{"id":394428,"date":"2024-02-14T11:22:17","date_gmt":"2024-02-14T14:22:17","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=394428"},"modified":"2024-02-14T17:29:07","modified_gmt":"2024-02-14T20:29:07","slug":"mendoza-con-energia-la-linea-de-alta-tension-cruz-de-piedra-esta-a-un-92-y-aportara-seguridad-al-sistema","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/mendoza-con-energia-la-linea-de-alta-tension-cruz-de-piedra-esta-a-un-92-y-aportara-seguridad-al-sistema\/","title":{"rendered":"Mendoza con energ\u00eda: la l\u00ednea de alta tensi\u00f3n Cruz de Piedra est\u00e1 a 92% y aportar\u00e1 seguridad al sistema"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Proyectada hace m&aacute;s de 40 a&ntilde;os, hoy se concreta con una inversi&oacute;n de U$S20 millones. Es crucial para incrementar la seguridad, calidad y confiabilidad del sistema ante la creciente demanda.<\/h5>\n\n\n\n<p>La L&iacute;nea de Alta Tensi&oacute;n Cruz de Piedra, la obra energ&eacute;tica m&aacute;s importante de los &uacute;ltimos tiempos en Mendoza, ya est&aacute; avanzada en un 92% y en los pr&oacute;ximos meses funcionar&aacute; a pleno, para dar previsibilidad y garant&iacute;a de servicio.<\/p>\n\n\n\n<p>Proyectada hace m&aacute;s de 40 a&ntilde;os, el Gobierno de Mendoza tom&oacute; la determinaci&oacute;n de concretarla para evitar un colapso y dar seguridad ante la creciente demanda. <\/p>\n\n\n\n<p>Hoy se realiza con una inversi&oacute;n de U$S20 millones y el financiamiento del Fondo Fiduciario del Plan de Infraestructura El&eacute;ctrica de Alta Tensi&oacute;n de Zonas Aisladas y en Desarrollo (FOPIATZAD).<\/p>\n\n\n\n<p>Hasta ahora, el sistema el&eacute;ctrico provincial ten&iacute;a instalados 1.500 megavatios de potencia total y esta l&iacute;nea casi duplicar&aacute; la capacidad, lo que dar&aacute; mejor respuesta y operatividad frente a picos de demanda, fallas del sistema de generaci&oacute;n en Mendoza y en provincias vecinas.<\/p>\n\n\n\n<p>&ldquo;Esto significa evitar los cortes que hemos tenido anteriormente por falta de flexibilidad y capacidad de despacho de sistema de transporte&rdquo;, explic&oacute;, en un recorrido por la obra, la ministra de Energ&iacute;a y Ambiente, Jimena Latorre.<\/p>\n\n\n\n<p>&ldquo;La Provincia ha puesto recursos para que esta l&iacute;nea de transporte pueda brindar seguridad no solo a Mendoza, sino tambi&eacute;n a vecinas como San Juan. La obra est&aacute; al 92% y en los pr&oacute;ximos meses, vamos a tener conexi&oacute;n total, lo que va a permitir evacuar tambi&eacute;n la generaci&oacute;n que viene de hidroel&eacute;ctricas del Sur, como Agua del Toro, a trav&eacute;s de 22 kil&oacute;metros de l&iacute;nea de alta tensi&oacute;n&rdquo;, agreg&oacute; la ministra.<\/p>\n\n\n\n<p>&ldquo;La incorporaci&oacute;n de la obra LAT 220 kV Doble Terna entre la ET Cruz de Piedra (Maip&uacute;) con la ET Gran Mendoza (Jun&iacute;n), permite mejorar la confiabilidad de la red&rdquo;, explic&oacute; Latorre.<\/p>\n\n\n\n<p>Adem&aacute;s de distribuir energ&iacute;a limpia con generaci&oacute;n cero de Co2, cubrir&aacute; la demanda creciente durante picos de verano e invierno e incrementar&aacute; la seguridad, calidad y confiabilidad de un sistema que se encuentra en riesgo de colapso desde hace tiempo.<\/p>\n\n\n\n<p><strong>Energ&iacute;a limpia y construcci&oacute;n de vanguardia<\/strong><\/p>\n\n\n\n<p>La L&iacute;nea de Alta Tensi&oacute;n Cruz de Piedra &ndash; Gran Mendoza comenz&oacute; a planificarse hace 40 a&ntilde;os, cuando todav&iacute;a exist&iacute;a Agua y Energ&iacute;a SE. La Empresa Mendocina de Energ&iacute;a (EMESA), a pedido del Gobierno de Mendoza, reflot&oacute; el proyecto para mejorar la distribuci&oacute;n ante la creciente demanda.<\/p>\n\n\n\n<p>Cabe recordar que las provincias de Mendoza y San Juan se vinculan el&eacute;ctricamente con el Sistema Nacional en tres puntos: ET Gran Mendoza, ET Nueva San Juan y ET R&iacute;o Diamante. En el primer punto, trascendental para esta obra, la conexi&oacute;n el&eacute;ctrica se realiza a trav&eacute;s de una doble terna de 132 KV, entre Gran Mendoza y Cruz de Piedra.<\/p>\n\n\n\n<p>&ldquo;En caso de no contar con la generaci&oacute;n local, ya sea por restricciones en el suministro de gas o cualquier otra causa que implique indisponibilidad de la misma, se iban a producir restricciones en el abastecimiento el&eacute;ctrico del &aacute;rea&rdquo;, explic&oacute; Latorre.<\/p>\n\n\n\n<p>Esto se traducir&iacute;a en un colapso total del sistema para la provincia de Mendoza, que se evita con esta obra para cubrir los picos de demanda en verano y en invierno. Adem&aacute;s, la concreci&oacute;n de Cruz de Piedra permitir&aacute; instalar en un futuro dos nuevas ET en Mendoza Norte y Capiz, aportando al &aacute;rea mayor potencia desde el sistema de 500 kV a un costo bajo.<\/p>\n\n\n\n<p>Esta obra se construy&oacute; con los m&aacute;s altos est&aacute;ndares, con torres de acero cuya altura oscila entre los 40 y 45 m de alto y sistema de doble cadena en &ldquo;v&rdquo;, lo que baja la afectaci&oacute;n a los propietarios de los terrenos por donde pasa la l&iacute;nea y reduce el ancho de la franja de afectaci&oacute;n (Servidumbre).<\/p>\n\n\n\n<p><strong>En datos<\/strong><\/p>\n\n\n\n<p>&bull; USD 20,67 millones de Monto de obra adjudicada<br>&bull; 617 MVA de Capacidad Instalada de l&iacute;nea<br>&bull; 142.500 metros de Conductor ACSR 435\/55 mm&sup2;<br>&bull; 25.700 metros de conductor OPGW (Cable de Guardia FO).<br>&bull; 55 estructuras met&aacute;licas reticuladas con alturas que oscilan entre 40 y 45 metros<br>&bull; 52 m ancho de franja de Servidumbre Administrativa de Electroducto.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41-700x525.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41-700x525.jpeg\" alt=\"\" data-id=\"394432\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=394432\" class=\"wp-image-394432 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41-1536x1152.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.41.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1-700x525.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1-700x525.jpeg\" alt=\"\" data-id=\"394433\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=394433\" class=\"wp-image-394433 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1-1536x1152.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-700x525.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-700x525.jpeg\" alt=\"\" data-id=\"394434\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=394434\" class=\"wp-image-394434 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-1536x1152.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.40.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-1-700x525.jpeg\"><img src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-1-700x525.jpeg\" alt=\"\" data-id=\"394435\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=394435\" class=\"wp-image-394435 img-responsive center-block\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-700x525.jpeg\" alt=\"\" data-id=\"394436\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=394436\" class=\"wp-image-394436 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-1536x1152.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/02\/WhatsApp-Image-2024-02-14-at-11.15.39.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Proyectada hace m&aacute;s de 40 a&ntilde;os, hoy se concreta con una inversi&oacute;n de U$S20 millones. Es crucial para incrementar la seguridad, calidad y confiabilidad del sistema ante la creciente demanda. La L&iacute;nea de Alta Tensi&oacute;n Cruz de Piedra, la obra energ&eacute;tica m&aacute;s importante de los &uacute;ltimos tiempos en Mendoza, ya est&aacute; avanzada en un 92%&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/mendoza-con-energia-la-linea-de-alta-tension-cruz-de-piedra-esta-a-un-92-y-aportara-seguridad-al-sistema\/\"><\/a>","protected":false},"author":61,"featured_media":394435,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,3042],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/394428"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=394428"}],"version-history":[{"count":8,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/394428\/revisions"}],"predecessor-version":[{"id":394462,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/394428\/revisions\/394462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/394435"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=394428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=394428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=394428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}