza comenz\u00f3 con las mejoras de un  puente que conecta Lavalle y San Mart\u00edn"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Por los trabajos en el puente del r&iacute;o Mendoza, sobre la Ruta Provincial  34, estar&aacute; interrumpido el tr&aacute;nsito entre las  8 y las 18.30, desde hoy y hasta el viernes 28.<\/h5>\n\n\n\n<p>Vialidad Mendoza inici&oacute; una importante obra de mejoramiento en el puente del r&iacute;o Mendoza que divide los distritos de Costa de Araujo (Lavalle) y Nueva California (San Mart&iacute;n), sobre la Ruta Provincial 34. Las tareas implicar&aacute;n la interrupci&oacute;n del tr&aacute;nsito desde hoy mi&eacute;rcoles 26 hasta el viernes 28 inclusive, de 8 a 18.30. Fuera de esos horarios, el puente estar&aacute; transitable para todo tipo de veh&iacute;culos.<\/p>\n\n\n\n<p>Los trabajos consisten en la renovaci&oacute;n de las juntas de la estructura con el fin de brindar mayor y mejor seguridad vial a los conductores, adem&aacute;s de estirar la vida &uacute;til del puente.<\/p>\n\n\n\n<p>Durante los horarios y d&iacute;as de interrupci&oacute;n del flujo vehicular, el transporte p&uacute;blico de pasajeros que circula entre Costa de Araujo y Nueva California lo seguir&aacute; haciendo, pero con un desv&iacute;o ya programado por Gustavo Andr&eacute;.<\/p>\n\n\n\n<p>El gerente t&eacute;cnico de la Direcci&oacute;n Provincial de Vialidad, ingeniero Gustavo Cantero, destac&oacute;: &ldquo;En tres d&iacute;as vamos a tener concluida la renovaci&oacute;n de las juntas del puente de Costa de Araujo-Nueva California, una obra muy reclamada por los vecinos de ambos distritos y por los productores&rdquo;.<\/p>\n\n\n\n<p>Precis&oacute; que &ldquo;fuera de los horarios de corte, esto es despu&eacute;s de las 18.30 y hasta antes de las 8 de la ma&ntilde;ana, se podr&aacute; cruzar el puente normalmente con cualquier tipo de veh&iacute;culo. La interrupci&oacute;n solo estar&aacute; vigente en los horarios en que est&eacute;n trabajando sobre la estructura&rdquo;.<\/p>\n\n\n\n<p>Cantero resalt&oacute; que &ldquo;esta obra es parte del Programa de Mejoramiento de Puentes que estamos haciendo en toda la provincia, y que implica la renovaci&oacute;n de juntas de 22 estructuras que atraviesan los r&iacute;os Mendoza, Tunuy&aacute;n, Atuel y Diamante&rdquo;.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"933\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1-700x933.jpeg\" alt=\"\" data-id=\"367743\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-comenzo-con-las-mejoras-de-un-puente-que-conecta-a-los-departamentos-de-lavalle-y-san-martin\/whatsapp-image-2023-07-26-at-17-59-56-1\/\" class=\"wp-image-367743 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1-700x933.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1-250x333.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1-768x1024.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1-120x160.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-1.jpeg 867w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"933\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59-700x933.jpeg\" alt=\"\" data-id=\"367746\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-comenzo-con-las-mejoras-de-un-puente-que-conecta-a-los-departamentos-de-lavalle-y-san-martin\/whatsapp-image-2023-07-26-at-17-59-59\/\" class=\"wp-image-367746 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59-700x933.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59-250x333.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59-768x1024.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59-120x160.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.59.jpeg 867w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-08.41.52-700x496.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"496\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-08.41.52-700x496.jpeg\" alt=\"\" data-id=\"367700\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=367700\" class=\"wp-image-367700 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-08.41.52-700x496.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-08.41.52-250x177.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-08.41.52-768x544.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-08.41.52-120x85.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-08.41.52.jpeg 1207w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-700x525.jpeg\" alt=\"\" data-id=\"367744\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-comenzo-con-las-mejoras-de-un-puente-que-conecta-a-los-departamentos-de-lavalle-y-san-martin\/whatsapp-image-2023-07-26-at-17-59-56\/\" class=\"wp-image-367744 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.56.jpeg 1156w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.57.jpeg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.57-700x525.jpeg\" alt=\"\" data-id=\"367745\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2023\/07\/WhatsApp-Image-2023-07-26-at-17.59.57.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-comenzo-con-las-mejoras-de-un-puente-que-conecta-a-los-departamentos-de-lavalle-y-san-martin\/whatsapp-image-2023-07-26-at-17-59-57\/\" class=\"wp-image-367745 img-responsive center-block\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Por los trabajos en el puente del r&iacute;o Mendoza, sobre la Ruta Provincial 34, estar&aacute; interrumpido el tr&aacute;nsito entre las 8 y las 18.30, desde hoy y hasta el viernes 28. Vialidad Mendoza inici&oacute; una importante obra de mejoramiento en el puente del r&iacute;o Mendoza que divide los distritos de Costa de Araujo (Lavalle) y&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-comenzo-con-las-mejoras-de-un-puente-que-conecta-a-los-departamentos-de-lavalle-y-san-martin\/\"><\/a>","protected":false},"author":63,"featured_media":367745,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801,2999],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/367698"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/63"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=367698"}],"version-history":[{"count":6,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/367698\/revisions"}],"predecessor-version":[{"id":367747,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/367698\/revisions\/367747"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/367745"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=367698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=367698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=367698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}