{"id":410656,"date":"2024-05-21T08:14:19","date_gmt":"2024-05-21T11:14:19","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=410656"},"modified":"2024-05-21T09:11:06","modified_gmt":"2024-05-21T12:11:06","slug":"ypf-continuara-explorando-en-el-lado-mendocino-de-vaca-muerta-con-inversiones-aproximadas-de-us-30-millones","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/ypf-continuara-explorando-en-el-lado-mendocino-de-vaca-muerta-con-inversiones-aproximadas-de-us-30-millones\/","title":{"rendered":"YPF continuar\u00e1 explorando en el lado mendocino de Vaca Muerta con inversiones aproximadas de US$ 30 millones"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5><strong>La empresa dio a conocer resultados auspiciosos de sus exploraciones en Paso Bardas Norte y CN-VII, a las que calific&oacute; de &ldquo;prol&iacute;feras&rdquo;. Se solicitar&aacute; la extensi&oacute;n de los permisos exploratorios y compromete nuevas inversiones para la <em>lengua <\/em>mendocina de Vaca Muerta.<\/strong><\/h5>\n\n\n\n<p>Luego de culminar el proceso de fracturas en los dos pozos que tiene en Malarg&uuml;e con m&aacute;s de 17 millones de d&oacute;lares invertidos, YPF present&oacute; el resultado de los trabajos de exploraci&oacute;n no convencional en el lado mendocino de la formaci&oacute;n Vaca Muerta.<\/p>\n\n\n\n<p>Lo hizo anunciando el compromiso de seguir explorando m&aacute;s all&aacute; del <em>hubcore<\/em> (n&uacute;cleo de la formaci&oacute;n) por los resultados &ldquo;auspiciosos&rdquo; y con estrategias de trabajo que implican m&aacute;s inversiones incluso para 2025.<\/p>\n\n\n\n<p>Hasta el momento, se perforaron un pozo vertical y dos pozos horizontales de 1.074 y 1.059 metros de rama cada uno, en Paso Bardas Norte (Concesi&oacute;n de explotaci&oacute;n) y CN-VII A (permiso exploratorio), con perspectivas de nuevos pozos y m&aacute;s inversiones que rondar&aacute;n los US$30 millones.<\/p>\n\n\n\n<p>&ldquo;Se trata de una noticia muy importante para la industria energ&eacute;tica mendocina, ya que estos resultados posicionan nuevamente a Malarg&uuml;e en el centro de la visi&oacute;n y el futuro energ&eacute;tico&rdquo;, se&ntilde;al&oacute; el subsecretario de Energ&iacute;a y Miner&iacute;a del Ministerio de Energ&iacute;a y Ambiente, Manuel S&aacute;nchez&nbsp;Bandini.<\/p>\n\n\n\n<p>&ldquo;Esto abre un nuevo horizonte de incorporaci&oacute;n de reservas para Mendoza en materia de hidrocarburos, en un momento en el que hay una visi&oacute;n industrializadora para el Sur mendocino, con el Polo Log&iacute;stico e Industrial Pata Mora, que prestar&aacute; servicio a las empresas y servicios que operan en la zona y a todo el desarrollo minero de Malarg&uuml;e Distrito Minero Occidental&rdquo;, ampli&oacute;.<\/p>\n\n\n\n<p>&ldquo;Junto con las 12 &aacute;reas que tenemos en licitaci&oacute;n en la provincia, con un nuevo modelo de licitaci&oacute;n continua, la reactivaci&oacute;n del &aacute;rea petrolera m&aacute;s alta del pa&iacute;s, Vega Grande, por parte de Emesa, y la cesi&oacute;n de derechos de esta &aacute;rea agregamos dinamismo al sector energ&eacute;tico, por el que trabajamos en materia de hidrocarburos&rdquo;, asegur&oacute;.<\/p>\n\n\n\n<p>&ldquo;La llamada <em>lengua mendocina<\/em> de Vaca Muerta no es id&eacute;ntica a la de Neuqu&eacute;n, pero tiene excelentes prospectos de exploraci&oacute;n y los resultados validan el modelo geol&oacute;gico. El paso siguiente es continuar con m&aacute;s inversiones, bajar el riesgo geol&oacute;gico y avanzar en el desarrollo de nuestro reservorio no convencional&rdquo;, concluy&oacute; el subsecretario.<\/p>\n\n\n\n<p><strong>Conclusi&oacute;n de los trabajos<\/strong><\/p>\n\n\n\n<p>En Paso Bardas Norte se realizaron 12 etapas de fracturas hidr&aacute;ulicas. Se inici&oacute; el ensayo el 18 de febrero de 2024, y mostr&oacute; desde sus inicios interesantes porcentajes de petr&oacute;leo de densidad 38&deg;API. Seg&uacute;n consign&oacute; la empresa, alcanz&oacute; con orificios superiores caudales cercanos a  100 m3\/d de bruta.<\/p>\n\n\n\n<p>Actualmente ensaya con 69 m3\/d de bruta y 51% de petr&oacute;leo, con 35 m3\/d al 19\/04 del presente.<\/p>\n\n\n\n<p>En Aguada Negra, en tanto, se realizaron 13 etapas de fracturas hidr&aacute;ulicas. Se inici&oacute; el ensayo y desde sus inicios mostr&oacute; interesantes porcentajes de petr&oacute;leo de 43&deg;API. Actualmente, produce con una bruta de 84 m3\/d y 48% de petr&oacute;leo (41 m3\/d), con un GOR de 1.000 m3\/m3.<\/p>\n\n\n\n<p>Los ensayos de los pozos no convencionales fueron extendidos en el tiempo m&iacute;nimo necesario para poder evaluar correctamente los niveles de reservorio y continuar&aacute;n evaluando su comportamiento. Comenzaron el 18 de febrero de 2024 y se finalizaron el 18 de mayo. Luego se continuar&aacute; con las instalaciones de producci&oacute;n apropiadas.<\/p>\n\n\n\n<p><strong>Pr&oacute;ximos pasos<\/strong><\/p>\n\n\n\n<p>YPF present&oacute; la solicitud para pasar al segundo per&iacute;odo exploratorio en el permiso sobre el &aacute;rea de reserva de CN-VII A, para perforar un nuevo <em>pad <\/em>(locaci&oacute;n de producci&oacute;n) de dos pozos horizontales a mayor profundidad, lo que permitir&iacute;a alcanzar mayor presi&oacute;n de reservorio y, por consiguiente, posible mejor productividad.<\/p>\n\n\n\n<p>En caso de encontrar una productividad y acumulada por pozo tal que el proyecto fuera rentable, abrir&iacute;a para las &aacute;reas (CN-VII A y Paso Bardas Norte) un desarrollo de alrededor de 212 pozos horizontales (org&aacute;nico inferior y org&aacute;nico superior) navegando en dos niveles productivos, en un &aacute;rea total de 102 km2<\/p>\n\n\n\n<p>Existe la posibilidad de desarrollar un tercer nivel de navegaci&oacute;n, que adicionar&iacute;a 122 pozos de desarrollo (cocina).<\/p>\n\n\n\n<p>El plan exploratorio de los bloques contempla realizar, en 2025, un piloto vertical a partir del cual se definir&aacute;n dos niveles a navegar y con dos ramas horizontales de 2.500 metros.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.30.jpeg\"><img loading=\"lazy\" width=\"427\" height=\"475\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.30.jpeg\" alt=\"\" data-id=\"410658\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.30.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=410658\" class=\"wp-image-410658 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.30.jpeg 427w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.30-250x278.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.30-120x133.jpeg 120w\" sizes=\"(max-width: 427px) 100vw, 427px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.29.jpeg\"><img loading=\"lazy\" width=\"551\" height=\"420\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.29.jpeg\" alt=\"\" data-id=\"410659\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.29.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=410659\" class=\"wp-image-410659 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.29.jpeg 551w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.29-250x191.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/05\/WhatsApp-Image-2024-05-21-at-08.11.29-120x91.jpeg 120w\" sizes=\"(max-width: 551px) 100vw, 551px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3.jpg\"><img loading=\"lazy\" width=\"700\" height=\"421\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3-700x421.jpg\" alt=\"\" data-id=\"188619\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/crece-el-lado-mendocino-de-vaca-muerta-con-nuevas-inversiones-y-un-parque-industrial\/vaca-muerta-3-2\/\" class=\"wp-image-188619 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3-700x421.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3-250x150.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3-768x462.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3-120x72.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2019\/06\/vaca-muerta-3.jpg 863w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"La empresa dio a conocer resultados auspiciosos de sus exploraciones en Paso Bardas Norte y CN-VII, a las que calific&oacute; de &ldquo;prol&iacute;feras&rdquo;. Se solicitar&aacute; la extensi&oacute;n de los permisos exploratorios y compromete nuevas inversiones para la lengua mendocina de Vaca Muerta. Luego de culminar el proceso de fracturas en los dos pozos que tiene en&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/ypf-continuara-explorando-en-el-lado-mendocino-de-vaca-muerta-con-inversiones-aproximadas-de-us-30-millones\/\"><\/a>","protected":false},"author":61,"featured_media":188619,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,3042,2711],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/410656"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=410656"}],"version-history":[{"count":6,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/410656\/revisions"}],"predecessor-version":[{"id":410673,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/410656\/revisions\/410673"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/188619"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=410656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=410656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=410656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}