{"id":480486,"date":"2025-06-15T13:40:03","date_gmt":"2025-06-15T16:40:03","guid":{"rendered":"https:\/\/www.mendoza.gov.ar\/prensa\/?p=480486"},"modified":"2025-06-16T10:13:52","modified_gmt":"2025-06-16T13:13:52","slug":"vialidad-mendoza-firmo-dos-contratos-por-5-700-millones-para-iniciar-dos-nuevas-obras","status":"publish","type":"post","link":"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-firmo-dos-contratos-por-5-700-millones-para-iniciar-dos-nuevas-obras\/","title":{"rendered":"Vialidad Mendoza firm\u00f3 dos contratos por $5.700 millones para iniciar dos nuevas obras"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<html><body><h5>Se trata de la Ruta Provincial 33 y el ordenador vial de Tunuy&aacute;n.<br>La Direcci&oacute;n Provincial de Vialidad (DPV) firm&oacute; esta semana los contratos que permitir&aacute;n iniciar dos importantes obras, una para Maip&uacute;, Guaymall&eacute;n y Lavalle, y la otra, para Tunuy&aacute;n.&nbsp;<\/h5>\n\n\n\n<p>La primera obra es la repavimentaci&oacute;n de un tramo de la Ruta Provincial 33, ubicada en la triple frontera de los tres primeros departamentos mencionados, y la segunda es el ordenador vial de calle Melchor Villanueva y Ruta Nacional 40, en el Valle de Uco.&nbsp;<\/p>\n\n\n\n<p>Luego de que las obras fueron adjudicadas tras los llamados a licitaci&oacute;n, el<br>administrador general de la DPV, Osvaldo Romagnoli, firm&oacute; los contratos de inicio de obra con Sebasti&aacute;n Chalabe, apoderado de la firma Green SA, que se encargar&aacute; de la repavimentaci&oacute;n de la RP 33, y con Ricardo Ramos, presidente de Constructora San Guillermo SA, que construir&aacute; el intercambiador vial de Melchor Villanueva y RN 40, en Tunuy&aacute;n.&nbsp;<\/p>\n\n\n\n<p>En la firma del contrato de la obra de Tunuy&aacute;n tambi&eacute;n estuvo presente la delegada por Mendoza de la Direcci&oacute;n Nacional de Vialidad, Emilce Lozano, ya que parte de la intervenci&oacute;n ser&aacute; en la Ruta Nacional 40.<\/p>\n\n\n\n<p>La obra de la RP 33 costar&aacute;, finalmente, $4.494.743.449, con un ahorro de m&aacute;s de $500 millones de pesos para Vialidad Mendoza, que hab&iacute;a presupuestado la obra en 5 mil millones de pesos.&nbsp;<\/p>\n\n\n\n<p>Por su parte, la obra del ordenador vial de Tunuy&aacute;n, que mejorar&aacute; el ingreso a la ciudad y el desv&iacute;o de carga pesada, costar&aacute; $1.197.887.325, contra los 1.200 millones de pesos que hab&iacute;a presupuestado la DPV.&nbsp;<\/p>\n\n\n\n<p>En ambos casos se trata de dos obras que prev&eacute;n una reconstrucci&oacute;n completa en el lugar de intervenci&oacute;n. El tramo de 5 kil&oacute;metros que se intervendr&aacute; en la RP 33, entre la RP 20 y la RP 31, implicar&iacute;a pr&aacute;cticamente la construcci&oacute;n de una nueva ruta ya que la existente est&aacute; muy deteriorada.<\/p>\n\n\n\n<p>En el cruce de Melchor Villanueva y Ruta Nacional 40, en Tunuy&aacute;n, actualmente existe un tri&aacute;ngulo vial para el desv&iacute;o de carga pesada que ser&aacute; remplazado por una rotonda de importantes dimensiones que garantice el tr&aacute;nsito de veh&iacute;culos pesados y livianos sin riesgos de accidentes de tr&aacute;nsito.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-12.49.22-1-700x525.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"525\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-12.49.22-1-700x525.jpeg\" alt=\"\" data-id=\"480491\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=480491\" class=\"wp-image-480491 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-12.49.22-1-700x525.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-12.49.22-1-250x188.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-12.49.22-1-768x576.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-12.49.22-1-120x90.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-12.49.22-1.jpeg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1-700x463.jpeg\"><img loading=\"lazy\" width=\"700\" height=\"463\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1-700x463.jpeg\" alt=\"\" data-id=\"480492\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=480492\" class=\"wp-image-480492 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1-700x463.jpeg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1-250x165.jpeg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1-768x508.jpeg 768w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1-1536x1016.jpeg 1536w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1-120x79.jpeg 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/WhatsApp-Image-2025-06-15-at-13.05.42-1.jpeg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-2.jpg\"><img loading=\"lazy\" width=\"700\" height=\"700\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-2.jpg\" alt=\"\" data-id=\"480493\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=480493\" class=\"wp-image-480493 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-2.jpg 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-2-250x250.jpg 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-2-150x150.jpg 150w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-2-120x120.jpg 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-700x401.png\"><img loading=\"lazy\" width=\"700\" height=\"401\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-700x401.png\" alt=\"\" data-id=\"480494\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=480494\" class=\"wp-image-480494 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-700x401.png 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-250x143.png 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-120x69.png 120w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa.png 733w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-1.png\"><img loading=\"lazy\" width=\"700\" height=\"276\" src=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-1.png\" alt=\"\" data-id=\"480495\" data-full-url=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-1.png\" data-link=\"https:\/\/www.mendoza.gov.ar\/prensa\/?attachment_id=480495\" class=\"wp-image-480495 img-responsive center-block\" srcset=\"https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-1.png 700w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-1-250x99.png 250w, https:\/\/www.mendoza.gov.ar\/wp-content\/uploads\/sites\/5\/2025\/06\/mapa-1-120x47.png 120w\" sizes=\"(max-width: 700px) 100vw, 700px\"><\/a><\/figure><\/li><\/ul><\/figure>\n<\/body><\/html>\n","protected":false},"excerpt":{"rendered":"Se trata de la Ruta Provincial 33 y el ordenador vial de Tunuy&aacute;n.La Direcci&oacute;n Provincial de Vialidad (DPV) firm&oacute; esta semana los contratos que permitir&aacute;n iniciar dos importantes obras, una para Maip&uacute;, Guaymall&eacute;n y Lavalle, y la otra, para Tunuy&aacute;n.&nbsp; La primera obra es la repavimentaci&oacute;n de un tramo de la Ruta Provincial 33, ubicada&#8230; <a class=\"view-article\" href=\"https:\/\/www.mendoza.gov.ar\/prensa\/vialidad-mendoza-firmo-dos-contratos-por-5-700-millones-para-iniciar-dos-nuevas-obras\/\"><\/a>","protected":false},"author":61,"featured_media":480491,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[20,1801,2711,2999],"tags":[],"_links":{"self":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/480486"}],"collection":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/comments?post=480486"}],"version-history":[{"count":11,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/480486\/revisions"}],"predecessor-version":[{"id":480520,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/posts\/480486\/revisions\/480520"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media\/480491"}],"wp:attachment":[{"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/media?parent=480486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/categories?post=480486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mendoza.gov.ar\/prensa\/wp-json\/wp\/v2\/tags?post=480486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}