{"id":442495,"date":"2024-11-20T09:10:34","date_gmt":"2024-11-20T12:10:34","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=442495"},"modified":"2024-11-20T10:48:47","modified_gmt":"2024-11-20T13:48:47","slug":"prorrogan-la-apertura-de-dos-licitaciones-de-obras-que-se-construiran-con-los-fondos-del-resarcimiento","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/prorrogan-la-apertura-de-dos-licitaciones-de-obras-que-se-construiran-con-los-fondos-del-resarcimiento\/","title":{"rendered":"Prorrogan la apertura de dos licitaciones de obras que se construir\u00e1n con fondos del resarcimiento"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Las obras en cuesti&oacute;n son la ampliaci&oacute;n del establecimiento depurador en General Alvear y la optimizaci&oacute;n del sistema de distribuci&oacute;n Gran Mendoza Terraza Las Ca&ntilde;as en Guaymall&eacute;n. Del tramo II de la ruta 153 &Ntilde;acu&ntilde;&aacute;n-Monte Com&aacute;n se conocer&aacute;n ma&ntilde;ana las ofertas.<\/h5>\n\n\n\n<p>El Gobierno provincial posterg&oacute;, a pedido de las empresas interesadas, la apertura de sobre con las ofertas de la licitaci&oacute;n de dos importantes obras que se realizar&aacute;n con los fondos del resarcimiento econ&oacute;mico de la Promoci&oacute;n Industrial.<\/p>\n\n\n\n<p>Se trata de los trabajos para la ampliaci&oacute;n del establecimiento depurador en General Alvear y de la optimizaci&oacute;n del sistema de distribuci&oacute;n Gran Mendoza Terraza Las Ca&ntilde;as en Guaymall&eacute;n. Las nuevas fechas son el 4 y 6 de diciembre respectivamente.<\/p>\n\n\n\n<p>Asimismo, ma&ntilde;ana se abrir&aacute;n las ofertas para la licitaci&oacute;n del tramo II de la ruta 153 &Ntilde;acu&ntilde;an-Monte Com&aacute;n en el sureste provincial. Esta obra tiene un presupuesto de 12.500.000 d&oacute;lares, es un ruta productiva y log&iacute;stica y los trabajos consisten en el encarpetado y demarcaci&oacute;n completa de 59 km. Su ubicaci&oacute;n es crucial, porque se trata de un atajo hacia el sur que permite reducir 118 kil&oacute;metros la distancia entre la RN 7 y la ciudad de San Rafael para los que vienen y van desde el Sur provincial al Arco del Desaguadero. Actualmente es utilizada por 941 veh&iacute;culos diarios y 5.647 por semana, de los cuales 40% son autom&oacute;viles; 35,5%, transporte de carga pesada, y 23,5%, camionetas.<\/p>\n\n\n\n<p>Hasta el momento, se han anunciado 18 obras distribuidas en el Gran Mendoza, Valle de Uco, Este y Sur provincial, con una inversi&oacute;n de 273.500.000 d&oacute;lares destinada a optimizar los servicios de agua, cloacas, energ&iacute;a y rutas en el corredor productivo Este-Sur.<\/p>\n\n\n\n<p>Estas obras de infraestructura tienen como objetivo mejorar la eficiencia operativa y responder a la demanda h&iacute;drica. Por eso, se priorizaron proyectos de agua potable y riego con inversiones estrat&eacute;gicamente planificadas.<\/p>\n\n\n\n<p>De esta manera, con los fondos de resarcimiento se persigue un desarrollo equilibrado de los oasis productivos de Mendoza.<\/p>\n\n\n\n<p><strong>El detalle de las dos obras de agua y cloacas que se licitar&aacute;n en diciembre<\/strong><\/p>\n\n\n\n<p><strong>Obra: Optimizaci&oacute;n del Sistema de Distribuci&oacute;n Gran Mendoza &ndash; Terraza &ndash; Las Ca&ntilde;as<\/strong><\/p>\n\n\n\n<p>Ubicaci&oacute;n: Guaymall&eacute;n<\/p>\n\n\n\n<p>Monto: USD 3.000.000<\/p>\n\n\n\n<p>Fecha de licitaci&oacute;n: 17\/10\/24<\/p>\n\n\n\n<p>Ejecuci&oacute;n: 18 meses<\/p>\n\n\n\n<p>Organismo ejecutor: Aysam Descripci&oacute;n: Agua. 35.0000 beneficiados. Optimizaci&oacute;n de agua no contabilizada, macro medici&oacute;n, control de presi&oacute;n y detecci&oacute;n de fugas. Renovaci&oacute;n de materiales, aumento y mejora de la capacidad actual del colector.<\/p>\n\n\n\n<p><strong>Obra: Ampliaci&oacute;n y Refuncionalizaci&oacute;n del Establecimiento Depurador General Alvear&nbsp;<\/strong><\/p>\n\n\n\n<p>Ubicaci&oacute;n: General Alvear<\/p>\n\n\n\n<p>Monto: USD 10.000.000<\/p>\n\n\n\n<p>Fecha de licitaci&oacute;n: 17\/10\/24<\/p>\n\n\n\n<p>Ejecuci&oacute;n: 24 meses<\/p>\n\n\n\n<p>Organismo ejecutor: Aysam<\/p>\n\n\n\n<p>Descripci&oacute;n: Saneamiento. 26.780 beneficiados. Aumenta la capacidad de tratamientos de efluente cloacales en 80%. Ampliaci&oacute;n y nueva infraestructura de la planta actual.<\/p>\n\n\n\n<p><strong>GALER&Iacute;A<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"477\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1-700x477.jpeg\" alt=\"\" data-id=\"442498\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=442498\" class=\"wp-image-442498 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1-700x477.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1-250x170.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1-768x523.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1-120x82.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/agua-y-saneamiento-1.jpeg 1196w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1-700x394.jpg\" alt=\"\" data-id=\"442499\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=442499\" class=\"wp-image-442499 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1-700x394.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1-768x432.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1-1536x864.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1-2048x1152.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/DJI_0365-1-120x68.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1-700x525.jpg\" alt=\"\" data-id=\"442500\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=442500\" class=\"wp-image-442500 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1-700x525.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1-250x188.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1-768x576.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1-120x90.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/impermeabilizacion-1.jpg 1040w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"466\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1-700x466.jpeg\" alt=\"\" data-id=\"442501\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=442501\" class=\"wp-image-442501 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1-700x466.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1-250x167.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1-768x512.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1-1536x1023.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1-120x80.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2024\/11\/planta-depuradora-1.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Las obras en cuesti&oacute;n son la ampliaci&oacute;n del establecimiento depurador en General Alvear y la optimizaci&oacute;n del sistema de distribuci&oacute;n Gran Mendoza Terraza Las Ca&ntilde;as en Guaymall&eacute;n. Del tramo II de la ruta 153 &Ntilde;acu&ntilde;&aacute;n-Monte Com&aacute;n se conocer&aacute;n ma&ntilde;ana las ofertas. El Gobierno provincial posterg&oacute;, a pedido de las empresas interesadas, la apertura de sobre&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/prorrogan-la-apertura-de-dos-licitaciones-de-obras-que-se-construiran-con-los-fondos-del-resarcimiento\/\"><\/a>","protected":false},"author":62,"featured_media":442498,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1801],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/442495"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=442495"}],"version-history":[{"count":7,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/442495\/revisions"}],"predecessor-version":[{"id":442534,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/442495\/revisions\/442534"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/442498"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=442495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=442495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=442495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}