{"id":474401,"date":"2025-05-16T08:51:34","date_gmt":"2025-05-16T11:51:34","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=474401"},"modified":"2025-05-16T09:44:22","modified_gmt":"2025-05-16T12:44:22","slug":"inversion-de-mas-de-1-700-millones-en-uspallata-para-mejorar-el-servicio-electrico-a-158-familias","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/inversion-de-mas-de-1-700-millones-en-uspallata-para-mejorar-el-servicio-electrico-a-158-familias\/","title":{"rendered":"Inversi\u00f3n de m\u00e1s de $1.700 millones en Uspallata para mejorar el servicio el\u00e9ctrico a 158 familias"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>El Ministerio de Energ&iacute;a y Ambiente firm&oacute; un convenio con Edemsa para ejecutar obras de normalizaci&oacute;n el&eacute;ctrica en el barrio Altos Verdes-Cord&oacute;n de Bonilla. La intervenci&oacute;n beneficiar&aacute; directamente a 158 familias y extender&aacute; el servicio a m&aacute;s de 500 hogares potenciales.<\/h5>\n\n\n\n<p>En un nuevo paso hacia la inclusi&oacute;n energ&eacute;tica y el fortalecimiento de la infraestructura el&eacute;ctrica en sectores vulnerables, el Ministerio de Energ&iacute;a y Ambiente suscribi&oacute; un convenio con la Empresa Distribuidora de Electricidad de Mendoza SA (Edemsa) para financiar la obra de electrificaci&oacute;n en el barrio Altos Verdes-Cord&oacute;n de Bonilla, en Uspallata, Las Heras. Desde el Municipio acompa&ntilde;ar&aacute;n en lo operativo para dar la mayor celeridad posible a la obra.<\/p>\n\n\n\n<p>El proyecto tendr&aacute; una inversi&oacute;n superior a  $1.700 millones, provenientes del Fondo Especial para el Desarrollo El&eacute;ctrico del Interior (FEDEI). Contempla la normalizaci&oacute;n del suministro mediante medici&oacute;n individual para 158 familias, actualmente incluidas en el programa de medidores comunitarios.<\/p>\n\n\n\n<p>Alejandro Mas, director de Servicios El&eacute;ctricos del Ministerio, destac&oacute; que la obra traer&aacute; significativas mejoras en la calidad del servicio, la seguridad del suministro y la iluminaci&oacute;n p&uacute;blica del barrio.<\/p>\n\n\n\n<p>La ejecuci&oacute;n estar&aacute; a cargo de Edemsa e incluir&aacute; la instalaci&oacute;n de tres subestaciones transformadoras, el tendido de 800 metros de red de Media Tensi&oacute;n y aproximadamente 10 kil&oacute;metros de red de baja tensi&oacute;n, lo que permitir&aacute; abastecer una demanda estimada de 1400 KW y ampliar la cobertura a potenciales 500 usuarios.<\/p>\n\n\n\n<p>Esta intervenci&oacute;n forma parte del compromiso del Gobierno de Mendoza por garantizar el acceso equitativo a servicios esenciales y avanzar hacia un modelo energ&eacute;tico inclusivo, seguro y sostenible.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/10\/WhatsApp-Image-2020-10-01-at-13.37.39.jpeg\"><img loading=\"lazy\" width=\"581\" height=\"1032\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/10\/WhatsApp-Image-2020-10-01-at-13.37.39.jpeg\" alt=\"\" data-id=\"244530\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/10\/WhatsApp-Image-2020-10-01-at-13.37.39.jpeg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/servicios-publicos-el-compromiso-de-los-trabajadores-esenciales-durante-la-emergencia-sanitaria\/whatsapp-image-2020-10-01-at-13-37-39\/\" class=\"wp-image-244530 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/10\/WhatsApp-Image-2020-10-01-at-13.37.39.jpeg 581w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/10\/WhatsApp-Image-2020-10-01-at-13.37.39-250x444.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2020\/10\/WhatsApp-Image-2020-10-01-at-13.37.39-120x213.jpeg 120w\" sizes=\"(max-width: 581px) 100vw, 581px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/luz.jpg\"><img loading=\"lazy\" width=\"700\" height=\"511\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/luz-700x511.jpg\" alt=\"\" data-id=\"120161\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/luz.jpg\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/consejos-para-ahorrar-energia-sin-resignar-confort\/luz\/\" class=\"wp-image-120161 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/luz-700x511.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/luz-250x182.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/luz-120x88.jpg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2018\/01\/luz.jpg 759w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"El Ministerio de Energ&iacute;a y Ambiente firm&oacute; un convenio con Edemsa para ejecutar obras de normalizaci&oacute;n el&eacute;ctrica en el barrio Altos Verdes-Cord&oacute;n de Bonilla. La intervenci&oacute;n beneficiar&aacute; directamente a 158 familias y extender&aacute; el servicio a m&aacute;s de 500 hogares potenciales. En un nuevo paso hacia la inclusi&oacute;n energ&eacute;tica y el fortalecimiento de la infraestructura&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/inversion-de-mas-de-1-700-millones-en-uspallata-para-mejorar-el-servicio-electrico-a-158-familias\/\"><\/a>","protected":false},"author":61,"featured_media":120161,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,3038,2711],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/474401"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=474401"}],"version-history":[{"count":9,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/474401\/revisions"}],"predecessor-version":[{"id":474450,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/474401\/revisions\/474450"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/120161"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=474401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=474401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=474401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}