{"id":436202,"date":"2024-10-18T09:27:13","date_gmt":"2024-10-18T12:27:13","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=436202"},"modified":"2024-10-19T11:07:59","modified_gmt":"2024-10-19T14:07:59","slug":"se-presentaron-6-empresas-en-la-licitacion-para-construir-un-nuevo-colegio-en-rodeo-del-medio","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/se-presentaron-6-empresas-en-la-licitacion-para-construir-un-nuevo-colegio-en-rodeo-del-medio\/","title":{"rendered":"Se presentaron 6 empresas en la licitaci\u00f3n para construir un nuevo colegio en Rodeo del Medio"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>El establecimiento educativo de nivel secundario tiene una superficie total a construir de m&aacute;s de 1.600 metros cuadrados y beneficiar&aacute; a 300 alumnos.<\/h5>\n\n\n\n<p>La Subsecretar&iacute;a de Infraestructura y Desarrollo Territorial abri&oacute; los sobres de la licitaci&oacute;n para la construcci&oacute;n de una nueva escuela secundaria que estar&aacute; ubicada en el distrito de Rodeo del Medio, Maip&uacute;.<\/p>\n\n\n\n<p>El acto administrativo se desarroll&oacute; este jueves en el s&eacute;ptimo piso de la Casa de Gobierno y se presentaron 6 oferentes. Se trata de las empresas: Capsa SRL, Estructuras del Oeste SA, Natural Terra SA, Corporaci&oacute;n del Sur SA, Apolo Sur SA y CACSA.<\/p>\n\n\n\n<p>La oferta b&aacute;sica del presupuesto oficial es de $2.332.037.614. Ahora se analizar&aacute;n las ofertas econ&oacute;micas y t&eacute;cnicas para seguir adelante con el proceso licitatorio.<\/p>\n\n\n\n<p>Este Colegio N&ordm;4- 000 Rodeo del Medio tiene una superficie total a construir de 1.680,48 metros cuadrados y las obras beneficiar&aacute;n a cerca de 300 alumnos. Estar&aacute; emplazado en un terreno de grandes dimensiones sobre la calle Necochea entre calle 1, calle 2 y calle 3 del barrio 25 de Julio, Rodeo del Medio, Maip&uacute;.<\/p>\n\n\n\n<p><strong>Los criterios de dise&ntilde;o del nuevo colegio<\/strong><\/p>\n\n\n\n<p>La construcci&oacute;n es tradicional con hormig&oacute;n armado, vigas y columnas vistas, muros de ladrill&oacute;n bolseado visto pintado de color blanco, vidrio, metal, madera. Tendr&aacute; una cubierta de losa de hormig&oacute;n visto maciza y plana.<\/p>\n\n\n\n<p>En cuanto al terreno y su relaci&oacute;n con el entorno, se dise&ntilde;&oacute; un edificio bajo con patios interiores. Para las aulas, se gener&oacute; una secuencia de bloques en forma de peine, vinculadas entre s&iacute; por una circulaci&oacute;n norte-sur que bordea el patio principal.<\/p>\n\n\n\n<p>Estos bloques fueron orientados al norte, para obtener ganancia solar directa sobre esta fachada en invierno. Tambi&eacute;n se proyectaron grandes aberturas con tratamiento de vidrios difusos en sectores estrat&eacute;gicos, con el objetivo de controlar la luz y, a la vez, aprovechar al m&aacute;ximo el recurso solar disponible.<\/p>\n\n\n\n<p>Las aulas se desatacan por tener un patio aula como prolongaci&oacute;n del espacio interior. De ese modo, se permite desarrollar diversas tareas y actividades pedag&oacute;gicas. La intenci&oacute;n fue llevar el aula al exterior, en ciertos horarios y estaciones que lo permitan. Lo mismo se pens&oacute; para el resto de las &aacute;reas: Gobierno, laboratorios y&nbsp;<em>buffet<\/em>.<\/p>\n\n\n\n<p>Por la particularidad de la zona, al norte del terreno se propuso crear una peque&ntilde;a plaza de acceso a la escuela, integrada al patio principal. Esta ser&aacute; &uacute;til para los estudiantes y la comunidad, porque en este sector hay dos paradas de colectivos.<\/p>\n\n\n\n<p>Por &uacute;ltimo, el play&oacute;n deportivo estar&aacute; anexado al&nbsp;<em>buffet<\/em> y alejado de las aulas.<\/p>\n\n\n\n<p><strong>GALER&Iacute;A<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/2-1-700x394.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/2-1-700x394.jpeg\" alt=\"\" data-id=\"436203\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=436203\" class=\"wp-image-436203 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/2-1-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/2-1-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/2-1-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/2-1-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/2-1.jpeg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-700x323.jpg\"><img loading=\"lazy\" width=\"700\" height=\"323\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-700x323.jpg\" alt=\"\" data-id=\"436204\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=436204\" class=\"wp-image-436204 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-700x323.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-250x115.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-768x355.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-1536x709.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-2048x946.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100349-120x55.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-700x323.jpg\"><img loading=\"lazy\" width=\"700\" height=\"323\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-700x323.jpg\" alt=\"\" data-id=\"436205\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=436205\" class=\"wp-image-436205 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-700x323.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-250x115.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-768x355.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-1536x709.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-2048x946.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/20241017_100442-120x55.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54-700x394.jpeg\" alt=\"\" data-id=\"436206\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=436206\" class=\"wp-image-436206 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54-700x394.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54-250x141.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54-768x432.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54-120x68.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/10\/WhatsApp-Image-2024-09-25-at-13.21.54.jpeg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"El establecimiento educativo de nivel secundario tiene una superficie total a construir de m&aacute;s de 1.600 metros cuadrados y beneficiar&aacute; a 300 alumnos. La Subsecretar&iacute;a de Infraestructura y Desarrollo Territorial abri&oacute; los sobres de la licitaci&oacute;n para la construcci&oacute;n de una nueva escuela secundaria que estar&aacute; ubicada en el distrito de Rodeo del Medio, Maip&uacute;&#8230;. <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/se-presentaron-6-empresas-en-la-licitacion-para-construir-un-nuevo-colegio-en-rodeo-del-medio\/\"><\/a>","protected":false},"author":62,"featured_media":436204,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3054,1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/436202"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=436202"}],"version-history":[{"count":4,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/436202\/revisions"}],"predecessor-version":[{"id":436281,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/436202\/revisions\/436281"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/436204"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=436202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=436202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=436202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}