{"id":457835,"date":"2025-02-27T23:40:38","date_gmt":"2025-02-28T02:40:38","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=457835"},"modified":"2025-02-28T10:09:26","modified_gmt":"2025-02-28T13:09:26","slug":"el-ministro-garcia-zalazar-recorrio-los-avances-de-la-remodelacion-integral-en-la-drpj-en-godoy-cruz","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/el-ministro-garcia-zalazar-recorrio-los-avances-de-la-remodelacion-integral-en-la-drpj-en-godoy-cruz\/","title":{"rendered":"El ministro Garc\u00eda Zalazar recorri\u00f3 los avances de la remodelaci\u00f3n integral en la DRPJ, en Godoy Cruz"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><p><strong>Las obras, a cargo de la Subsecretar&iacute;a de Infraestructura del Ministerio de Educaci&oacute;n, muestran un progreso que supera el 95% y est&aacute; previsto que concluyan en marzo. Abarcan la refacci&oacute;n de los sanitarios, comedor, play&oacute;n deportivo y sala de monitoreo, entre otras intervenciones. <\/strong><\/p>\n\n\n\n<p>El ministro de Educaci&oacute;n, Cultura, Infancias y DGE, Tadeo Garc&iacute;a Zalazar, recorri&oacute; este jueves las obras de remodelaci&oacute;n integral de la Direcci&oacute;n de Responsabilidad Penal Juvenil (DRPJ) y destac&oacute; los avances y la importancia que tienen estos trabajos para la vida cotidiana de los internos.<\/p>\n\n\n\n<p>Las tareas, que lleva adelante la Subsecretar&iacute;a de Infraestructura del Ministerio, muestran un avance que supera el 95% y est&aacute; previsto que concluyan en marzo. Una vez terminadas, habr&aacute;n demandado una<br>inversi&oacute;n total de $500 millones, que fueron financiados &iacute;ntegramente con fondos provinciales.<\/p>\n\n\n\n<p>&ldquo;Estamos trabajando sin pausa para mejorar las condiciones de habitabilidad de los j&oacute;venes que pasan sus d&iacute;as dentro de este edificio. Por esto, decidimos ejecutar estas obras que eran muy necesarias y urgentes, para ofrecerle espacios renovados y confortables tanto a quienes cumplen con su pena como a los operadores que trabajan aqu&iacute;&rdquo;, se&ntilde;al&oacute; el funcionario durante la recorrida por las instalaciones.<\/p>\n\n\n\n<p>Adem&aacute;s de Garc&iacute;a Zalazar, la visita estuvo compuesta por la subsecretaria de Infancias, Adolescencias y Juventudes, Ver&oacute;nica &Aacute;lvarez Ocampos; el director de la DRPJ, Daniel Pati&ntilde;o, y un equipo de jueces de menores de la primera circunscripci&oacute;n, de San Mart&iacute;n y Tunuy&aacute;n, quienes tambi&eacute;n pudieron observar los avances de obra del establecimiento de responsabilidad penal juvenil ubicado en Godoy Cruz.<\/p>\n\n\n\n<p><strong>Remodelaci&oacute;n y modernizaci&oacute;n en una misma obra <\/strong><\/p>\n\n\n\n<p>El Ministerio de Educaci&oacute;n, Cultura, Infancias y DGE est&aacute; a punto de concluir la remodelaci&oacute;n integral del edificio del DRPJ, en Godoy Cruz. La obra fue dise&ntilde;ada en 2024 para ofrecer mejores espacios y mayores comodidades para los j&oacute;venes que est&aacute;n alojados. Se trata de una primera etapa de trabajos, que cuenta con una inversi&oacute;n de $500 millones.<\/p>\n\n\n\n<p>La intervenci&oacute;n incluye la remodelaci&oacute;n de dos sectores de internaci&oacute;n, con comedores para los j&oacute;venes internados, ba&ntilde;os y dep&oacute;sitos para los operadores. Tambi&eacute;n se construy&oacute; y se inaugur&oacute; un nuevo play&oacute;n deportivo de hormig&oacute;n, destinado a pr&aacute;cticas deportivas, donde los internados ya realizan actividades saludables.<\/p>\n\n\n\n<p>A estas tareas se sum&oacute; la reparaci&oacute;n integral de techos en varios sectores del edificio y se est&aacute; ejecutando por estos d&iacute;as una oficina t&eacute;cnica para monitoreo, que ser&aacute; compartida con una sala de situaci&oacute;n, con un avance actual de supera el 40%. Tambi&eacute;n se instalaron nuevas c&aacute;maras de seguridad en varios sectores del edificio.<\/p>\n\n\n\n<p>En la actualidad, las obras muestran un avance de 95% y est&aacute; previsto que concluyan en marzo, con el objetivo de que los j&oacute;venes puedan comenzar a tener las renovadas instalaciones lo antes posible.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2.jpg\"><img loading=\"lazy\" width=\"700\" height=\"495\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2-700x495.jpg\" alt=\"\" data-id=\"457836\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457836\" class=\"wp-image-457836 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2-700x495.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2-250x177.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2-768x543.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2-1536x1086.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2-2048x1448.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_8-2-120x85.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14.jpg\"><img loading=\"lazy\" width=\"700\" height=\"467\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14-700x467.jpg\" alt=\"\" data-id=\"457837\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457837\" class=\"wp-image-457837 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14-700x467.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14-250x167.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14-768x512.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14-1536x1024.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14-2048x1365.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_14-120x80.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"475\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1-700x475.jpg\" alt=\"\" data-id=\"457838\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457838\" class=\"wp-image-457838 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1-700x475.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1-250x170.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1-768x521.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1-1536x1043.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1-2048x1390.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_1-1-120x81.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1.jpg\"><img loading=\"lazy\" width=\"700\" height=\"517\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1-700x517.jpg\" alt=\"\" data-id=\"457839\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457839\" class=\"wp-image-457839 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1-700x517.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1-250x185.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1-768x567.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1-1536x1134.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1-2048x1512.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_13-1-120x89.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106.jpg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106-700x394.jpg\" alt=\"\" data-id=\"457840\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457840\" class=\"wp-image-457840 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106-700x394.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106-768x432.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106-1536x865.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106-2048x1153.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_106-120x68.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103.jpg\"><img loading=\"lazy\" width=\"700\" height=\"445\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103-700x445.jpg\" alt=\"\" data-id=\"457841\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457841\" class=\"wp-image-457841 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103-700x445.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103-250x159.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103-768x488.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103-1536x975.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103-2048x1300.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_103-120x76.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105.jpg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105-700x394.jpg\" alt=\"\" data-id=\"457842\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457842\" class=\"wp-image-457842 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105-700x394.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105-768x432.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105-1536x865.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105-2048x1153.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_105-120x68.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102.jpg\"><img loading=\"lazy\" width=\"700\" height=\"445\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102-700x445.jpg\" alt=\"\" data-id=\"457843\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457843\" class=\"wp-image-457843 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102-700x445.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102-250x159.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102-768x488.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102-1536x977.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102-2048x1302.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_102-120x76.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108.jpg\"><img loading=\"lazy\" width=\"700\" height=\"394\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108-700x394.jpg\" alt=\"\" data-id=\"457844\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=457844\" class=\"wp-image-457844 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108-700x394.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108-250x141.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108-768x432.jpg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108-1536x865.jpg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108-2048x1153.jpg 2048w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/02\/DRPJ_108-120x68.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Las obras, a cargo de la Subsecretar&iacute;a de Infraestructura del Ministerio de Educaci&oacute;n, muestran un progreso que supera el 95% y est&aacute; previsto que concluyan en marzo. Abarcan la refacci&oacute;n de los sanitarios, comedor, play&oacute;n deportivo y sala de monitoreo, entre otras intervenciones. El ministro de Educaci&oacute;n, Cultura, Infancias y DGE, Tadeo Garc&iacute;a Zalazar, recorri&oacute;&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/el-ministro-garcia-zalazar-recorrio-los-avances-de-la-remodelacion-integral-en-la-drpj-en-godoy-cruz\/\"><\/a>","protected":false},"author":78,"featured_media":457837,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[12],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/457835"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/78"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=457835"}],"version-history":[{"count":3,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/457835\/revisions"}],"predecessor-version":[{"id":457902,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/457835\/revisions\/457902"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/457837"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=457835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=457835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=457835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}